Original source · versioned page text
Information Response Amended Town Planning Report (1)
more sustainable transport
options. We note that 5 bus
stops are within a 500m
radius of the subject site and
designated street parking
exists on the immediate site
frontage. The site is a
2-minute walk to the main
commercial street and a 15
minute bike ride to the
beach.
In accordance with 3.3.6(d)
of the Strategic Framework,
“priority is given to places for
people rather than places for
cars. Transport infrastructure
and services prioritise
pedestrians, cyclists, motor
scooters and public transport
over private cars.”
In this regard, the proposed
development provides
alternative, sustainable
transport options aligning
with the Strategic
Framework.
PO16 AO16.1 The proposed development
Development maintains the Development, including will occur within an existing
safety of people, property associated access, is not building. This overlay has
and hazardous materials located on land identified as been addressed by a building
stored in bulk from the risk a landslide hazard area on a certifier and prior Council
of landslide. Landslide Hazard Overlay approvals.
Map.
AO16.2 The proposed development
Development, including will occur within an existing
associated access, is located building. This overlay has
outside moderate, high and been addressed by a building
very high landslide hazard certifier and prior Council
areas and areas with 15% approvals.
slope or greater, as
determined by a site-specific
slope-analysis.
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.