Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment 7D - Impact Management Plan - EVNT Fauna species - Noosa Landfill Expansion

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                Native Foresters




TABLE 3: MANAGEMENT ACTIONS – POST CONSTRUCTION
                   1.       To ensure habitat restoration works are appropriate following disturbance of EVNT species habitat.
Objective
                   2.       To determine whether there were any impacts to EVNT species populations and their habitat following works.

Responsible
                  Noosa Council
Person:

Compliance        DES Licensing Officer
Officer:

                  TASKS                                                                                                 RESPONSIBILTY TIMING

Habitat           Revegetation                                                                                          Site Foreman/      Following
restoration           Extent of revegetation works to be determined in consultation with NC.                           Revegetation       completion of works
                  Physical habitat restoration:                                                                         contractor
                       Remove all other materials, fencing and waste from the site following completion of works.
Monitoring        Undertake species and habitat monitoring:
                             Undertake post-habitat disturbance event monitoring (2 events) as per described           Project            In suitable climatic
                              methodology in Section 6.1 to assess presence of EVNT species following completion        Coordinator /      conditions at one
                              of works. One (1) event is defined as one (1) diurnal hand search, one (1) dip-net        Ecologist          (1) month following
                              search, one (1) visual spotlight search and one (1) aural playback survey under optimal                      completion of works
                              conditions.                                                                                                  and at one (1) year
                             Comment on whether or not breeding habitat onsite has been impacted by works.                                following
                                                                                                                                           completion of
                             Record number and location of EVNT species found during construction using                                   works.
                              standardised Animal breeding places register (Appendix C)
Reporting           A report detailing results of fauna monitoring should be submitted to Council and DES at one       Ecologist /        At one month and
                     month following the completion of works with a final report assessing the impacts on EVNT          Project            at one year after
                     species populations at one year following the completion of works.                                 Coordinator        completion of
                    Record post-works habitat monitoring results on Species and Habitat Monitoring Form                                   works.
                      (Appendix E).
                    For high risk of impacts SMP, a copy of the register (Appendix C) must be submitted to DES
                      within six (6) months of the interactions with the high risk of impacts SMP species and upon
                      expiry of the approved SMP via email to [email protected]        Corrective Actions:                                                                                   Project            Following
Actions                      Undertake an investigation to any non-compliance and determine appropriate course of      Coordinator        completion of works
                              action to remedy impacts.
                             Weed control / erosion control shall be maintained and corrected as necessary.



       IMPACT MANAGEMENT PLAN – Noosa Landfill Expansion                                                                                …19
Log in to download the original file

Attachment 7D - Impact Management Plan - EVNT Fauna species - Noosa Landfill Expansion.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.