Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2021-01-18 GC - Item 3 - Attachment 1 - Coastal Hazards Adaptation Plan for Community Consultation

of 130

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Phases 6 – 7: Assessing potential adaptation actions for Noosa
There are numerous adaptation options that may be considered for adapting to coastal hazards in
Noosa’s coastal zone. Each of these has a range of costs and other implications that require
careful consideration before implementing. A key aspect of adaptation planning is avoiding a
course of action that once begun, cannot be altered. In addition, it’s also important to avoid
pursuing actions that simply transfer or make the same problem worse elsewhere.

With these considerations in mind, a hierarchy of potential adaptation responses has been adopted
for this plan, shown in Figure 10.




         Figure 10     Hierarchy of preferred coastal management responses for areas vulnerable to coastal
         hazards



Based on expert advice and feedback received through a series of community surveys and
workshops, a range of criteria were applied to a list of 53 potential adaptation options for assets
and locations where risks are considered high or very high. These criteria are shown in Table 1.


           Criteria         Criteria Description
                            Monetary costs to build/implement an adaptation option (further
           Cost             detailed studies to confirm costs may be required), either by
                            Council or private land owners
                            Whether an adaptation option will have adverse impacts on
           Environmental
                            environmental values e.g. Matters of State Environmental
           Impact
                            Significance




Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030 (community consultation version)             Page 22
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 1 - Coastal Hazards Adaptation Plan for Community Consultation(PDF, 20MB).pdf · 20.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.