Staged construction is recommended, with the first stage including the works shown in Figure E2 below. Stage 1 costs are
outlined in Table El below
V 0 . S
Submerged Closure
Crest at low Tide
Dredging
Training Wall
Crest at flood height
Wahl
Crest at surface level
[approx high tide)
Figure E2: Proposed Stage 1 Works
Table El: Summary of staqed costs
Qty Rate Amount
ex-GS
Establishment 1 S110,000
Northern section of curved "closure" 80m $250,000
Training wall 80m $305,000
Revetment wall $530,000
Dredging ! nourishment 10.000m3 $12 $120.000
Water quality testing Allowance only S30000
TOTAL $1,345,000
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.