Development Application - Part 2 of 2 - Report & Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
Very large file (13.6 MB): may take a few minutes to open.
Proposed Stage I Wald:
• Retain existing rock wd Irnelntain I
upgrade)
• Widening of existing footpath for
construction aaau
• Northern section of submerged
channel closure
• Wal aI end of Noose River Split
• Groyne I Training Wall
• Dredging for Interim navigation
• Removal of dead sea (mWkr plorila)
7081700 as required
• Foreshore nourishment
• n ^g
Existing footpath Ito be widened for
construction access) Rydrographic survey by SCRC on 23rd
November 2010.
3. Works to be undertaken in accordance t1Ah
'Noose River Spit Concept Envlmrw*M
Management Plan' prepared by ICM.
4. Drawings to be read In con junction with
Notes on drawing NRS-01 1.
7081600
Groyne / Training Wall to limit
channel migration [see drawing
-005 & -006 for details)
LEGEND
Structure Crest l 1
Structure Too I I
Dredge Area I !I
Nourishment Area
RP Boundary
Intemational
Coastal
Management
W yw? V" C2 4•mal
• MWWO.D42170ab
NOOSA RIVER SPIT
PROPOSED STAGE 1 WORKS
NRS-002
t" ,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.