Skip to the record
Accept no imitations.

Original source · versioned page text

2021-01-18 GC - Item 3 - Attachment 1 - Coastal Hazards Adaptation Plan for Community Consultation

of 130

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            Criteria         Criteria Description
                             Whether an adaptation option will have adverse impacts on other
            Social Impact    social values or is likely to have community support e.g. access,
                             amenity, property values
            Reversible/      Whether an option is able to be ‘reversed’ or adapted to cater for
            adaptable        future needs
                             Whether an option is technically feasible (i.e. is effective in
                             mitigating the risk and is implementable)
                             Whether an option is able to be readily approved (i.e. is
            Effectiveness
                             consistent with current planning policy or legislative requirements)
                             Whether an option provides a long-term solution to the coastal
                             hazard risk, or is suitable for use as an interim option
                                 Table 2 - Adaptation options assessment criteria

The purpose of this stage of the project was to determine which of these adaptation options are
highly likely to be suitable for Noosa or which might work but for one reason or another require
further work to determine their feasibility, as well as those that are very likely to be ineffective or
unfeasible for inclusion in this plan. Reference Box #3 explains how each of the options were
assessed and categorised.


                                              Reference Box #3

                                       Assessing adaptation options

 Using the criteria set out in Table 2 to score each option, a “traffic light” system was then used to group
 the options for deliberation as follows:

     •   Proceed: an option is considered suitable with no other adverse impacts, and requires no further
         development (i.e. studies, design etc). These could also be defined as “No Regrets” options
     •   Investigate Further: an option may be suitable, but should be subject to further detailed
         assessment at specific locations i.e. cost-benefit analysis
     •   Unfeasible: an option is not considered suitable at a location and may not be considered for
         further detailed analysis.



Having gathered information on potential adaptation options, an important next step in the project
was to undertake more detailed and rigorous socio-economic analyses (known as a cost-benefit
analysis) of the short-listed options using a range of social, environmental and economic criteria,
data and other information. This component was critical to informing the selection of the adaptation
actions presented in this plan.

For the most part, options included for this final stage of analysis were those that scored highly
within the ‘Investigate Further’ category. In addition, based on feedback from Council staff and the
community, it was determined that a number of options rated as ‘Unfeasible’ should also be
included to provide greater certainty and confidence that these actions should not form part of a
coastal hazards adaptation plan for Noosa.




Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030 (community consultation version)          Page 23
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 1 - Coastal Hazards Adaptation Plan for Community Consultation(PDF, 20MB).pdf · 20.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.