Skip to the record
Accept no imitations.

Council archive · source document

Development Application - Part 2 of 2 - Report & Plans · OPW11/0116

of 79

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (13.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
1.   BACKGROUND

The Noosa River estuary is a highly modified system. In its natural configuration, the entrance is very dynamic and variable.
During calm periods the river meandered substantially and flood events resulted in a straight channel direct to the ocean,
placing the entrance close to the end of Hastings Street [Figure 1].




Figure 1: BPA aerial photos of natural Noosa River configurations - 1940 [calm weather] & 1972 [post-flood]

In 1977, the BPA report "Scheme for the Protection of Hays Island and Restoration of Noosa Beach" stated that the
southern channel had developed to such an extent that it carried almost the entire flow of the river. Severe erosion of Hays
Island was then occurring along the northern revetment. In response to this problem, BPA proposed to relocate the river
mouth to the north and reclaim Noosa Spit. "The function of this scheme is to separate the main body of flow of the Noosa
River from Hays Island which is under threat of erosion and which requires protection.         The scheme will also provide
secondary benefits in the form of restoration and lengthening of Noosa Beach." The works were undertaken in 1978 [Figure
2].




Figure 2: BPA aerial photo of completed works [19831

Since reclamation of Noosa Spit, the behavior of the river has remained highly variable in response to changing conditions.
The river meanders predominantly to the south [but periodically to the north] during calm conditions with a more direct
"middle channel" developing during high flow conditions associated with cyclones and floods [Figure 31.

Used in these records

About this file

File size
13.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - Report & Plans.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.