Attachment 7D - Impact Management Plan - EVNT Fauna species - Noosa Landfill Expansion
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Native Foresters
TABLE 3: MANAGEMENT ACTIONS – POST CONSTRUCTION
1. To ensure habitat restoration works are appropriate following disturbance of EVNT species habitat.
Objective
2. To determine whether there were any impacts to EVNT species populations and their habitat following works.
Responsible
Noosa Council
Person:
Compliance DES Licensing Officer
Officer:
TASKS RESPONSIBILTY TIMING
Habitat Revegetation Site Foreman/ Following
restoration Extent of revegetation works to be determined in consultation with NC. Revegetation completion of works
Physical habitat restoration: contractor
Remove all other materials, fencing and waste from the site following completion of works.
Monitoring Undertake species and habitat monitoring:
Undertake post-habitat disturbance event monitoring (2 events) as per described Project In suitable climatic
methodology in Section 6.1 to assess presence of EVNT species following completion Coordinator / conditions at one
of works. One (1) event is defined as one (1) diurnal hand search, one (1) dip-net Ecologist (1) month following
search, one (1) visual spotlight search and one (1) aural playback survey under optimal completion of works
conditions. and at one (1) year
Comment on whether or not breeding habitat onsite has been impacted by works. following
completion of
Record number and location of EVNT species found during construction using works.
standardised Animal breeding places register (Appendix C)
Reporting A report detailing results of fauna monitoring should be submitted to Council and DES at one Ecologist / At one month and
month following the completion of works with a final report assessing the impacts on EVNT Project at one year after
species populations at one year following the completion of works. Coordinator completion of
Record post-works habitat monitoring results on Species and Habitat Monitoring Form works.
(Appendix E).
For high risk of impacts SMP, a copy of the register (Appendix C) must be submitted to DES
within six (6) months of the interactions with the high risk of impacts SMP species and upon
expiry of the approved SMP via email to [email protected] Corrective Actions: Project Following
Actions Undertake an investigation to any non-compliance and determine appropriate course of Coordinator completion of works
action to remedy impacts.
Weed control / erosion control shall be maintained and corrected as necessary.
IMPACT MANAGEMENT PLAN – Noosa Landfill Expansion …19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.