Delegated Report - Code - Planning MCU23 0058 [As Published]
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Building Appearance
15. External design features, materials and finishes must be as shown on the Approved Plans,
with no inclusions or alterations made without approval in writing by Council’s Manager
Development Assessment.
16. All deck and balcony areas must not be enclosed with shutters, louvres, glass panelling or
the like thus remaining as open structures.
17. All balustrades to decks and balcony areas must be open or transparent.
18. All air conditioning units or other mechanical equipment must be fully enclosed or screened
such that they are not visible from the street frontages nor adjoining properties.
19. Waste storage areas, loading docks and outdoor service areas are screened by landscaping
or fencing.
Safety & Security
20. The entrance to the site must be clearly signed.
21. Bollard or overhead lighting must be provided along all internal footpaths and internal roads
with intensities to satisfy the requirements of at least a Category 2 in Australian Standard
AS1158: “Public Lighting Code”.
22. All pathways must have grades not exceeding 1 in 20, with paths having hard, slip resistant
surfaces.
23. The entrance to the shared clubhouse must be lit and signed, and clearly identified from the
internal roadway or car parking areas.
External Works
24. Mary River Road must be upgraded in the vicinity of the site access. The works must be
undertaken generally in accordance with drawing number C00 Revision 1 prepared by Noosa
Council dated October 2023. The works must be completed prior to the commencement of
the use.
Site Access and Driveways
25. A sealed access driveway must be provided from the formation in Mary River Road and
extending into the site. The works must be undertaken generally in accordance with drawing
number C00 Revision 1 prepared by Noosa Council dated October 2023. The works must
be completed prior to the commencement of the use.
Stormwater Drainage
26. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property. The works must be carried out in
accordance with the recommendations contained in the preliminary Stormwater
Management Plan reference 23-0102-SMP01-V1A prepared by Colliers dated April 2023.
Easements
27. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
28. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
29. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Page 24 of 28
Document Set ID: 22731989
Version: 4, Version Date: 29/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.