A staged approach of construction is being adopted and this construction plan is relevant only for Stage 1 of the works
[Figure 4]. Stage 1 includes:
• Retain existing rock wall [maintain / upgrade as required]
• Submerged channel closure [partial]
• Wall at end of Noosa River Spit
• Groyne I Training Wall
• Dredging for interim navigation (location to be determined)
• Foreshore nourishment
• Removal of dead trees (marine plants) as required
• Widening of access track
The submerged channel closure, wall and groyne are to be constructed using sand-filled geotextile mega-containers.
Submerged Closure
Crest at low Tide
Dredging
Nourtshment
Wall
Creel at surface level
[approx high tide]
Figure 4: Proposed Stage I Works [preliminary design]
4. RELEVANT APPROVALS
The following approvals are being sought:
o Resource Entitlement
o Prescribed tidal works
o Interfering with Marine Plants
o ERA 16 1(b)
o Registration Certificate
o Clearing (Nature Conservation Act)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.