Council archive · source document
Development Application - Part 2 of 2 - Report & Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
Very large file (13.6 MB): may take a few minutes to open.
Long-Term Strategy Includes:
• Retain erdsdng rock wall Imstak t
w7adel
• Submerged Curved channel 'Closure
enclosing lagoon
• Wall at and of Noose River Spit
• Groyne I Training Wall
• 2 short groynes
• Dredging for interim navigation
• Foreshore nourishment
• Removal of dead trees (marine plants)
as requited
• Monitoring program
• Maintenance of all structures
For details of strategy, refer ICM report
'Option Review - Noose River Spit'
5. A Coastal Management District has not been
declared for this area. The Erosion Prone
Area Is the full width of the Spit.
6. Aerial photo from Google [June 20081.
Channel configurations have altered.
I
I
L MC 'Y4}t.Y tV
International
Coastal
Management
NRS-OO1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.