Eddie Venturini

 

ae
From: Leah Snerling <[email protected]>
Sent: Tuesday, 6 January 2015 8:32 AM
To: Eddie Venturini
Ce: Andrew van Tonder; Gavin Nye
Subject: RE: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2
Hi Eddie,
Yes, this sounds like a good solution and is acceptable to us.
Regards,
Leah

Leah Snerling Senior Land Use Planner

@sewate GOH

117 Brisbane Street, Ipswich, QLD, 4305 | PO Box 16146, City East, QLD 4002
p (07) 3035 5562 | m 0427 910 259 | f (07) 3229 7926
e [email protected] | w www.seqwater.com.au

 

 

 

Please consider the environment before printing this email. It can take up to 13 litres of water to make one sheet of A4 paper.
ot. @ Se

a ee

QUEENSLAND

 

 

From: Eddie Venturini [mailto:[email protected]]

Sent: Monday, 5 January 2015 7:38 AM

To: Leah Snerling

Cc: Andrew van Tonder; Gavin Nye

Subject: RE: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

Thanks Leah for the response.

Are you comfortable for the Weeding Management Plan and Rehabilitation plan and the Inspection and
Maintenance schedule and an Emergency Response and contingency plan for the pump station to be both
submitted for approval prior to issue of any operational works approval for the site, so that we can suggest this as
the trigger point for council to set timing for the conditions. That way they can be endorsed before any construction
works commence on the site as you have suggested.

Kind Regards

Eddie Venturini Principal - Town Planning Saunders Havill Group
direct line (07) 3251 9421 mobile 0447 119 353 email [email protected]
phone 1300 123 SHG web www.saundershavill.com head office 9 Thompson St Bowen Hills Q 4006

 
Log in to download the original file

seq water 5.02.pdf · 830 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

Season’s Greetings from Saunders Havill Group

Our office will be closed from midday Friday 19 December 2014
and will reopen Monday 5 January 2015

 

Brisbane / Emerald / Gladstone

Surveying / Town Planning / Urban Design / Environmental Management / Landscape Architecture

The information transmitted is for the use of the intended recipient only and may contain confidential and/or legally privileged material. Any review, re-transmission,
disclosure, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If
you have received this email in error please delete all copies of this transmission together with any attachments and notify the sender. Opinions, conclusions and other
information in this email that do not relate to the official business of Saunders Havill Group shall be understood as neither given nor endorsed by it. We have taken
precautions to minimise the risk of transmitting software viruses, but we advise you to carry out your own virus checks on any attachment to this message. We cannot
accept liability for any loss or damage caused by software viruses,

From: Leah Snerling {mailto:[email protected]]

Sent: Tuesday, 23 December 2014 3:12 PM

To: Andrew van Tonder

Cc: Eddie Venturini

Subject: RE: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

Good afternoon Andrew,

Thank you for providing the additional information we requested on the Cooroy mixed-use development. | have
reviewed the documentation and am satisfied that stormwater management, setbacks to the minor watercourse
and general treatment of the riparian corridor are in accordance with the Seqwater Development Guidelines. There
are a few points that were made informally (in emails) or touched upon in reports that I’d like to confirm regarding
both the riparian buffer and the pump station, and also some uncertainties around the proposed pump station in
the absence of a report addressing this particular element of the proposal. To address these areas, | can provide the
following advice / recommendations:

¢ Seqwater supports the 20m average setback and riparian buffer width for all uses to the minor stream on
the subject site. The 10m additional buffer strip affords important additional protection to the watercourse
and riparian vegetation, given the high impact nature of some uses proposed. The response letter prepared
by Saunders Havill Group (Keira Grundy, dated 20 November 2014) and the Ecological Assessment Report
(EAR -prepared by Saunders Havill Group, dated 24 June 2014) both make brief reference to weeding and
revegetation of the 20m riparian buffer area, however no Rehabilitation and Weeding Management Plan
has been provided with the application material. The Landscape Masterplan (Prepared by Saunders Havill
Group, dated 10 February 2014) makes reference only to weeding in the riparian buffer area and planting in
the additional 10m buffer strip.

Given the degraded state of the existing riparian buffer (as evidenced in the aforementioned environmental
advices) and the high impact nature of some of the proposed uses within a drinking water supply
catchment, Seqwater considers it appropriate for a staged rehabilitation plan, including select and
controlled weeding and revegetation to be developed for the existing riparian buffer. This should occur in
addition to the proposed planting in the 10m buffer strip. It is recommended that a Rehabilitation and Weed
Management Plan is prepared by a qualified professional at the appropriate stage of development and
approved / endorsed by Council prior to development commencing on the site. Seqwater requests a copy of
any such plan for review when available.

e The Water and Sewerage Network Analysis (prepared by GHD, dated November 2014) mentions that it does
not cover internal site servicing. No report specifically addressing the private pump station required on site
has been prepared, therefore no information exists as to the capacity, maintenance or emergency response
measures associated with this infrastructure. Seqwater recommends the preparation of an Inspection and
Maintenance Schedule and an Emergency Response and Contingency Plan for the pump station.. This

Page 3

should be endorsed / approved by the relevant authorities (Council, DEHP). Seqwater requests a copy of any
such plan for review when available.

e Should the location of the proposed on-site sewerage pump station change, Seqwater requires that this
facility maintains at least a 50m setback from the surveyed high bank of the watercourse on the site.

« Seqwater strongly supports provision of at least 25% and up to 50% more emergency storage capacity at
the pump station, than that required by the SEQ Sewer and Water Code.

e Seqwater requests to be included ona notification register in the event of any overflow / spill / other
sewage discharge event

Many thanks for your consultation in relation to the proposed development. If there is any further advice or
clarification you require, please contact me directly.

Kind regards,

Leah Snerling Senior Land Use Planner

@seqwater GOH

117 Brisbane Street, Ipswich, QLD, 4305 | PO Box 16146, City East, QLD 4002
p (07) 3035 5552 | m 0427 910 259 | f (07) 3229 7926
e [email protected] | w www.seqwater.com.au

 

  

 

 

Please consider the environment before printing this email. It can take up to 13 litres of water to make one sheet of A4 paper.

Our rangers can't be everywhere to help yo :
| ‘ ‘ cet apie
Play it safe this summer am ert]

QUEENSLAND:

   

seqwater.com.au/play

 

From: Andrew van Tonder [mailto:[email protected]
Sent: Wednesday, 17 December 2014 10:34 AM
To: 'Eddie Venturini’; Leah Snerling

Cc: 'Gavin Nye’; [email protected]
Subject: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

Hi Leah

The proposed pump station is shown on drawing P003 and is about 50m from the stream/ waterway.

Also please find attached the sewer and water analysis report that has more information on the proposed pump
station. The pump station would have a warning system in the event of an emergency and we are proposing to have
emergency storage that is 25-50% larger than is required by the SEQ Sewer and Water Code. Also in the event that
both pumps stop working, the owner could stop all uses on site.

Please do not hesitate to contact me should you require any further information.

Kind Regards,

Andrew van Tonder

Page 4

Civil Engineer

M_ 0435 789 855

E [email protected]
A PO Box 26 Carina Q 4152

C) W www.vtce.com.au
This message contains confidential information and is intended only for the individual named. If you are not the named

addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if
vT CO N S U LTl N G you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be
E N G I N E E R Ss guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or
incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents
of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. vT Consulting Engineers, M: 0435
789 855, E: [email protected], A: PO Box 26 Carina QLD 4152.

 

From: Eddie Venturini [mailto:[email protected]]

Sent: Wednesday, 17 December 2014 9:12 AM

To: Leah Snerling

Cc: Andrew van Tonder; Gavin Nye

Subject: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

 

Thanks Leah- we actually finish up this Friday at 12 or so and return on the 5" Jan. | appreciate if you could send an
email response to Anrew Van Tonder ([email protected] ) next week when you have prepared the reply, as he
will be the one undertaking any further work addressing water quality f required, :

Many Thanks,

Eddie Venturini Principal - Town Planning Saunders Havill Group
direct line (07) 3251 9421 mobile 0447 119 353 email [email protected]
phone 1300 123 SHG web www.saundershavill.com head office 9 Thompson St Bowen Hills Q 4006

Season’s Greetings from Saunders Havill Group

Our office will be closed from midday Friday 19 December 2014
and will reopen Monday 5 January 2015

 

Brisbane / Emerald / Gladstone

Surveying / Town Planning / Urban Design / Environmental Management / Landscape Architecture

The information transmitted is for the use of the intended recipient only and may contain confidential and/or legally privileged material. Any review, re-transmission,
disclosure, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If
you have received this email in error please delete all copies of this transmission together with any attachments and notify the sender. Opinions, conclusions and other
information in this email that do not relate to the official business of Saunders Havill Group shall be understood as neither given nor endorsed by it. We have taken
precautions to minimise the risk of transmitting software viruses, but we advise you to carry out your own virus checks on any attachment to this message. We cannot
accept liability for any loss or damage caused by software viruses.

From: Leah Snerling [mailto:[email protected]]

Sent: Wednesday, 17 December 2014 8:50 AM

To: Eddie Venturini

Subject: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.