Original source · versioned page text
Information Response MCUI.17.0551
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
ITEM 2 – BUFFERING TO RESIDENCES No. 19 Trading Post Rd is located in a Rural Zone and essentially acts as a buffer to the residences to the east. Information Required: 2. Provide an amended plan that includes a substantial vegetated buffer for the length of the eastern boundary to provide amenity to the residents, while accommodating waste collection (refer to Item 10 of this information request). RESPONSE In response to Item 2 of the information request, amended Proposal Plans and Statement of Landscape Intent have been prepared. A buffer of 1.5 metres has been provided from the edge of road to the eastern boundary. The Statement of Landscape Intent identifies this area to be densely planted to provide screening to adjoining properties to the east of the subject site. It is considered that this dense screening is sufficient in satisfying Council’s request for a vegetative buffer along the eastern boundary of the site. ITEM 3 – AMALGAMATION OF LOTS The proposal results in development for retirement purposes over Lot 19 which is currently not part of the Palmlakes development. Information Required: 3. Provide information as to how this has been considered and indicate timing and any other factors relating to amalgamating Lots 101 & 102. RESPONSE In response to item 3, the amalgamation of lots will occur after a development permit for the expansion has been approved. Council is invited to the condition the approval accordingly. ITEMS 4, 5, 6 & 7 – STORMWATER MANAGEMENT PLAN Previous applications have demonstrated that approximately 75m2 of filter media needed to be allocated for bio-retention systems to achieve water quality reduction targets as required by the Water Sensitive Design Code of the Noosa Plan and State Planning Policy for the overall development. This filter media areas was based of impervious areas detailed in Appendix F of the provided stormwater management plan. Information Required: 4. Demonstrate that the road, ground and roof areas proposed in the application is consistent with the impervious and pervious areas detailed in Appendix F of the Stormwater Management Plan to achieve pollutant reduction targets consistent with the State Planning Policy. The provided stormwater management plan was provided for previous stages of the Palm Lakes development and does not address any design, construction or maintenance aspects of the current proposed stage. Page 2 of 5 Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215 P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com.au Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.