               33.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               34.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               35.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               36.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               37.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               38.    All earthworks and associated retaining structures/batters, both above and below ground,
                      both temporary and permanent, must be undertaken in accordance with an Operational
                      Works approval, be generally in accordance with the approved plans and contained entirely
                      within the subject site unless written permission from the respective landowner(s) is provided
                      to Council.
               39.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               40.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                                   Date

                S22-011                C      Stormwater Management Report prepared by 17/07/2025
                                              Westera

                LD1                    E      Drawing Schedule, Specifications prepared by Bird 25/11/2025
                                              Landscape Design

                LD2                    E      Finishes and Planting Schedules prepared by Bird 25/11/2025
                                              Landscape Design
                                              as annotated by Council

                LD3                    E      Details prepared by Bird Landscape Design            25/11/2025



                                                                                                      Page 6 of 16
Document Set ID: 24381517
Version: 4, Version Date: 17/12/2025
Log in to download the original file

SUPERSEDED - Approved Decision Notice - MCU25 0079 [As Published].pdf · 513 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.