Season’s Greetings from Saunders Havill Group

Our office will be closed from midday Friday 19 December 2014
and will reopen Monday 5 January 2015

 

Brisbane / Emerald / Gladstone

Surveying / Town Planning / Urban Design / Environmental Management / Landscape Architecture

The information transmitted is for the use of the intended recipient only and may contain confidential and/or legally privileged material. Any review, re-transmission,
disclosure, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If
you have received this email in error please delete all copies of this transmission together with any attachments and notify the sender. Opinions, conclusions and other
information in this email that do not relate to the official business of Saunders Havill Group shall be understood as neither given nor endorsed by it. We have taken
precautions to minimise the risk of transmitting software viruses, but we advise you to carry out your own virus checks on any attachment to this message. We cannot
accept liability for any loss or damage caused by software viruses,

From: Leah Snerling {mailto:[email protected]]

Sent: Tuesday, 23 December 2014 3:12 PM

To: Andrew van Tonder

Cc: Eddie Venturini

Subject: RE: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

Good afternoon Andrew,

Thank you for providing the additional information we requested on the Cooroy mixed-use development. | have
reviewed the documentation and am satisfied that stormwater management, setbacks to the minor watercourse
and general treatment of the riparian corridor are in accordance with the Seqwater Development Guidelines. There
are a few points that were made informally (in emails) or touched upon in reports that I’d like to confirm regarding
both the riparian buffer and the pump station, and also some uncertainties around the proposed pump station in
the absence of a report addressing this particular element of the proposal. To address these areas, | can provide the
following advice / recommendations:

¢ Seqwater supports the 20m average setback and riparian buffer width for all uses to the minor stream on
the subject site. The 10m additional buffer strip affords important additional protection to the watercourse
and riparian vegetation, given the high impact nature of some uses proposed. The response letter prepared
by Saunders Havill Group (Keira Grundy, dated 20 November 2014) and the Ecological Assessment Report
(EAR -prepared by Saunders Havill Group, dated 24 June 2014) both make brief reference to weeding and
revegetation of the 20m riparian buffer area, however no Rehabilitation and Weeding Management Plan
has been provided with the application material. The Landscape Masterplan (Prepared by Saunders Havill
Group, dated 10 February 2014) makes reference only to weeding in the riparian buffer area and planting in
the additional 10m buffer strip.

Given the degraded state of the existing riparian buffer (as evidenced in the aforementioned environmental
advices) and the high impact nature of some of the proposed uses within a drinking water supply
catchment, Seqwater considers it appropriate for a staged rehabilitation plan, including select and
controlled weeding and revegetation to be developed for the existing riparian buffer. This should occur in
addition to the proposed planting in the 10m buffer strip. It is recommended that a Rehabilitation and Weed
Management Plan is prepared by a qualified professional at the appropriate stage of development and
approved / endorsed by Council prior to development commencing on the site. Seqwater requests a copy of
any such plan for review when available.

e The Water and Sewerage Network Analysis (prepared by GHD, dated November 2014) mentions that it does
not cover internal site servicing. No report specifically addressing the private pump station required on site
has been prepared, therefore no information exists as to the capacity, maintenance or emergency response
measures associated with this infrastructure. Seqwater recommends the preparation of an Inspection and
Maintenance Schedule and an Emergency Response and Contingency Plan for the pump station.. This
Log in to download the original file

seq water 5.02.pdf · 830 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.