Information Response MCUI.17.0551
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
Information Required
5. Provide an addendum or duplicate the Stormwater Management Plan to encompass the design,
construction and operation aspects of the area outlined within the Stormwater Management Plan as
D3 so that it can be appropriately referenced. The addendum/duplicate must demonstrate how Specific
Outcome O10 of the Water Sensitive Design Code of the Noosa Plan is met.
The provided stormwater management plan only addresses the area needed for water quality management
and does not address any stormwater detention requirements necessary for flood or frequent flow
management.
Information Required
6. Demonstrate that Specific outcomes O1 of the Water Sensitive Design Code of the Noosa Plan, as well
as Appendix 2, Table B of the State Planning Policy, in terms of changes to flow are met.
The provided plan of development does not allocate any area to demonstrate that the required water quality
treatment devices can be appropriately integrated into the development.
Information Required
7. Provide a preliminary stormwater management plan to demonstrate that there is adequate space for
the required water quality treatment systems as well as depth of fall for pipework and batters for any
bio retention basins. Demonstrate that the preliminary Stormwater Management Plan is consistent
with Specific Outcome O8 of the Water Sensitive Design Code of the Noosa Plan.
RESPONSE
In response to items 4, 5, 6 & 7 of the information request, Biome Consulting was engaged to identify the
required changes to the allocated 75m2 bio basin originally designed for the property as part of the previous
Stormwater Management Plan prepared by Calibre.
The updated information provided by Biome Consulting addresses each item within their response and has
provided updated Stormwater Management Design Drawings in relation to the subject bio retention basin.
Please refer to Appendix B for the full response to items 4, 5, 6 & 7 of the information request prepared by
Biome Consulting.
Further to the outcomes of Biome Consulting’s changes, amendments to Engineering Plans and Landscape
Plans were also required. Please refer to Appendix C for amended Engineering Plans prepared by Pinnacle
Engineering and Appendix D for the amended Statement of Landscape Intent prepared by BVLD Consulting.
ITEM 8 – SITE ACCESS
It is unclear what will be the status of the second additional access to the site at the Cul-de-sac end of Trading
Post Road.
Information Required
8. Please advise if it is intended for the second access to be removed given that the main access to the
Palm Lake Development is located nearby in Trading Post Court. It is recommended that only one
access to the site be kept at this cul-de-sac.
Page 3 of 5
Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com.au
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.