Skip to the record
Beware of cheap imitations.

Original source · versioned page text

seq water 5.02

Attached to the e-mail MCU14/0056 Additional information from applicant.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

should be endorsed / approved by the relevant authorities (Council, DEHP). Seqwater requests a copy of any
such plan for review when available.

e Should the location of the proposed on-site sewerage pump station change, Seqwater requires that this
facility maintains at least a 50m setback from the surveyed high bank of the watercourse on the site.

« Seqwater strongly supports provision of at least 25% and up to 50% more emergency storage capacity at
the pump station, than that required by the SEQ Sewer and Water Code.

e Seqwater requests to be included ona notification register in the event of any overflow / spill / other
sewage discharge event

Many thanks for your consultation in relation to the proposed development. If there is any further advice or
clarification you require, please contact me directly.

Kind regards,

Leah Snerling Senior Land Use Planner

@seqwater GOH

117 Brisbane Street, Ipswich, QLD, 4305 | PO Box 16146, City East, QLD 4002
p (07) 3035 5552 | m 0427 910 259 | f (07) 3229 7926
e [email protected] | w www.seqwater.com.au

 

  

 

 

Please consider the environment before printing this email. It can take up to 13 litres of water to make one sheet of A4 paper.

Our rangers can't be everywhere to help yo :
| ‘ ‘ cet apie
Play it safe this summer am ert]

QUEENSLAND:

   

seqwater.com.au/play

 

From: Andrew van Tonder [mailto:[email protected]
Sent: Wednesday, 17 December 2014 10:34 AM
To: 'Eddie Venturini’; Leah Snerling

Cc: 'Gavin Nye’; [email protected]
Subject: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

Hi Leah

The proposed pump station is shown on drawing P003 and is about 50m from the stream/ waterway.

Also please find attached the sewer and water analysis report that has more information on the proposed pump
station. The pump station would have a warning system in the event of an emergency and we are proposing to have
emergency storage that is 25-50% larger than is required by the SEQ Sewer and Water Code. Also in the event that
both pumps stop working, the owner could stop all uses on site.

Please do not hesitate to contact me should you require any further information.

Kind Regards,

Andrew van Tonder
Log in to download the original file

seq water 5.02.pdf · 830 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.