    2     INTENT
             LI.1
                  OFI (YCAI(`I
                      VVI.V VI
                               DT (`(IAIQTDI
                                  S %#I % I I%.6
                                                I(`TION
                                                   I
                                                        MANA(GMI
                                                        1     ..
                                                                 MIT D_AAI
                                                                     I /'lI•
                                                                      I,.1
                                                                       V




This Concept Construction Management Plan is intended to provide an indication of how works may be undertaken by the
contractor, likely environmental impacts and intended control measures.

The contractor is to prepare a final construction management plan prior to commencing works and a copy is to be provided to
DERM. The contractor's methodology, plant, equipment, scheduling etc may vary from that indicated here. Any changes to
the intended methodology that may increase the impact of the works is not to be implemented without further discussion with
DERM.

    3.    DESCRIPTION AND PURPOSE OF WORKS

With the exception of those areas already protected by rock works, Noosa River Spit is currently experiencing erosion along
its full length, including the southern end of the Noosa River Spit. While this is reducing amenity along what was once a
popular recreational beach, there is also the potential for continued erosion to breach the Noosa River Spit, which could have
very serious impacts.

A number of options were considered [ICM 2010 report]. The preferred option includes [Figure 3]:
    • Submerged curved "closure" [sand-filled geotextile mega-containers] designed to create an enclosed, stable
         beach and lagoon area
     • Dredging for interim navigation and associated foreshore nourishment
     • Training wall [sand-filled geotextile mega-containers] to provide a control point for the southern channel
     • Wall [sand-filled geotextile mega-containers] to prevent erosion along southern end of the Noosa River Spit
     • Two groynes [2.5m3 sand-filled geotextile containers] to stabilize the upstream beach




Figure 3: Proposed Strategy

Used in these records

About this file

File size
13.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - Report & Plans.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.