ORDINARY MEETING AGENDA 21 JUNE 2018
Amended plans
3. Prior to the issue of a Development Permit for Building Works amended plans
must be submitted to Council providing details of the finishes and materials of
the shipping container, link-way and barn. The plans must demonstrate that
buildings and other structures use materials and finishes that complement the
village character of Kin Kin and integrate with the surrounding natural
landscape and include the following as a minimum:
a. Link-way and barn uprights to be constructed of timber;
b. Link-way and barn roofs to be of a colour and material consistent with the
rural character of the locality;
c. The exterior finish of the shipping container must be painted in muted
tones or clad in a muted material.
The appearance of all structures, including the shipping container, must be
maintained at all times.
Nature and Extent of Approved Use
4. The use of new undercover dining area must not operate outside of the hours
7am – 10pm and be used a maximum of three days per week.
5. Patrons in the new undercover dining area must not exceed 60 persons.
6. Patrons on the existing deck dining area must not exceed 40 persons.
7. The new undercover dining and link-way areas must be in accordance with the
approved plan, with no more than 192m2 used for dining.
8. Service vehicle movements associated with the approved use (including
loading and unloading) must not occur outside the hours of 6am to 6pm
Monday to Saturday, and not at all on Sundays or public holidays.
Noise
9. External speakers or amplified music are not permitted.
10. Refuse disposal, particularly glass bottles and the like, must be considerate of
noise at all times.
11. Management must ensure patrons leave the premises and street frontage
promptly after nightly closing time and do not mingle or otherwise cause noise
nuisance.
12. Noise emissions from any new air-conditioning and refrigeration equipment
associated with the development shall comply with the following requirements:
a. 7am to 10pm: Background + 5dB(A)
b. 10pm to 7am: Background + 3dB(A)
WASTE
Waste Disposal
13. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”. The facilities must include an external
impervious area correctly sized for all refuse and recycling containers and
suitably screened from public places and neighbouring properties. A bin wash
area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet must be designed to prevent storm
water entry to the sewerage system. This can be achieved with a nib wall
50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively the
waste area can be roofed, or any other design approved by Council.
Page 19 of 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.