Original source · versioned page text
Information Response MCUI.17.0551
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
The amended Solid Waste Management Plan notes that it is not possible for waste service vehicles to navigate
through the proposed four (4) metre width one way roads. The report outlines that the additional sites will be
serviced from common servicing points located adjacent to the caravan storage area. Common servicing areas
have been identified in four (4) locations adjoining the caravan storage area.
It is considered that the above proposal ensures Council’s refuse trucks can collect waste from the common
servicing points for the additional 10 homes, therefore satisfying this item of the information request.
ITEM 11 – BUSHFIRE
Information Required:
11. Provide a bushfire management plan that addresses bush fire risk for the development site and
surrounds.
RESPONSE
In response to the above item Brisbane Bushfire was engaged to prepare a Bushfire Hazard Assessment for
the proposed development.
The assessment found sites 229 and 230 are required to have a maximum bushfire attack level of BAL-12.5.
The remaining sites 221 to 228 are considered low level risk as they are located out of the 100m buffer area
for bushfire where no special construction requirements are required.
Please refer to Appendix G for the Bushfire Hazard Assessment prepared by Brisbane Bushfire.
CONCLUSION
Pursuant to sections 13.2 and 13.3 of the Development Assessment Rules under the Planning Act 2016
Palmlake Works on behalf of Walter Elliott Holdings has provided a full response to the Information Request.
It is requested that Council proceed with the assessment and decision of this development application.
Please do not hesitate to contact the undersigned on 5552 1313 or via email [email protected]
should you have queries regarding this information response.
Yours sincerely
Palm Lake Works
Matilda Kaveney
Town Planning and Construction Assistant
Page 5 of 5
Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com.au
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.