Skip to the record
Beware of cheap imitations.

Original source · versioned page text

51988.2770.02 APPLICATION FOR A MINOR CHANGE TO A TOWN PLANNING CONSENT FOR INDOOR ENTERTAINMENT AND EXTENSION OF AN INDOOR ENTERTAINMENT - 31 BUTLER STREET, TEWANTIN (Referred from Planning & Environment Committee dated 10 September 2024 - Item 5.1) · 2024-09-16 Attachment 1 to the General Committee Minutes - 51988.2770.02 FINAL CONDITIONS

of 3

Page text shows just the words. Original shows the document exactly as it was published.

PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT                           10 SEPTEMBER 2024


28.30.     All landscape works must be established and maintained in accordance with the
     approved design for the life of the development, and in a manner that ensures healthy,
     sustained and vigorous plant growth. All plant material must be allowed to grow to full form
     and be refurbished when its life expectancy is reached.
     Demolition
29.31.     All building materials containing asbestos, including asbestos cement sheeting or
     roofing and lagging, are removed from the building prior to demolition or relocation.
30.32.    Removal of building materials containing asbestos must be undertaken by a licensed
     asbestos removalist.
31.33.     A waste management plan, in accordance with the requirements of Planning Scheme
     Policy PSP9 Waste Management, is to be provided to Council for approval prior to the issue
     of the development permit for building works.
32.34.    Unless specifically conditioned otherwise, all works must comply with the relevant
     acceptable solutions as contained in the Waste Management Code and Water Quality and
     Drainage Code of the Noosa Plan.
33.35.     Adequate area must be provided on-site for the collection and separate storage of
     recyclable, non-recyclable, vegetative and hazardous materials in their specific waste
     streams during removal or demolition works.
34.36.     All waste materials must be removed from the site to avoid causing unhealthy
     conditions, with the site left clean, tidy and free from any debris.
35.37.      Where a development permit has not been issued for the future use of the site, hard
     surfaced areas including concrete slabs must be removed and disturbed areas must be
     revegetated in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively,
     the site must be turfed within 20 business days of completing the removal or demolition work.
36.38.     Erosion and sediment control is to be undertaken in accordance with the requirements
     of the Water Quality and Drainage Code of the Noosa Plan. Measures are to be installed
     and/or maintained until soils are stabilised by vegetation or sealed.
     NOTE: It is an offence under the Environmental Protection Act 1994 to deposit or potentially
     allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
     system (e.g. roadside gutter).




                                                                                     Page 3 of 3
Log in to download the original file

2024-09-16 Attachment 1 to the General Committee Minutes - 51988.2770.02 FINAL CONDITIONS.pdf · 70 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.