Original source · versioned page text
Information Response MCUI.17.0551
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
RESPONSE In response to Item 8 of the information request it is confirmed that the existing driveway and access handle to 20 Trading Post Road will be removed as part of this development. It is proposed that the additional sites are accessed via the existing entrances to the Palm Lake Resort Cooroy development located at 19 Trading Post Road. Council is invited to condition the removal of the subject existing driveway. ITEM 9 –ROAD DIMENSIONS More detail with regard to roads dimensions are required Information Required: 9. Provide greater detail with regard to widths of the proposed new roads and measurements for the new lots. Consideration must be given to have Boundary Truncation for the corner lots in order of providing better sight lines and safer traffic environment. RESPONSE In response to Item 9 Palm Lake reiterates the width of the proposed internal roads are 4 metres wide. This width will result in these roads being a single lane one way circuit. Appropriate directional signage will be installed to guide traffic direction. Council is invited to condition the approval to install the required signage. Boundary truncations to sites have been provided where necessary and indicated on the amended proposal plans. These amendments have occurred to sites 221, 223, 226 and 227. In addition to this the amended plans identifies on Stage 6 Plan (Sheet 3 of 3) features the siting constraints across the entire development. These siting constraints identify no site will feature a width of less than 13 metres or a depth less than 18 metres. The house plans provided also identify the width and depth of products, where all of these homes require the equivalent to the minimum requirements or more. Please refer to Appendix E for the Amended Proposal Plans prepared by Palmlake Works. ITEM 10 – WASTE MANAGEMENT Waste Management Information Required: 10. Provide updated waste management plan for Palm Lake site that includes the added site of the proposed 10 Units. The waste management plan must demonstrate that all internal roads are adequate for the manoeuvring of Council’s Refuse trucks to collect garbage from the individual units or from allocated collection points within the site. The plan must show the paths of travel of the Refuse Truck within the site and the entry and exit points into the Council’s road network. RESPONSE In response to the above item Burchills Engineering Solutions has amended the Solid Waste Management Plan to include the additional 10 home sites (Appendix F). Page 4 of 5 Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215 P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com.au Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.