          Our Ref: C 1384
          Council Ref: 23537DA & 2006/2456



          19 November 2010
                                                                                   ;7   -24Q 1Vr,



                                                                           SCRC CORRESPONDENCE
                                                                                                                      CM
                                                                                                                       WOLTER
                                                                                                                       consulting group



                                                                                                                    Suite 1, Ground Floor



                                                                              3111111111114
                                                                                                                    30 Florence Street
                                                                                                                    NEWSTEAD OLD 4006
          The Chief Executive Officer
                                                                                                                    PO Box 436
                                                                                                                    NEW FARM OLD 4005
          Sunshine Coast Regional Council
                                                                                                                   Tel: (07) 3666 5200
          Locked Bag 72
                                                                                                                    Fax: (07) 3666 5202
          SUNSHINE COAST MC Q 4565
                                                                                                                    email
                                                                                                                    brisbane O wolterconsufing.com. au

                                                                                                                    website
          Attention:               Ms Kerri Coyle                                                                   www.wolterconsulting.com.au



                                                                                                                    OTHER OFFICES
           Dear Kerri                                                                                               TOWNSVILLE
                                                                                                                    SUNSHINE COAST



           Re:       Requested Changes to Existing Approvals
                     Beach Road, Noosa North Shore
                     Council Reference: 23537DA & 2006/2456


           I refer to the Requests for Permissible Changes lodged with Council on 19 May 2010,
                                                                                                                    lyu', ' '
           on behalf of Ferrier Hodgson Pty Ltd, in relation to the approvals associated with the                           (r4'r

           Noosa North Shore Eco-Tourism Portal development.


          We note that on 15 September 2010 Council issued a number of the requested
          changes however, at that time certain requested changes (which were held in
           abeyance) were not included in the modified approvals. The purpose of this letter is
          therefore to confirm the status of these matters and seek Council's determination and
          djipit `: 3, (. the tt'Ir!ciril,lin3 iCyV*cSicG Lliullyar ,.




           Preliminary Approval for NNS Eco-Tourism Portal Development Code


          Although Council issued a Change to the Preliminary Approval on 15 September
          2010, the requested change to Overall Outcome 17 of the Development Code was
          not included in the issued documents.
                                                                                                    !Fox jS O7

          The requested change sought to reflect appropriate project ownership and operations
          moving forward. In addition, it concerned the potential dedication of land and eco-
          centre to Council.


       DIRECTORS: MICHAEL WOLTER BAppScSurv MSSI CS DONALD MACKIE BAPpS^Surv Mssl es TONY GERAGHTY BSu,v MIS AuSI MSSI CS
            ANDREW CRAWFORD BRTP (Hops) Grad Dip Mngl MPIA CPP NATALIE RAYMENT BAppScIBIIEnvI GradDipurb&Re5PIan MBA MPIA CPP
Full text of the other 2 pages

Page 2

This part of the requested changes was put in abeyance by Council, such that it could
be considered independently of other requested changes. As a result of more recent
discussion with Council, the proposed dedication of land and eco-centre has been
withdrawn.


With the above now resolved, it is considered, that the balance of the requested
change (concerning management of visitor accommodation) can and should be
approved. We have therefore updated the requested change as follows:


Amend 0017 (by amending the introductory works, and sub-section 'a') to read as
follows:


"0017 The Noosa North Shore Eco-Tourism Portal is administered under one or
more management regimes, to be consistent with reconfiguration of the site, and
based on precincts boundaries set out in Figure 4.1, with:
(a) Visitor accommodation and services principally administered from management
     facilities provided in either or both the East Development Zone and the West
     Development Zone.
(b) ..... (no change)
(c) ..... (no change)


The above proposed change enables the holiday homes and retreats in the east and
west zones, respectively, to be administered by either a single entity or two separate
entities. The facts and circumstances in support of the requested change include:
n   The various project components are unable to be operated as a fully integrated
    resort, given the partially completed status of the project, and the likelihood that
    separate entities will own and operate individual components.
n   In particular, the operator of the Beach Road Holiday Homes (east development
    precinct) may not necessarily be the operator of the Beach Road Retreats (west
    development zone).
n   Therefore it is not practical to require their interaction and reliance upon each
    other except where necessary, such as the provision of the sewerage treatment
    services (at a cost) as governed by the relevant easements.


The centralised management requirement remains a significant impediment to the
receiver's objective of selling the land to interested parties for the purposes of
completing and operating the various project components.



WOLTER CONSULTING GROUP                                                                    Page 2

Page 3

Development Permit for a Material Change of Use for `Eco-centre'


As outlined in our original request submitted to Council, we requested that Condition
10.4 of the Eco-centre approval be removed. As far as we can tell, this requested
change has not been determined by Council, as it was similarly held in abeyance.


Whilst the future status of the eco-centre has been more recently resolved, the
requested change remains a valid consideration and indeed, a critical matter for the
receivers in seeking to advance the project to its conclusion.


The facts and circumstances in support of the requested change include:
•   The various project components are unable to be operated as a fully integrated
    resort, given the partially completed status of the project, and the likelihood that
    separate entities will own and operate individual components.
n   In particular, the operator of the Noosa North Shore Resort (which includes the
    eco-centre) may not necessarily be the operator of the visitor accommodation on
    the south site (Beach Road Holiday Homes and Beach Road Retreats).
•   Therefore it is not practical to require their interaction and reliance upon each
    other except where necessary, such as the provision of the sewerage treatment
    services (at a cost) as governed by the relevant easements.


Conclusion


Thank you for your consideration of the above.         We would greatly appreciate if
Council could attend to these matters as soon as possible. As Council is aware, the
receivers have commenced a marketing campaign and the final resolution of these
matters will remove any perceived uncertainty for incoming purchasers, developers
and operators. Should you have any queries, please do not hesitate to contact me
on (07) 3666 5200.


Yours sincerely,
Wolter Cultic Group




Director / Manager Planning Services



WOLTER CONSULTING GROUP                                                                    Page 3

Used in these records

About this file

File size
455 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23537 DA & 06_2456 Request changes to existing approvals Beach Road Noosa North Shore.pdf · 455 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.