GENERAL NOTES LIGHT BOLLARDS
SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved.
A. ARCHITECTURAL WORKS INFORMATION GENERALLY: Bollard lights to be installed under the electrical contract. If they are installed prior to landscape
Refer to Architect's drawings for all information contained within these documents related to and nominated as INORGANIC MULCHING - AS INDICATED works, ensure they are protected and maintained during works or rectified with like for like if damaged during
Architectural Works. This includes all hardscape items such as paving, outdoor structures / shelters, walls and works.
fencing. Architectural Works information contained within these documents are indicative only and not for GENERALLY: Install inorganic mulch to a minimum of 75mm entirely over planting areas as indicated on the
construction or certification purposes. drawings. Weed mat to be installed in all areas of inorganic mulch. Refer engineer’s drawings for specification and locations as required.
B. CIVIL WORKS INFORMATION MATERIAL: Inorganic mulch to be Tenterfield Pearl 20-40mm subject to sample. FENCING ANDREW GOLD LANDSCAPE ARCHITECTURE
Refer to Civil Engineer's drawings for all information contained within these documents related to and
SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved. GENERALLY: Install fencing, screens, gates and associated locks and fixings in the locations as shown on the PO BOX 5220
nominated as Civil Works. Civil Works information contained within these documents are indicative only and not MT GRAVATT EAST
for construction or certification purposes. drawings. The construction, finishing, fixings, wind loading, footings and final design will be undertaken by an QLD 4122
PODIUM PLANTERS engineer/ builder. The images and landscape drawings show the extent and design intent and the final finish
C. STRUCTURAL WORKS INFORMATION should be coherent with similar elements on site or as discussed with the landscape architect. T 07 3420 0006
M 0405 389 243
Refer to Structural Engineer's drawings for all information contained within these documents related to and TOPSOIL: E [email protected]
nominated as Structural Works. This includes retaining walls. Structural Works information contained within Supply and install imported topsoil suitable for podium planters (UltraGrow Platinum Podium and Container FENCE TYPE A1: 1500mm or 1800mm high fence (in outdoor shower locations) with 50 x 50mm timber
these documents are indicative only and not for construction or certification purposes. Mix.) Proposed topsoil must comply with Australian Standards AS4419-2003 and Australian Standards battens (or composite wood as approved) spaced at 50mm or 100mm spacings as indicated on the drawings.
AS3743-2003 ‘Potting Mixes’ Colour finish to match house colour that it is located next to. Confirm with Architect on site.
D. ELECTRICAL WORKS INFORMATION Provide certification of soil types delivered to site, as per AS3743-2003.
Refer to Electrical Engineer's drawings for all information contained within these documents related to and FENCE TYPE A2: 1500mm fence with 50 x 50mm battens at 50mm spacings fixed atop retaining wall. Colour
TOPSOIL AERATION AND DECOMPOSITION: finish to match house colour that it is located next to. Confirm with Architect on site. ORGANIC MULCH - 1 INCH HOOP BARK INORGANIC MULCH - 'TENTERFIELD PEARL' DECORATIVE BOULDERS
nominated as Electrical Works. Electrical Works information contained within these documents are indicative
and not for construction or certification purposes. Contractor must allow to maintain finished levels allowing for potential slumping and subsidence. Tamping
down and light wetting up of soil during placement on podium to ensure air pockets and voids are managed out. FENCE TYPE B Pool Fence: By others, refer Architects Drawings
E. HYDRAULIC WORKS INFORMATION
Refer to Hydraulic Engineer's drawings for all information contained within these documents related to and FERTILIZER: FENCE TYPE C Proposed Fire Protection Fence: By others, refer Architects Drawings
nominated as Hydraulic Works. Hydraulic Works information contained within these documents are indicative Ensure soil nutrient and PH levels are suitable for specific plant species (ie. native or exotic species)
only and not for construction or certification purposes. Apply appropriate slow release fertilizer (ie. native / exotic species) to each plant as per manufacturer's FENCE TYPE D1 Boundary: 1800mm high fence with 100 x 100mm posts and 100 x 10mm timber capping and
recommended rates. plinth. 100 x 20mm battens to be angled to obscure views through.
A slow or controlled release fertiliser organic or inorganic to be incorporated generally into the imported (or
LANDSCAPE SPECIFICATION NOTES FENCE TYPE D2 Boundary Fence Acoustic: By others, refer Architects Drawings
excavated / site topsoil). We recommend the following:
LEVELS-GENERAL NOTES
Inorganic Slow or Controlled Release fertilisers: FENCE TYPE E Bin Enclosure: 1500 - 1800mm high fence/ gate with 50 x 50mm battens at 50mm spacings.
Finish organic mulch surfaces 25 - 40mm below adjacent paving surfaces and / or edging. Finish lawn surfaces
• Osmocote Height of fence/ gate to be 1800mm for front access and 1500mm high for bin enclosures.
flush with adjacent paving surfaces and / or edging. Ensure adequate falls in finished surface levels away from
• Nutricote
buildings to drainage collection points (eg, field inlets, etc).
• Macrocote ENTRY FEATURE
• E-Scape PRO by eCo-Enviroment
SUBSOIL DRAINAGE - GENERAL NOTES
GENERALLY: Construct a major and two minor signage/ features in the locations as shown on the drawings.
Ensure adequate subsoil drainage elsewhere by installing suitable agricultural drainage systems where
Organic slow release: See indicative images to show materials, design intent and general proportions.
necessary, and especially in areas subjected to site excavation works including retaining walls.
• Dynamic Lifter
• Organic Link by Plant of Health All required fixings, footings, and construction methodology to engineer's / builder's confirmation and
PLANTS Landscape Architect's approval. Final locations, extent and positioning to Landscape Architect's approval and
PLANTING: may require the construction of a plinth to ensure visibility and appropriate finished levels.
• NATSPEC shall apply to trees where Council requires this certification. To locations as shown on the plan and to the sizes and numbers as shown on the schedule.
• Plants are to be good quality nursery stock from a NIASA Accredited nursery MATERIALS: Stone cladding from Eco Outdoor 'Cracken Back' Ph1300 131413. Project logo, lettering font and
• They shall be fundamentally free of pest and diseases. SANDSTONE REGULAR STEPPERS SANDSTONE RANDOM STEPPERS
ORGANIC MULCHING: sizing to be confirmed by project marketing / branding consultant.
• After installation they shall be thoroughly watered. Where specified, proposed mulch must comply with Australian Standards AS4454-2003. 'Composts, soil
conditioners and mulches'. Spread 1" Hoop Bark to a minimum depth of 75mm entirely over planting bed areas.
TURF
DRAINAGE CELLS: STRUCTURE AND BENCH SEATING
SUBGRADE PREPARATION: Use drainage cells to podium planters
Turfed areas shall be prepared initially by removing all deleterious material GENERALLY: Design and construct shelter structure with incporated seat in the location as shown on the
Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil unless Horizontal Application: drawings. The images and landscape drawings show the extent and design intent and the final finish should be
otherwise directed (ie: no cultivation under trees to be retained) Install VersiCell 30mm (https://elmich.com.au/products/versicell-subsoil-drainage/) or similar drainage cell, coherent with similar elements on site or as discussed with the landscape architect.
installed to manufacturer’s recommendations.
SOIL: Ensure all corners and sharp edges are removed and tapped to avoid damaging the waterproof membrane. The construction methodology, timber sizes, finishing, fixings, wind loading, footings and final design will be
Spread turf underlay topsoil to a minimum depth of 100mm unless otherwise directed. Proposed topsoil must Apply final layer of geofabric/ filter fabric (refer below) over entire drain cell area. Lap material minimum 400mm undertaken by an engineer/ builder to the landscape architects approval.
comply with Australian Standards AS4419-2003 and described as 'Soil blend'. at junctions or joins. Turn fabric up walls and service risers minimum 300mm. Ensure neat holes cut in around
services with minimum 15mm clearance.
TURF: TIMBER GARDEN EDGE
To be fundamentally free from weeds and disease or other deleterious substances. Vertical Application (to planter walls):
• Turf to be Sir Grange (Zeon Zoysia) for all areas within the project designated as 'turf' Install to manufacturer's specifications to all podium planter garden bed walls over 400mm in height. Lapping GENERALLY: Install to the locations as indicated on the drawings.
joins and junctions by minimum 100mm.
Supplier: Refer Lawn Solutions website for local growers https://lawnsolutionsaustralia.com.au/turf-suppliers/ or MATERIAL: Sawn hardwood of Durability Class 1 as defined in Appendix D of AS 1604 or CCA treated
call 1300 883 711. GEOFABRIC: softwood.
Install Filterwrap (https://www.geofabrics.co/products/filterwrap™) as per Geosystems Australia details and SIZE: 3000 x 100 x 15mm nominal edgings, 50mm square pegs, 350mm long.
INSTALLATION: specifications. INSTALLATION: Set edgings flush with adjoining surfaces to define planting, grass areas, pathway edges, etc.
Turf shall be close turfed with staggered cross-joints and laid in straight lines, running perpendicular to the Fix to pegs with galvanized nails, two per fixing. Drive pegs into the ground at 1200-1750mm centres on the turf
direction of slope (and / or parallel to contours). VOID FILLER: side of the edging and on both sides of joints between boards with peg tops 15mm below top of edging. CONCRETE PAVING TYPE 1 DRIVEWAY CONCRETE PAVING TYPE 3 FOOTPATH
Proposed topdressing soil to comply with Australian Standards AS4419-2003 and as described as Install polystyrene blocks cut to size to podium planters as shown on details. Contact Polystyrene Products (or CURVING: Where the timber edge is to be curved, space the pegs to hold it to a uniform curve.
'Topdressing'. similar) for space fillers. Ensure geofabric is installed over, to separate soil media from the polystyrene product.
All joints shall be filled with an approved topdress light soil or sand and the turf shall be lightly rolled. (https://www.polystyreneproducts.com.au) BIO-RETENTION BASIN
Finished levels shall be 3mm below surrounding surface levels to allow for future top dressing. Allowance
should be made for shrinkage and settling. IRRIGATION: Refer to Engineering drawings for bio-retention details. Prior to planting, ensure installation of erosion control
Turf shall be adequately watered once installed, refer Management Plan/s. Ensure irrigation is provided as per specification. matting (ie: Jutmaster Fine by Geofabric Australasia), secured as per manufacturer's recommendations.
Ensure protection from trampling.
SANDSTONE STEPPERS IRRIGATION
FERTILISER:
Fertiliser to be applied to the turf at the rates and period of time from installation as recommended by the GENERALLY: Use natural stone, which is uniform quality in each grade, sound and free from defects liable to Planting plan has been designed to survive without an automatic irrigation system. Water additives and water
supplier. If no starter Fertiliser supplied by the supplier, we recommend: affect its strength. retention elements, along with hardy water-wise plants will ensure an irrigation system is not imperative to the
Dynamic Lifter Turf Starter: long-term maturation and survival of the proposed plants. If approved, install an automatic, fixed position, low
http://www.yates.com.au/products/fertilising/organic-based/dynamic-lifter-turf-starter/ SIZE: Random steppers to average approx. 400mm but varying in size/ shape for visual interest with gap of pressure sprinkler irrigation system to all landscaped areas shown on the drawings internal to the site only, to
#tbCQXOZuFJZ01z1B.97 approx. 150 – 200mm between to allow for planting. Noosa Shire Council approval. The irrigation shall meet the following performance requirements and as per the
Lawn Builder™ Seed & Turf Starter Slow Release Lawn Fertiliser: manufacturers and/or installers specifications:
https://www.scottsaustralia.com.au/scotts-brands/lawn-builder/lawn-builder-slow-release- SIZE: Regular steppers to be 300 x 1500mm min 20mm thickness or equal approved • Summer target application of 32mm
lawn-fertilisers/lawn-builder-seed-turf-starter-slow-release-lawn-fertiliser/ • Fully automatic and metered
SUPPLIER: Sandstone World Ph 0431 285 425 or equal approved. • Recycled water use (from rainwater tanks)
SOIL WETTING AGENT: • Commercial quality fittings and fixtures
We recommend the application of a soil wetting agent wetting agent (ie: non biodegradable detergent not LAYING: Subgrade to be fully compacted before mortar bed is laid. Subgrade shall be compacted 95% of • Mainlines
crystals) to stop hydrophobia if not already in the starter fertiliser supplied with the turf, at the rates medium dry density. Mortar to comply with AS 3700 and match sandstone colour as new. Stone should vary in • Dripline system under mulch
recommended by the manufacturer: size and shape for interest and naturalistic look. • RPZ backflow prevent device
• Scotts Hydraflow Wetta Soil CONCRETE PAVING TYPE 2 ENTRY CONCRETE PAVING TYPE 5 ROADWAY CONCRETE PAVING TYPE 6
• Searle’s Penetraide CONCRETE AND PAVING All design and documentation, materials supplied and work carried out should be in accordance with the current AND TYPE 4 FOOTPATH
• Plant of Health Soils Soaker relevant Australian Standards and best practice.
GENERALLY: Install exposed aggregate and coloured concrete footpaths, driveways and roadways in the
WEEDS, PESTS DISEASE MANAGEMENT locations and to the extents as shown on the drawings. Refer drawings for the locations and extents of the PLANT ESTABLISHMENT / CONTINUING MAINTENANCE
Weeds are required to be removed by physical or chemical (Glyphosate or other herbicides) means. If chemical below types.
means, as per the manufacturer recommendations. Refer to the following reference for guideline on weeds, Allow a 12 WEEK Plant Establishment Period from Practical Completion to the satisfaction of the Landscape
pest and disease management Type 1 Driveway: Boral exposed aggregate to match ‘Black night’ mix or equal approved based on supplied Architect.
REFERENCE: sample. Level of exposure to be determined following sample. • Maintain adequate watering regime
http://thelawnguide.com.au • Remove weed growth from all mass planting beds and turfed areas
Type 2 Entry: Portland grey standard concrete trowel finish. Approval based on supplied sample. Not float • Fertilise (as per the notes above) G 02/09/22 UPDATED ARCHITECTURAL DWGS
PLANTING BEDS edges. Trowel finish to be even across whole pour section. • Weed control (as per the notes above) F 18/02/20 IN RESPONSE TO NC IR
• Prune planting, control pest and disease management (as per the notes above) to maintain healthy growth E 12/07/19 UPDATED ISSUE FOR TENDER
SUBGRADE PREPARATION: Type 3 Footpath: CCS Full depth coloured concrete sand colour or equal approved based on supplied sample. • Replenish mulch material where necessary D 10/07/19 COORDINATION ISSUE
Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil. • Replace dead / dying plant material
Type 4 Footpath: Portland grey standard concrete trowel finish. Approval based on supplied sample. Not float • Reinstate stakes, ties and marker stakes where necessary ISSUE DATE REASON
TOPSOIL: edges. Trowel finish to be even across whole pour section. • Reinstate erosion control matting and other erosion control measures as necessary
Spread topsoil to a minimum depth of 300mm unless otherwise directed. Proposed topsoil must comply with
THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE
Australian Standards AS4419-2003 and described as 'Soil blend'. Type 5 Roadway: CCS Full depth coloured concrete ‘Black 44’ or equal approved based on supplied sample. Continue maintenance works beyond Plant Establishment Period as required. AT THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
Provide certification of soil types delivered to site, as per AS4419-2003. Depth and construction detail of roadway to engineer’s detail. INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
MANAGEMENT PLAN/S:
RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
FERTILIZER: Type 6: Open jointed pavers located within the lots to be 400 x 400 x 40mm paver to match Boral Exposed ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE
A slow or controlled release fertiliser organic or inorganic to be incorporated generally into the imported (or aggregate ‘Coral Coast’ or equal approved based on supplied sample . The turfed areas shall be throughly watered on the day of turf installation and then as follows at the equivalent DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
excavated / site topsoil). We recommend the following: of 5l/m², including natural rainfall, or as required to maintain active healthy growth. INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
DIMENSIONS ARE TO BE VERIFIED ON SITE.
Inorganic Slow or Controlled Release fertilisers: Supplier: Exposed aggregate mixes to be Boral Ph 1300 305 980 and coloured concrete pigment to be CCS FENCE TYPE A1 FENCE TYPE D1 FENCE AND GATE TYPE E FENCE AND GATE TYPE E
• Osmocote (Concrete colour systems) Ph 1800 077 744 Weeks 1-3: Twice a week
• Nutricote Weeks 3-12: Once a week or as necessary
• Macrocote Joints: Construct joints in the patterning as shown on the drawings. Approximate locations of joints shown.
• E-Scape PRO by eCo-Enviroment Adjust accordingly to suit engineer’s requirement of frequency and types. If no irrigation, apply the above rates to the mass planting beds. Watering to use rainwater tanks if possible.
Organic slow release: DECORATIVE BOULDERS SPECIAL NOTE
• Dynamic Lifter
• Organic Link by Plant of Health GENERALLY: Place and secure decorative boulders in the locations as indicated on the drawings. Boulders to Accord particular diligence to the following prime items:
be placed in a naturalistic and artistic arrangement.
WETTING AGENT: TOPSOIL QUALITY and SUBGRADE PREPARATION as specified.
ESSENCE OF PEREGIAN BEACH
A wetting agent and / or soil ameliorant including a wetting agent is required to all mass planting beds:
• Scotts Hydraflow Wetta Soil
MATERIALS: Boulders to range in size and vary between 400 x 400, 600 x 600 and 900 x 900 depending on
the locations and availability. Source boulders to match with sandstone and gravel materials. PLANT QUANTITY: Use only consistently well nurtured nursery stock from an approved supplier. Check with
215 DAVID LOW WAY, PEREGIAN BEACH
• Searle’s Penetraide Plant of Health Soils Soaker Landscape Architect where species substitutions must be made.
• Multipro by eCo-Enviroment GRAVEL TO FOOTPATH
PLANTING: GENERALLY: Install feature gravel to a minimum of 75mm in the locations as indicated on the drawings.
MAINTENANCE: Ensure a continuing maintenance program, including weed/disease, fertilising, watering (but
beware of over-watering) and replacement of ailing plant material.
LANDSCAPE WORK NOTES
As indicated on plan. MATERIAL: Gravel to be Tenterfield Pearl 20-40mm subject to sample.
GUARANTEE
ORGANIC MULCHING - BULK PLANTING AREAS SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved. Failure to adequately address these items, best practice and relevant Australian Standards WILL result in a
sub-standard landscape outcome.
JOB No. SHEET No. ISSUE DRAWN BY CHECKED BY
GENERALLY: Proposed mulch must comply with Australian Standards AS4454-2003. 19.021 1 G CP/NB AG/NC
MATERIAL: Spread 1" Hoop Bark to a minimum depth of 100mm entirely over planting bed areas as indicated
on the drawings. STRUCTURE AND BENCH SEATING SHELTER STRUCTURE
NOT FOR CONSTRUCTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.