Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2015-08-18 Planning and Organisation Committee Agenda

of 139

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                          AGENDA


   Planning & Organisation
     Committee Meeting


              Tuesday, 18 August 2015


                    commencing at 1.30pm
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Noel Playford, Tony Wellington, Frank Wilkie




    “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2015-08-18 Planning and Organisation Committee Agenda(PDF, 12MB).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 90 (of 139)

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA               18 AUGUST 2015


TABLE OF CONTENTS

ITEM                                                                      PAGE
ATTENDANCE & APOLOGIES                                                        -
PRESENTATIONS                                                                 -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                 3
Building and Plumbing Services                                               3
1      BUILDING STATISTICS JANUARY TO JUNE 2015                               3
DA Planning & Environment                                                    6
2      APPLICATION FOR MATERIAL CHANGE OF USE OF USE FOR A COMMERCIAL
       BUSINESS TYPE 1 OFFICE AND OPERATIONAL WORKS FOR LANDS FOR
       LANDSCAPING SITUATED AT 168 NOOSA PARADE, NOOSAVILLE MCU15/0038
       & OPW15/0072                                                           6
3      APPLICATION FOR SIGNAGE SITUATED AT 1/25 HASTINGS STREET, NOOSA
       HEADS OPW15/0118                                                     20
4      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
       ADDITIONS TO AN EXISTING MULTIPLE DWELLING - TYPE 4 CONVENTIONAL
       AT 41 BELMORE TERRACE SUNSHINE BEACH (MCU15/0025)                    26
5      PROPOSED EXPENDITURE OF KOALA OFFSET CONTRIBUTION - SETTLERS
       COVE                                                                 55
6      SURVEY & REGISTER OF NOOSAVILLE INDUSTRIAL AREA BUSINESSES           59
CORPORATE SERVICES DEPARTMENT REPORTS                                       64
Finance                                                                     64
7      FINANCIAL PERFORMANCE REPORT JULY 2015                               64
EXECUTIVE OFFICE REPORTS                                                    73
8      NOOSA ECONOMIC PROFILE                                               73
9      APPOINTMENT OF 2016 SHOW HOLIDAY                                     83
10     OPERATIONAL PLAN PROGRESS REPORT - 4TH QUARTER 2014-2015             85
11     YEAR IN REVIEW - 2014-2015                                           95
Community Engagement                                                       107
12     COMMUNITY JURY 1 PROCESS                                            107
Governance                                                                 114
13     ANNUAL REVIEW OF COUNCIL DELEGATIONS OF AUTHORITY                   114
CLOSED SESSION                                                          -




                                                                  Page 2 of 139

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      18 AUGUST 2015


PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)

Building and Plumbing Services

1                        BUILDING STATISTICS JANUARY TO JUNE 2015
DOCUMENT INFORM AT ION
ent infor mation




Author                           Building and Plumbing Officer, Paul Riley
                                 Planning & Infrastructure Department

Index                            ECM /Subject    /Building   and   Plumbing   Management   /Building
                                 Relaxations

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Building and Plumbing Officer to the Planning &
Organisation Committee Meeting dated 18 August 2015 providing the quarterly statistics on
decisions in relation to building relaxations and comparisons with the previous quarter
statistics.


REPORT
The purpose of this report is to provide Council with statistics with regard to building
relaxation applications. The statistics provided within this report cover the period from
1 January 2015 to 30 June 2015.

Background

Council’s Building and Plumbing Services area has the responsibility for the management
and assessment of building applications as the referral agency assessor. The decision
process for these applications is undertaken with the intent to meet the requirements within
the Noosa Planning Scheme, and includes assessment against the Detached House Code
and Building Works Code and in some circumstances Queensland Development Code -
MP1.2.

Referral Agency Building Activities (RAB)

Council’s Building and Plumbing Team review RAB applications on behalf of Council. These
activities include the assessment requirements for design and siting which covers boundary
encroachments and site cover provisions for single dwellings and associated buildings on all
residential land.




                                                                                           Page 3 of 139

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          18 AUGUST 2015


Process Review

The Building and Plumbing Branch has implemented a more consistent approach across all
activities and functions. This includes a revised assessment approach using new templates
in reviewing RAB applications.

This new approach has resulted in a greater number of applications being issued with
conditions, as shown in the table below. Conditions are placed on applications to ensure any
development design reflects all the applicable performance provisions of the relevant Code
for the life of the development.

The table below provides details on the applications received and reviewed during the
previous two quarterly periods. Key statistics are highlighted as follows.

Quarterly Referral Agency (RAB) Statistics

                                                    1 July to   1 Oct to       1 Jan to    1 Apr 1 to
Quarterly Referral Agency (RAB) Statistics          30 Sept     31 Dec         31 March    30 June
                                                    2014        2014           2015        2015
Total applications received
                                                           46          44            44             60
Application Stage
                                                            2              0          0                 0
Applications received waiting assessment.
Undecided applications
Applications which are still at information
request stage: Application lodged and                       5              3          3                 5
information request sent by Council to applicant
and waiting reply.
Cancelled Applications
Applications cancelled at the request of the                               3          3                 3
                                                            1
Applicant.
Approved without conditions:
Properly made applications with only minor
issues (e.g.; landscaping, balustrading, dual              28              6          0                 0
road frontage), all of which are in line with the
performance outcomes of Planning Scheme.
Approved with conditions
Applications approved which require advice and
                                                           10          31            38             50
monitoring to ensure particular outcomes of the
Planning Scheme are met.
Refused applications
Application refused: Application does not meet
the requirements of the Planning Scheme, e.g.               1              1          0                 2
detached house code, Queensland
development code and building works code.
Appealed applications
Council’s decision process called up at the
                                                            0              0          0                 0
State Government Building Development
Dispute Resolution Tribunal.

Finance

Nil.




                                                                                            Page 4 of 139

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


Consultation

Internal Consultation

Nil.

External Consultation

Nil.

Departments/Sections Consulted:

       Community Services                   X   Planning & Infrastructure
       Disaster Management & Public Order   X   Building & Plumbing Services
       Waste & Environmental Health             DA Planning
       Community Facilities                     Strategic Land Use Planning
       Cultural Facilities                      Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

       Executive Office                         Corporate Services
       Community Engagement                     Finance
       Customer Service                         ICT
       Executive Support                        Procurement & Fleet
       Governance                               Property & Facilities
       Human Resources                          Revenue Services




                                                                                  Page 5 of 139

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                               18 AUGUST 2015


DA Planning & Environment

2                        APPLICATION FOR MATERIAL CHANGE OF USE OF USE FOR A COMMERCIAL
                         BUSINESS TYPE 1 OFFICE AND OPERATIONAL WORKS FOR LANDS FOR
                         LANDSCAPING SITUATED AT 168 NOOSA PARADE, NOOSAVILLE MCU15/0038
                         & OPW15/0072
DOCUMENT INFORM AT ION




Author                           Development Planner, Jack Lewis
                                 Planning & Infrastructure Department

Index                            ECM / Application / MCU15/0038 & OPW15/0072

Attachments                      1.   Proposal Plan
                                 2.   Existing Layout Plans



         APPLICATION DETAILS

         Applicant                           Dowling & Neylan Real Estate C/- Martoo Consulting
         Proposal                            Development Permit for Material Change of Use for a
                                             Commercial Business Type 1 – Office; and
                                             Development Permit for Operational Works – Landscaping
         Properly Made Date                  13 May 2015
         Information Request Date            27 May 2015
         Information Response                26 June 2015
         Date
         Decision Due Date                   21 September 2015
         Number of Submissions               Nil

         PROPERTY DETAILS

         Property Address                    168 Noosa Parade, Noosaville
         RP Description                      Lot 1 on BUP13572
         Land Area                           Tenancy 1 - 202m2
                                             Total site - 1,085m2
         Existing Use of Land                Medical Centre
         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint
         Locality                            Noosaville
         Zone                                Attached Housing
         Overlays                            Natural Hazards (Flooding & Acid Sulfate Soils)
         Assessment Type                     Impact



                                                                                                 Page 6 of 139

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 18 August 2015 regarding Application No. MCU15/0038 &
OPW15/0072 for a Development Permit for Commercial Business Type 1 - Office &
Operational Works for Landscaping situated at 168 Noosa Parade, Noosaville and
A.   Approve the application in accordance with the following conditions:
     Development Permit for Material Change of Use
          When Conditions must be Complied With
     1.   Unless otherwise stated, all conditions of this Decision Notice must be complied
          with prior to the use commencing, and then compliance maintained at all times
          while the use continues.
          Approved Plans
     2.   Development undertaken in accordance with this approval must generally
          comply with the approved plans of development. The approved plans are listed
          in the following table unless otherwise amended by these conditions.
           Plan No.   Rev.   Plan/Document Name                                           Date
           1 of 10    I      3D Views drawn by Mandy’s Design & Drafting                  June 2015
           7 of 10    I      Proposed Site Plan 2 drawn by Mandy’s Design & Drafting      June 2015
           8 of 10    I      Proposed Ground Floor drawn by Mandy’s Design & Drafting     June 2015
           9 of 10    I      Proposed Upper Floor drawn by Mandy’s Design & Drafting      June 2015
           10 of 10   I      Elevations drawn by Mandy’s Design & Drafting                June 2015

     3.   Development authorised by this approval must be undertaken generally in
          accordance with the Approved Plans listed within this Decision Notice.
          Amenity
     4.   The development must not create detrimental impacts on the amenity of the area
          due to the creation of excessive noise, odour nuisance or other emissions.
          Approved Use
     5.   The approved use must not operate outside the hours of 7:00am to 7:00pm.
          Performance Bond
     6.   Security in the form of a cash bond or trading bank guarantee to the sum of
          $5,000 must be submitted to Council, to secure performance of all conditions of
          the Material Change of Use and associated Operational Works approvals, prior
          to the issue of a Development Permit for Building Works. The cash bond or
          trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance
          of this permit. Council reserves the right to call upon the bond or guaranteed sum
          to effect compliance with conditions.
          Building Appearance
     7.   All mechanical equipment and other service infrastructure located on the site
          must be fully enclosed or screened such that they are not visible from the street
          frontages nor adjoining properties.
     8.   All signage shall comply with the relevant provisions of the Advertising Devices
          Code, with the total signage area not exceeding 10m2.



                                                                                       Page 7 of 139

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 18 AUGUST 2015


     Development Permit for Operational Works (Landscaping)
           Approved Plans
     1.    Development undertaken in accordance with this approval must generally
           comply with the approved plans of development. The approved plans are listed
           in the following table unless otherwise amended by these conditions.
            Plan No.   Rev.   Plan/Document Name                                     Date
            1 of 4     A      Landscape Plan drawn by Outside Noosa                  19/06/2015
            2 of 4     A      Landscape General Notes drawn by Outside Noosa         19/06/2015
            3 of 4     A      Planting Schedule and Images drawn by Outside Noosa    19/06/2015
            4 of 4     A      Landscape Softscape Details drawn by Outside Noosa     19/06/2015

           Landscaping
     2.    Landscaping must be located in a position that will not adversely affect Council
           infrastructure or access to the infrastructure. Landscape works must not
           interfere with vehicle and pedestrian sight distances.
     3.    All landscaping to be planted and maintained in accordance with Planning
           Scheme Policy 3 – Landscaping Plants and Guidelines.
     4.    Grassed areas must be:
           a.    rolled, top dressed and joined smoothly with adjoining surfaces.
           b.    of species sustainable for local and design conditions and do not require
                 irrigation.
           c.    free of disease, pest, weeds, rock and debris.
     5.    New street tree planting must:
           a.    meet NATSPEC Guidelines: Specifying Trees requirements for quality.
           b.    be pruned in accordance with AS 4373, Pruning of Amenity Trees.
           c.    be of the approved plan species.
           d.    be pest and disease free.
     6.    Prior to felling or pruning, all trees are to be checked for wildlife. If wildlife is
           present, the tree must not be felled or pruned until the wildlife has left the tree.
     7.    Vegetation removal or pruning must be undertaken in an environmentally
           sensitive manner to avoid damaging surrounding vegetation, trees and habitat.
           Removed vegetation is to be processed by one of the following methods:
           a.    Processing through a wood-chipper.
           b.    Disposed of in a council approved refuse tip.
           c.    Used for landscaping purposes.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with
     the Planning Scheme:
     1.    The development involves the reuse of an existing commercial building approved
           for a medical centre fronting a major road; and
     2.    The development will not result in any significant additional impacts on the
           residential amenity of the area.




                                                                                     Page 8 of 139

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


REPORT
1.   PROPOSAL
The application seeks approval to convert a tenancy within an existing medical centre at 168
Noosa Parade, Noosaville to a Commercial Business Type 1 – Office. The subject tenancy is
located within a standalone building in the western part of the site and is proposed to be
used as a real estate agency. The eastern building is to remain as a medical centre.

The proposal will involve internal renovations to the 190m2 gross floor area building including
new reception, offices, meeting and training rooms. External renovations include extending
an awning over the pathway along the southern side of the building, as well as updating the
façade and windows to a more contemporary design. No additional gross floor area is
proposed.

The applicant indicates the tenancy to be used by the support staff (administration,
accounts, reception and property manager) as well as a base for sales staff and will operate
Monday to Friday at normal business hours (9am – 5pm) with reduced hours and staff
numbers on Saturdays. The applicant also seeks approval to alter the existing landscaping
on site, however does not propose any additional signage.

The application is before Council, because an office use is inconsistent within the Attached
Housing zone. The locality and proposed site plan is included below as Figures 1 & 2, with
further plans included as Attachment 1.




Figure 1 Locality Plan of 168 Noosa Parade, Noosaville, with zoning overlayed.




                                                                                    Page 9 of 139

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015




Figure 2 Proposed Site Plan

2.   SITE DETAILS
2.1. Background
On the 30 January 1992, Council approved a Medical Centre on the 1,085m2 site (TPC
2404). The development is constructed of rendered masonry block with areas of timber
cladding and glass blocks. The development utilises several curved colourbond roof forms
across the building and two car parking areas are provided on site. The western building has
been used by a number of health care professionals since the original approval and the
eastern building is currently occupied by a dentist.

On the 27 November 2012, Council issued a Show Cause Notice for illegal building works to
the subject tenancy. The works included an additional 20m2 of gross floor area and filled in
existing terraces and parts of the carparking area creating additional medical consultation
rooms. The previous owners subsequently removed the illegal works, complying with the
orders of the Show Cause Notice.

A copy of the existing approved layout of the building is included as Attachment 2.

2.2. Site Description
The site is situated on the eastern side of the Noosa Parade and Weyba Road roundabout
intersection. There is substantial existing vegetation within the south western corner of the
site, which screens much of the existing building.

There are 2 driveway accesses from the Noosa Drive frontage to the site. The most western
access and car park is located between the two buildings and provides car parking for 8
vehicles. The eastern access and car park is located on the eastern portion of the site and
provides car parking for 4 vehicles.




                                                                                 Page 10 of 139

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 18 AUGUST 2015


2.3. Surrounding Land Uses
The site is located in the Noosaville locality and the surrounding area is characterised by a
mix of larger unit developments. The existing uses that immediately surround the subject site
comprise the following:

      To the north:                           ‘Noosa Place’ 21 unit residential complex
      To the south (across the road):         Weyba Creek
      To the west (opposite the site):        ‘Coco Bay’ 23 unit residential complex.
      To the east:                            ‘Noosa Keys’ 15 unit residential complex.

3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   The South East Queensland Regional Plan;
   State Planning Regulatory Provisions; and
    The Noosa Plan.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policies

The change of use does not trigger separate assessment against the State Planning Policy.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint area the SEQ Regional Plan. The proposal is
consistent with the regional policies and regulatory provisions of the SEQ Regional Plan.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Noosaville Locality and is zoned Attached Housing. The
proposed use is identified as inconsistent within the zone and is required to follow an impact
assessable application process.
Locality Provisions
The proposed office raises conflicts with the Noosaville Locality Code as it is identified as an
inconsistent use within the Attached Housing zone. The Outcomes of the Code seek to
ensure new uses avoid impacts on the residential amenity of the area. Given the conflict, the
applicant must demonstrate sufficient grounds to support the development in accordance
with Section 329 of the Sustainable Planning Act 2009. The applicant provides the following
grounds in support of the proposal:
   The proposal involves the reuse of an existing building that was approved for use as a
     medical centre.
   An office is a similar use to that of a medical centre;
   No significant new building works are required to accommodate the use on the site;
   The proposed transfer of one business use to another will not result in further impacts
     on adjoining neighbours; and


                                                                                    Page 11 of 139

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


   The use will be generally limited to day time operations and will not be reliant on
     passing traffic for business. Clients will generally attend the site by appointment and
     the use will not generate high volumes of traffic.
The applicant’s grounds are noted and generally agreed to. The site has been used
continuously as a medical centre since the 1990s and part of the site will continue to be used
for this purpose. The proposed office will operate with similar impacts to that of a medical
centre and will not adversely affect the surrounding residential amenity as the use is
contained in the existing building fronting Noosa Parade.
Land Use & Works Provisions
The following codes which regulate land use and design are most applicable to this
application:
   Noosaville Locality Code;
   Business Uses Code;
   Landscaping Code; and
   Engineering Works Codes
The application has been assessed against each of the above applicable codes and
generally complies with each code. Further discussion is provided below in respect to
carparking and landscaping.
Carparking
Carparking is shared between both buildings on the site, with the existing approval providing
12 carparking spaces for the medical centre, with 6 carparking spaces generally attributed to
each building. The Noosa Plan now requires carparking for both medical centres and offices
at the rate of 1 space per 20m2 for a development of this size.
Given the proposal is for a similar intensity commercial use within an existing building and
does not increase the area of the tenancy, the onsite carparking area is considered
adequate for this land use. There are also a number of on-street carparking spaces in the
Noosa Parade frontage to accommodate any overflow carparking without impacting on the
road network, consistent with the Outcomes of the Driveways and Carparking Code.
Landscaping
The applicant intends to rejuvenate the existing landscaping on site and has prepared a
detailed landscape plan for the site, including:
   Removal of the existing fence along Weyba Road;
   New pedestrian pathway connecting Noosa Parade to Weyba Road through the site;
   Reinforcement plantings along Noosa Parade frontage with a mixture of trees and
     shrub species; and
   Retention of existing native feature trees.
An additional 12 x 45L native tree species are proposed within the street frontages to assist
in lessening the building’s bulk. The proposed landscaping will supplement and enhance the
existing significant trees on site consistent with the Outcomes of the Landscaping Code.
Overlay Provisions
The site is mapped as being affected by the Natural Hazards (Flooding and Acid Sulfate
Soils) Overlay. The proposal is for the re-use of the existing building with no significant
earthworks or the existing floor levels altered. The proposal will not compromise the safety of
users to the site and meets the relevant Outcomes of the Overlay Codes.




                                                                                   Page 12 of 139

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015


4.     CONSULTATION
4.1. IDAS Referral Agencies
Not Applicable.
4.2. Public Notification
The application was publicly notified for 15 business days in accordance with the
Sustainable Planning Act 2009. No submissions were received.
5.     CONCLUSION
The proposed office use within an existing medical centre tenancy raises conflicts with the
consistent uses identified for the Attached Housing residential zone. However, the reuse of
the building will have similar impacts to the existing approved medical centre and does not
raise any significant planning concerns.

No significant new building works are required to accommodate the use and the proposal will
be generally limited to day time operations, resulting in no further impacts on adjoining
neighbours. The application is therefore recommended for approval, with grounds identified
to overcome the planning conflict included in the recommendation.

Departments/Sections Consulted:

     Community Services                    X   Planning & Infrastructure
     Disaster Management & Public Order        Building & Plumbing Services
     Waste & Environmental Health          X   DA Planning
     Community Facilities                  X   Strategic Land Use Planning
     Cultural Facilities                       Asset Design & Investigations
                                               Asset Planning
                                               Civil Operations
                                               Environment

     Executive Office                          Corporate Services
     Community Engagement                      Finance
     Customer Service                          ICT
     Executive Support                         Procurement & Fleet
     Governance                                Property & Facilities
     Human Resources                           Revenue Services




                                                                                 Page 13 of 139

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                               Attachment 1 – Proposal Plans




                                                     Page 14 of 139

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 15 of 139

lO                                                                                                                                                                                                                                oO
 rr                                                                                                                                                                       /                                                        o
  g             w                                                                                                                                                     TE CONSTRUCTION TOSE IN ACCORDANCE WITH THE AUSTRALIAN       ™
               ww                                                                                                                                                     DOMESTIC BUILDING CODE.                                       So
  -             o                Areas                                                                                                                                2 ALL TMBER FRAMING TOBE N ACCORDANCE WTHAS 16842.210
  wn”           @®                                                                                                                                                    3. PINE FRAMING TO BE MINIUMUM STRESS GRADE MGP 11MGP12      Lo
  >            —           Name         ‘Area                                                                                                                        ‘4 HARDWOOD FRAMING TO BE MINIMUM STRESS GRADE F14 § MINIMUM  -
                          Upper foor    aime                                                                                                                          JOINT GROUP 22
  O             co         leurs        sant                                                                                                                          5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP 204,          ®
  2|            8          ‘SF          SS                                                                                        Ws                                  aoe
                            _                                                         7440                                                                            6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF.              oD)
  a             WM        ‘ceining room ie                                                                                                                            SPECIFICATIONS ALL OTHER FIXINGS TO E IN ACCORDANCE WITH
  ©   |         2       aa             is                                          er                                                                                comunalernemne                                                *
  -             as                                                                                                                      <caamermmmes == |              nai          ce   ne       es or
                                         :                                                                                                                            MANUFACTURERS SPECIFICATIONS.
               S                              i                        z=                                                         VS                             | eae
                —                       Git                                                                                       dlevaton                            11.ALL TRADES ARE TO CONFORM WITH THE CURRENT AUSTRALIAN
                                    ——————————                                     : a           (pay                                                          8
                co                              =                                   /                                             (rote—mest}           g             STANDARDS RELATING TO HIS OR HER OWN WORK
                Qa.                                                                  ————                                                           e+"               12. TERMITE PROTECTION TO BE PROVIDED AS PER AS 3660.12000
                S$      8            FEATURE TMEER SAT TENDED PERGOLAS TO          ©             Heer eee                                                  .
  <             oS |                  fenveet aaa”                                 SII   office  Fr        YO             |
                                                                          ?              (camped) Meee
  S             2                 ~                               ps                             He     ote                _
                                                                        pO                        ITT         Goa                 |                        g
ai            <3                            _—            existing                       (BESSY                training room|   i  ;                       5
  2)          Sih:                                                           oie      | 7                                       Ae                   ||.
                        e         | OVER THIS DECKING AREA ONLY                       |                                     1  Ff                    2
  O                            &, 2      L                  ee | N                    |           (ee                              cq                  a
  Z                  g                         hom                                                      ANNI           Za          a                        i
                                           a               Zr Ps i——_—Y                                          4                                         3
                                         3           9       2            ‘pame removed 1               AP                            w z
ir                      ¢                .                   3                        Ae            AAT esters tone        /       i | 33
 wl                            jj        |                   iO                                         aa                 Ht
                        2      s                             i                        |                 tobe removed       H          So
                            &            1K                 H      reception         H            yl         fs]           a       $                       g
LW                                       2    c (= ae                 Bes)           H             =     —_—_—    office           g  2                    s&s
  E                                          q|neimofg          C1                   oe           | ote                             |
                                                        siocale                      4                                             =
  S                                   1   I         *                          (|      a a                     ee |                 CQ 3            =
                                          :  SI           |                          pe           4
                                     i    |    H          .                     =   y     WIFE        TFG          TRIFG  _                             2      3S
  =                         a              ee 2ererer el             eee             4                                       GAL MESH FRED TO TEER
  oO                    =                                                         DECKING                                    VERTICAL GARDEN aS TO        g    g
  Oo                    ~                                                                                                   ASUALLY ENHANCE FACADE TO CARPARK  ~
  z                                      aire 7           ‘dp                |     |      &            140x140 TIMBER POSTS dp      ¥                                                                   ra
  Oo                                                                                                                                é                                                                    So
  2                                     Ge)                     Sa.                                Saas.                            <)                                                                 2
  a                                                                          Ld                 mol]   mest)        maw     fn      3                                                                  s
  >                                         a a                        0            [ee           |                                                                                                     c
  a                                            ESET                                                                            ee                                                                       =
  ©                          pws                                                                   is FT                                                                                                2
cc                                                                                                                                                                                                       Dm
  Oo                                        .
 ne                      concept drawings only                                                                                                                                                         oO
  O                      not for construction                                                                                                                                                           2
  za                                                                                                                                                                                                    oO
  z=                    PROPOSED:                            CLIENT:                     BUILDER:                   MANDY'S DESIGN & DRAFTING              SHEET:   _8 of 10] DATE:       ISSUE NO:     o
  S                      OFFICE LAYOUT                       DOWLING & NEYLAN          | TBC                        PH: 0403 481 474                       SCALE:    4:40   |JUNE 15      ||            =
  a}                    NOTE. THESE DRAWINGS 10 BE READ IN CONJUNCTION NOTE BULDER TO CONFIRM STNG AND DIMENSIONS BEFORE CONSTRUCTION                                                                   a
  a         _

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 16 of 139

wo                                                                                                                                                                                                                 fey)
  o           <2)                                                                                                                                            TALL CONSTRUCTION TO BE'B1 ACCORDANCE WHT! THE AUSTRALIA ©
 ql          3                                                                                      aus                        eo                             DOMESTIC BULDING CODE.                                ~
    |         8                           ii                                     {27 =                    et                  GO                                             a                                       5
                                             oF                                                                               WW of 10,                       2 ALL TIMBER FRAMING TO SE IN ACCORDANCE WITH AS 1684.2 2010
            x                                3%                                                                              elevation C                      4.HARDWOOO FRAMING TO BE MINIMUM STRESS GRADE F14 & MINIMUM o
 =             oO                                                                       ee LLL.                              '                             pl                                                       r
  oO          wm                                                                  r                     71                                                    6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF.       2
 z            S                                                                   |                      Bonn           nnng                                  sm@az0e                                                3
  o   |       =                                                                   |                                         boa                           |     ataacraiete maarene                                 a
                ~                                                               |   ent window bs here  exsing  exising     !      g                !                           -
  ~          —                                                       rs               See                                                           |         2 Sistas reas coon mimes es
               co                                                    |     S         store                    tert | (tiles) | |   a               =           10. ANY ERRORS ARE TO BE ADORESSED TO THE DESIGNER AS NO
              cS                                                     {|    &       ]  se | Office                           |   #13                #          $1 AL TRADES ARE TO CONFORM WT THE CURRENT AUSTRALN
             a.                                                                    La                oe                    |}  eds                 3          Stuns snc Tone snares   haem 00
              S                                          ee                    Yl     fico          \LTTTTTNITT >              ef”                  !
 <            S                                          |                 g          ere       T copier |   hall     Y        -
 2             c-                                                          “   §                —             (coe!   Y                             |
 i          ©O                                           |                     :                           pf           nanan apne                  1
 g           =                                 oe                                    "   820ced            "bal        1           -
 r                                           |                             |    | ee]           eee                   |
                                                                                                       3
 =                                           |                                     ff}
 =
 uu                                    qa                                        Y     2200 «100 2000  0      35       ‘200    5
ro                                                                       tt                                 Hg
 E                                                                                                                             ©
 =                                                                                                                             i
 =                                                                                                                                         EETTEN SCREENING
 Oo                                                   oe                                                                                      fo    22
 S                                                    DTT                                                ee
 6                                                                 pe                                    [._|          ==         Lead at                                                      =
 E                                                       af                                                                                  Sl...                                            8
 on                                                    |                      Lo                                                                            TT Tt
 8                                                     |                  ET (ee                                             | :      | Hi |                                                   =
 oc                                                   ———                      !                ca  4          !     ——t                                    =====-:
 Oo                                                                                                                                                            ===                             S
 ne                    concept drawings only                   ___ PRE TOUNMOY UL             memes                                                                                            Co
  oO                   not for construction             elevation A (south-east)                                ENINCE MAN STRUCTURE REFER ELEVATION                                           2
 z                                                                                                                                                                                             3
 z                    PROPOSED:                           CLIENT:                  BUILDER:                    MANDY'S DESIGN & DRAFTING            SHEET:   9 of 10] DATE:      ISSUENO.
 S                     OFFICE LAYOUT                      DOWLING & NEYLAN         TBC                         PH: 0403 481 474                     SCALE:   1-100  [JUNE 15     [I            Oo
 oa |                      one DRAWINGS TO SE READ IN CONJUNCTION NOTE: ene    DIMENSIONS BEFORE CONSTRUCTION                                                                                  QQ
  Oo                     ENSNEERS ORAHINGS                RESFONS

Section 17

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 17 of 139

rr                                                                                                                                                                                    ee
  lo                                               6caLg —                       NOOSA P                                                .                                                                    a
 5                      Existing Pandanus to remain. BCAS gia 1 \ Béstng retaining to .       ARADE                                                    L                                                     °
  o
  N
 O                        a                                                                                                           Exsting Pandanus to remain.
  xq         a                SLOMIt —                    | \      additional boulders to caded to \                                             12LOMIt                                                     -
 co                          oe                        ~~    |                  lanescape,     SN                                                 7 sR                                                        °
 5                                                SLOM sna
 D
pad          Se                Dt      shops    (pee Beans: * ooo                                  e                                  Bisting Tuckeroo to remain                                              Nw
              Dev NM        tS Je itches ee                   eR ey + +   TURE i iiiit iia      it]. TAN]        oo                                6 CALS                                                    ~
             ae      ore eR iesaeayaas      a           9    \                                 3XAN                                     Bs
              eT Sh Ee ake, Nef                       | Vee         IR         age     PSO 2) oe                py      WuResiiiisssbissstiiasi ine         bes   S                                           S)
             wet Bos GH                   :     \) Ss       Oo                       QBs «|          OW   Winiitpeeessisnsges                           7
            be       hols map           rN       PRP ONS free      a KAN, ert? Pa fae HAN Sap           \   Met Be TUREISIDGIDIIDDIDI IDI DDI ity            a NS           Dea banka a a                     o
             PP   Me rt         copa ht             re             i        )       HO ete     SE. PATH TR        YE             a   festaccuscea        AG AD ATF      Dav i. oN 2D                         a
             Foe     EF che  Pee      oo a           |} —D         ¥      j      cotta   chr assert      NERS GaSe ee           ee        ccc e seas esa 4        “2    ee   coe         5
                     en ee                 2              a      acces cece S|             .               Zowccconhd GAR ROM N sss s eee 14 AVE OO                              es     es
             Sogetn eR           ae CARPARK Ze                      mn                                           pow & paw      wate 22002                      EY   © fie          |).
             ote       ere     Det   m   Boweit   4 o                                     HI |       F     TM          ee OS ait tas eaaes hp                    Y ensssset 0   ake.
             J?      .    ‘   .     Le         br: .                                                                    tye   25                 ‘               Sa               hs?
 «           fa eee de co               BRANES            |               |  B              i              | il ii    Ne EH OR            iii: oP               iE     oN       Te: :
 9           Co RAP eas                         Td                  A                                   bee   WHIM     2        A St NK                                ir higer
 z           wept   dt   Pee epee    eh hs     Bp be            cca. got J                             man                   SRT E22: Sp                  / Sl     GBT
              ea go             hoo    aos     ‘lhe. Pe          4GREA                               8LOM sna        scary ——th     “Ff WiAaaiaauaa    Ds :   ¥ Ree         a4
 S          LeIVEWAY one     cepa coe, CAREARE. -T cides                                              ee             seen             Ke: fiitsee i aS             EP
 a           aie eh           AN Ag ceo        bs fos                                                                sxanio — II  4 R yc iianases WO          Ree      2       cree
             cet   7   at af > :, . | were moe a ae                                                    LOM It        6XAN  —_  +   > bea Ac *--* TURF: = Lead Bike
  Oo         om    fe Pt   a        Se 8           Pes                   EXSITING                            6 CALS          II           eo?     seeeiiiiiiiiii®              cal
               eee BE          a   eg re        Oe gk] ely               BUI                                         2 SPSS FE rH  YS   IN&o i, eee ees
             Cer oP         grapes   .       spor:                          LDING                           sxanip EZ             FORA    Ry     CH       sasaaaa
 —            a      ae       Dee      Pete   comet pee                                                    SLOMsha HL pt IAL o 2 Neen Me Tillie                    ,
to           aoe       a a Day", CARPARK ‘|        “fe                                                      cee    {pois t 1         SNeaee   Sata? hy
 wi         be    eg Es. foe ee eth                      .                                               scn4 -     a vost to ye NAST               Th,    ra
            eet ete          ds  Soo                                                       stone        ra z     Ep      ea       ra     _—   = ONS QS
 ti           oe      a Ove fe ee ” I ae                                                  6casgo     —     jf . le NI”         Cte, WP        Wy             tone
                Lo      "      ,     Poot       “dP  4                                            —      Pe NI BR             ear     pane   MS    a a
             >    SS   a     Pp ee              a                                                          + he       0 Pty, eo        aa   POG  ye
 E           Pe   ee  ee ae                     Se                                        ¢LoMene       }  yo       » BOF “Se   tee es ROY
 =           a     wl.   de as     SCRE oo.   a                                                  =       Pee        |    PR                  gy           2
 =            aa / in a              ite,    bl                                                               fh eee caaaeasaaaeay                      Oo
                 Nop              Ny                                                                Hi os eg                    btaataa eae
 Oo          md     es d  rd x on       Se]        yt          se                             \   Ay i OR         Bp                     7            &
             an iio |         Ry           cD   yy                                                         couteyig wens ttt 4          aaa
 Oo                ee              Ks XN              ee                                     Ngee tre          De                                 os
                                   XK. eM es) Ff           SE      GN                rr     Spee sas sa assis           RFisssees               x,
 z                                       LE        a) oF [)    anf NEA ore                   perssisseseesiiaaa        ee                     ww
 -                                                               “EY       Sn                | SERSERCRREREEDY    202 Pitot                           Tree Species:
 Oo                                               eet a eal x) a a Spoke                      Pease aa sassy          woes tts
  <x                                                                     a _                Cheap sss saa     KO      BA AY                            :  5 Boeocappus eumunci
                                Compact Syzygium Bi ‘                                    ZR            1  GR RSM,                                         3 Rancis frzcaril
                                                               —    —                  =p,  “ep     aaa e aes a et   CUAL   +
 Oo                             Compact save  pe (Ausie                                       satalinn: oP    d a J"    Sy                                5 Xanthostemon chrysantnus
 2                               .           Hedge.            Existing Sneg to remain.          seas     7 co    7, )                                 panting species:
                                 jaeocarpus eumundii screeni                                        ge          se                                     :      gia - Casuarina ‘Cousin i
                                                 ing trees.       .                                                                                    *  6 CAL gbf- Call   r
                                                           Gate for side access / servies.       eromisne                                              .  4 L gbf - Callstemon ‘Great Balls of Fire"
                                                                        i    .                    5 xAN                                                    CAL Ij - Catlistemon ‘Lite Jonn’
 S                                                                                                   Ip                                                ©  45 GREIil- Grevilea fiiane
                                                                                                                                                       ©  38LOMIt-Lomanara Lit
  Oo                                                                                                                                                   .  Downe     ae eae
 oo                                                                                                                                                    1  LX    ESS
                                                                                                                                                                         ‘Lithe Penda’
  oO                                                                                                                                                   Note:
                                                                                                                                                      Existing plantings menti
 =                               t |                                                                                                                  be retened. Any  Gre the only ones
                    _—                                                                                                                                           other existing species fo
 —                x        OU side                    la: 4 rene street, noosaville.                                                                  removed. ay             ore to
 <            RU ieeee © ooticultural specialists      See enosa.com ie Sere Seat “=  || Dowling and Neylan          cote: 19/06/2015 gecgnes by: Js + AL
                                                      we: wow.        LOU) ct contacto ae te confi client address:  job no:                -                                             ~
  za               .]                                  qi 4565          Hl nm creaming iionign & mbject to
 o                         noosa                         GENOOSG.COMLGY  a           2 |] 168 Noo:  .                    .         drawn Dy: AL                                          aA
 z                         landscape architects        P07 5448 0250     songs win age Client:
                                                       Abi: 0411 138 269 ita:           Noosaville 4566                  °         issue: A                                              Noam
            -                                         lyon: 0409 960 538 Srmcsien 3 wera event sa Parade,           scale 1:100 @AS
                                                                                                                        nolota     purpose: Operational
                                                                                                                     sneer
                                                                                                                                         Works

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015



Attachment 2 – Existing Layout Plans




                                                     Page 18 of 139

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 19 of 139

.                                                                                                                                                        g
             w
 g           oO                                                                                                                                           r
 |           5                                                                oO
be           Ris                                                                                                                                          °
 =>                                                                                                                                                       rT
 Oo          s                   LEFERFLOOR TOP PLATE __ —~ eee                                —-- ee Le                                                  o
 2           S                   “UPPER FLOOR JOINERY LINE      eee                                    eee                                                >
 =            Cc                              & 2                                                                                                         a
 r            wo                                                                              SS
             a                    See    = =       rr ————                            JAE. - = -
              co                  GROUND FLOOR TOP PLATE __ oe              |                         ee
             S                                :                 i
            Piet                  ‘GROUND FLOOR JOINERY LINE          Ld
             a                                  g
             5                    sosnon | J                                                          —_
 <x           oO                  Pov ~
 Oo           oS                               .
 o           =                            elevation B (north-east)
Ww          =                                              —<——
 ©                                                      Pia               Se
 <           ~~                                                  a                                            ee
 9                                      A
 -                                                                                ———— —
 Wu                                                  $y
Lu                                      tmoaaitle rim            itickrrtrtr6r6c6ct                              a
 =                                             ep                   on-          aoe                       oo
 E                                                              /
 Ww
 =                                      elevation C (north-west)
 Oo
 e                                                             ee
 z                                                ~ oe                                   ~ LL
Oo                                                TTT                                    TTT TT
 E                                                                                                                                           no
 3                                                         ,            —                                                                   5
 2                                                ---     ZAG                -4      SS          --                                         S
 <x                                               TT                             C                T=                                        —
 o                                                       Re HERR] Eraser Reese    bE P|                                                     =
                                                         Be sssseha| Saseescses Bessteaaes | Esssssacae                                      oO
Oo                                                       eee)    ESE | Pee | Eee                                                            2
oS                  concept drawings only         _ _ _ BBBBBBEBB) — GRRERRRRRS) | GERERRESEE BRS || | _                                    rab)
 9                  not for construction          elevation D (south-west)                                                                  =
 S        inadl OFFICE LAYOUT                DOWLING &NEYLAN  | TBC               PH 0405 461 474            Si     4:10 }JUNE 15  |         x<
 z                 PROPOSED:                CLIENT:            BUILDER:            MANDY'S DESIGN & DRAFTING SHEET: _5 of 10| DATE: ISSUENO: _“@%
oa |               NOTE: THESE DRAWINGS TO SE READ IN CONJUNCTION NOTE: BULDER TO CONFIRM SITING AND DIMENSIONS SEFORE CONSTRUCTION         o
 oO                WITH ENGINEERS DRAWINGS  RESPONSBILITY LES THERE WITH

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         18 AUGUST 2015


3                        APPLICATION FOR SIGNAGE SITUATED AT 1/25 HASTINGS STREET, NOOSA
                         HEADS OPW15/0118
DOCUMENT INFORM AT ION




Author                           Development Planner, Glen Conforti
                                 Planning & Infrastructure Department

Index                            ECM / Application / OPW15/0118

Attachments:                     Nil



         APPLICATION DETAILS

         Applicant                          Dowling & Neylan Real Estate

         Proposal                           Development Permit for Operational Work (Signage)

         Properly Made Date                 09/07/2015

         Information Request Date           Not Applicable

         Information Response               Not Applicable
         Date

         Decision Due Date                  27 August 2015


         PROPERTY DETAILS

         Property Address                   Tingirana Commercial 1/25 Hastings Street, Noosa Heads

         RP Description                     SP 133504
                                            Lot 1 SP 133504

         Land Area                          119m²

         Existing Use of Land               Shop


         STATUTORY DETAILS

         SEQRP Designation                  Urban Footprint

         Locality                           Noosa Heads

         Zone                               Visitor Mixed Use

         Assessment Type                    Code




                                                                                           Page 20 of 139

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       18 AUGUST 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 18 August 2015 and refuse Application No. OPW15/0118 for a
Development Permit for Operational Works (Signage), situated at 25 Hastings Street, Noosa
Heads for the following reasons:
1.   The proposed signage is inconsistent with the overall outcomes sought by The Noosa
     Plan’s Advertising Devices Code, because it:
     a.      involves a sign exceeding the maximum sign face area for a single sign;
     b.      involves a total sign face area exceeding the Code’s limit;
     c.      will result in a proliferation of signage and visual clutter; and
     d.      involves signage that detracts from the desirable characteristics of Hastings
             Street.
2.   The proposed signage will adversely impact on the character and amenity of Hastings
     Street.



REPORT
1.   PROPOSAL
The applicant seeks approval for various signs to a shop front and stairwell at 25 Hastings
Street. In summary the proposed signs are:

 Sign type     Location                            Sign dimensions (m²)          Size face area (m²)
 Wall sign     Continuous display boxes            4.3 x 2.1                     9.03
               fixed to a stairwell
 Wall sign     logo on column                      1x1                           1 (approx.)
 Wall sign     logo above entry door               1.2 x 0.3                     0.36 (approx.)
 Window        window display boxes beside         1.3 x 2.1                     2.73
 sign          the entry door
 Total sign face area                                                            13.12m²

The largest wall sign, an area of continuous display boxes, is proposed to be wrapped
around one of three columns/stairwells of the development. The total sign face area for the
display boxes is 4.3m x 2.1m, being 9.03m².

Two additional wall signs (Dowling Neylan logos) and a window sign (as display boxes) are
included on the artist’s impressions which have not been included on the architectural plans.
All signs on the premises must be considered for assessment of signage. The two wall signs
are approximately 1m² and 0.36m² and the window sign is 2.73m² (1.3m x 2.1m) adding an
additional area of 4.09m² to the total sign face area for the premises.

The signs, as proposed, do not comply with the Probable Solutions of the Advertising
Devices Code in regard to total sign face area of 10m² and the maximum sign face area of
4m² permitted on a premises. An artist’s impression of the proposed signage is shown below
in Figure 1.

The application is before Council as the signage is recommended for refusal.




                                                                                           Page 21 of 139

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015




Figure 1 – Artists impression of the proposed signage.
2.   SITE DETAILS
2.1. Site Description
The shop is at street level at the western end of the Tingirana complex adjacent the walkway
connecting Hastings Street to the beach. The signs are placed on the stairwell wall (part of
common property) and the shop front. Figure 2 below identifies the shop’s location.




Figure 2 – Tingirana highlighted in purple and the location of the shop within the complex is
circled.


                                                                                 Page 22 of 139

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015




Figure 3 – The existing shop front
2.2. Surrounding Land Uses
The shop is located on Hastings Street where a variety of commercial and residential uses
exist. The site is located adjoining a walkway to the beach.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions;
   any Structure Plan or Master Plan in place for declared areas;
   any Preliminary Approval Overriding the Planning Scheme for the land;
   the Planning Scheme for the local government area; and
    any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. Statutory Instruments – Planning Scheme
The subject site is located in the Noosa Heads Locality and is zoned Visitor Mixed Use. The
proposed signs are identified as inconsistent and are required to follow a code assessable
application process.


                                                                                  Page 23 of 139

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


Signage Provisions
The Advertising Devices Code regulates signage and is applicable to this application. The
pertinent issues arising out of the assessment against the code are discussed below.
Definition of Sign face area
The applicant suggests the sign face area of the wall sign (continuous display boxes) is
1.512m² and has calculated the size of 1 x ‘display sheet’ that is placed within each display
box and multiplied it by the number of display boxes. This method of calculation is not
agreed with as it is not per the Planning Scheme definition which states:
Sign face area means—
a)   the area of the smallest rectangle that can wholly contain the advertising device,
     inclusive of any decorative lines, stripes, borders and architectural trims that
     immediately surround the device;
It is considered the whole display case fixed to the wall is calculated as sign face area which
includes a border and architectural trim.
Non-compliance with Probable Solutions
The wall sign face area (continuous display boxes) of 9.03m², located around a masonry
stairwell, does not comply with Probable Solution S2.6 which limits the sign face area of a
wall sign to a maximum of 4m².
The total sign face area (the combined area of all signs on the premises) of 13.12m² does
not comply with Probable Solution S2.7 which limits the total face area for the premises to a
maximum of 10m².
Given the non-compliance with the above Probable Solutions, the signs must be assessed
against Specific Outcome O1 g) & j) and Specific Outcome O2 of the Advertising Devices
Code as follows:
Specific Outcome O1 The following advertising devices are inconsistent with the overall
outcomes sought by this Code and are not located in the former Noosa Shire —
a)   Balloons or other gas filled advertising devices;
b)   Blind signs;
c)   Attached Flagpole signs;
d)   Moving signs;
e)   Roof signs;
f)   Signs illuminated by, or incorporating, neon lighting;
g)   Signs with a sign face area exceeding 4m²;
h)   Sky signs;
i)   3-Dimensional sign;
j)   any combination of signs on one premise with a combined sign face area of more than
     10m².
Specific Outcome O1 g) & j) states the proposed signage is inconsistent with the outcomes
sought by the Advertising Devices Code.
Specific Outcome O2 Advertising devices—
f)   are compatible with the human-scale and character of the locality in which they are
     situated;
g)   are compatible with the scale, proportion, bulk and other characteristics of buildings,
     structures and landscaping; and
h)   are designed, sited and integrated so as not to contribute to the proliferation of visual
     clutter.




                                                                                   Page 24 of 139

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   18 AUGUST 2015


Sign Face Area
The 9m² wall sign is out of character with existing signage in Hastings Street where small
shop frontages provide for limited small scale signage. The applicant has provided examples
of some larger window signs (greater than 4m²) in Hastings Street but this is not the
established character of the street signage overall. Given the small scale of shops in
Hastings Street and the narrow shop front of the subject premises, the 9m² sign is not
compatible with the scale and proportion of the premises or the developed character of
Hastings Street.
Furthermore, the 9m² sign is proposed on the stairwell which protrudes nearly 2m forward of
the building alignment making the large sign more prominent to the street and adding to the
proliferation of visual clutter.
Total sign face area
The total sign face area proposed is 13.12m² exceeding the maximum permissible sign face
area of 10m².
The shop front is approximately 3m wide but the use of the adjoining common property (the
stairwell) creates approximately 6m of frontage to Hasting Street; a narrow street frontage.
The total signage on the subject premises of 13.12m² is considered incompatible with the
character of the small scale signage in Hastings Street and out of proportion with the narrow
subject site’s frontage and the surrounding developments. The majority of the 13.12m² will
protrude forward of the building alignment creating a prominent (both in size and location)
signage display adding to the proliferation of visual clutter.
4.     CONCLUSION
The 9m² sign is more than double the size permitted by The Noosa Plan. The total signage
to the 6m frontage is not in proportion to the premises or consistent with the developed
character of Hastings Street and will therefore contribute to the proliferation of visual clutter.
The proposed size and quantity of signs are inconsistent with the overall outcomes sought
by the Advertising Devices Code and are recommended for refusal.

Departments/Sections Consulted:

     Community Services                       X   Planning & Infrastructure
     Disaster Management & Public Order           Building & Plumbing Services
     Waste & Environmental Health                 DA Planning
     Community Facilities                         Strategic Land Use Planning
     Cultural Facilities                          Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

     Executive Office                             Corporate Services
     Community Engagement                         Finance
     Customer Service                             ICT
     Executive Support                            Procurement & Fleet
     Governance                                   Property & Facilities
     Human Resources                              Revenue Services




                                                                                      Page 25 of 139

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         18 AUGUST 2015


4                       DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
                        ADDITIONS TO AN EXISTING MULTIPLE DWELLING - TYPE 4 CONVENTIONAL
                        AT 41 BELMORE TERRACE SUNSHINE BEACH (MCU15/0025)
OCUMENT INFORM AT ION




Author                          Coordinator Planning, Denis Wallace
                                Planning & Infrastructure Department

Index                           ECM / Application / MCU15/0025

Attachments                     1.   Proposal Plans
                                2.   View Assessment Plans



         APPLICATION DETAILS

         Applicant                         PI Home Pty Ltd
         Proposal                          Development Permit for Material Change of Use of Premises
                                           - Multiple Dwelling Type 4 (Alterations and Additions to an
                                           Existing Unit)
         Properly Made Date                22 April 2015
         Information Request Date          11 May 2015
         Information Response              19 June 2015
         Date
         Decision Due Date                 01 September 2015
         Number of Submissions             Two (2)


         PROPERTY DETAILS

         Property Address                  41 Belmore Terrace Sunshine Beach QLD 4567
         RP Description                    Lots 0,1&2 GTP141
         Land Area                          607m2
         Existing Use of Land              Multiple Dwelling (3 Units)


         STATUTORY DETAILS

         SEQRP Designation                 Urban Footprint
         Locality                          Eastern Beaches
         Zone                              Semi-Attached Housing
         Overlays                          Landslide Hazard Area
         Assessment Type                   Impact




                                                                                            Page 26 of 139

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   18 AUGUST 2015


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Organisation
Committee Meeting dated 18 August 2015 regarding Application No. MCU15/0025 for a
Development Permit for Material Change of Use for a Multiple Dwelling Type 4 (Alterations
and Additions to an Existing Unit) situated at 41 Belmore Terrace, Sunshine Beach and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied
           with prior to the use commencing, and then compliance maintained at all times
           while the use continues.
     Approved Plans
     2.    Development undertaken in accordance with this approval must generally
           comply with the approved plans of development. The approved plans are listed
           in the following table unless otherwise amended by these conditions.
            Plan No.    Rev.   Plan/Document Name                                          Date
            CALC 01     C      Floor Plans and Calculations by                             04/06/2015
            1           D      Northwest Elevation by Robin Spencer Architects Pty Ltd     05/06/2015
            2           C      Northwest Elevation by Robin Spencer Architects Pty Ltd     05/06/2015
            3           D      Entry Level by Robin Spencer Architects Pty Ltd             19/05/2015
            4           B      Upper Entry Level by Robin Spencer Architects Pty Ltd       19/03/2015
            5           D      Kitchen Level by Robin Spencer Architects Pty Ltd           05/06/2015
            6           D      Master Bed Level by Robin Spencer Architects Pty Ltd        05/06/2015
            7           B      Northwest Elevation by Robin Spencer Architects Pty Ltd     19/03/2015
            8           C      Sect AA by Robin Spencer Architects Pty Ltd                 05/06/2015

            9           C      Northwest Elevation/ Southwest Elevation by Robin           05/06/2015
                               Spencer Architects Pty Ltd
            10          C      Southeast Elevation by Robin Spencer Architects Pty         05/06/2015
                               Ltd
            -           -      Plan of Detail Survey of Lots 1,2 and Common                10/06/15
                               Property on GTP 141 by Murray & Associates (QLD)
                               Pty Ltd
           Development authorised by this approval must be undertaken generally in
           accordance with the Approved Plans listed within this Decision Notice.

     Building Height
     3.    The maximum height of the development must not exceed Reduced Levels
           indicated on the approved plan titled “Plan of Detail Survey of Lots 1, 2 and
           Common Property on GTP141” by Murray & Associates (QLD) Pty Ltd.
     4.    Certification must be submitted to Council from a Licensed Surveyor which
           certifies the building does not exceed the Reduced Levels shown on the
           approved plan referenced in Condition 3.




                                                                                         Page 27 of 139

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015


    5.    Certification must be submitted to Council from a Licensed Surveyor which
          certifies the building will not exceed the Reduced Levels shown on the approved
          plan referenced in Condition 3, based on construction progress at the time of
          completion of framing (i.e. top plates) to the roof level of the approved atrium.
    Performance Bond
    6.    Security in the form of a cash bond or trading bank guarantee to the sum of
          $10,000 must be submitted to Council, to secure performance of all conditions of
          this approval, prior to the pre-start meeting. The cash bond or trading bank
          guarantee will be returned on performance of the conditions of approval less any
          costs incurred by Council in respect of enforcing performance of this permit.
          Council reserves the right to call upon the bond or guaranteed sum to effect
          compliance with condition.
    Building Appearance
    7.    All air conditioning units or other mechanical equipment must be fully enclosed or
          screened such that they are not visible from the street frontages nor adjoining
          properties.
    8.    All deck and balcony areas above ground floor must not be enclosed by
          permanent fixtures such as shutters, louvres, glass paneling or the like.
    9.    The approved lift shaft must be glazed and predominantly transparent, as
          indicated on the approved plans.
    10.   External finishes to the approved lift shaft, including any metal cladding or
          flashings, must have low reflectivity to avoid glare nuisance to neighbouring
          premises.
    Landscaping
    11.   Existing trees on the site and within road reserves must be retained, except
          where required to be removed to accommodate the approved dwelling.
    12.   Trees to be retained must be protected from clearing or construction activities by:
          12.1.1.   clearly marking vegetation to be retained with flagging tape
          12.1.2.   installing protective fencing around the drip line of the vegetation
          12.1.3.   restricting stockpiling, storage and vehicle parking to those areas
                    which are already cleared
          12.1.4.   using low impact construction techniques around vegetation.
    13.   The development site must be landscaped prior to the commencement of use.
          All open space areas disturbed by the construction and/or within the site’s rear
          setback must be planted with dense native screening vegetation of suitable
          coastal shrub and tree species up to a mature height of 5m.
    14.   All landscape works must be established and maintained in accordance with
          horticultural best practice with construction techniques that allow for healthy,
          sustained and vigorous plant growth. All plant material must be allowed to grow
          to full form.
    WASTE
    Refuse Management
    15.   Where the development involves the removal, relocation or demolition of a
          building, a Waste Management Plan (construction and demolition) shall be
          submitted and approved by Council prior to issue of a development permit for



                                                                                   Page 28 of 139

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


          operational works. Waste Management Plans (construction and demolition) are
          required to be submitted in accordance with Planning Scheme Policy 11, Waste
          Management Plans see table below. Waste storage areas are to provide for
          adequate separation of all reusable, recyclable and waste materials. These shall
          be located so that they are convenient and safe to use. (Refer to Noosa Council
          Waste Management Code). The Plan shall contain the following information:
               The site area for the storage and separation of waste is to be shown on the
                 plan drawings accompanying the application.
               A waste management table as indicated below is to be completed showing
                 how waste material is to be segregated - recycled – reused or disposed.
               MATERIALS ON-SITE                DESTINATION
                                                Re-use and Recycling                   Disposal
           Expected waste        Estimated    On-site             Off-site           *specify
           materials             volume(m³)   *specify proposed   *specify           contractor and
                                              re-use or on-site   contractor and     landfill site or
                                              recycling methods   recycling outlet   other disposal
                                                                                     site
           Excavation material
           Green waste
           Bricks
           Concrete
           Timber-please
           specify
           Plasterboard
           Metals - please
           specify
           Asbestos
           Other - please
           specify
          Note* If a demolition contractor is undertaking works, then the Waste
          Management table is to be completed by the demolition contractor.
    16.   The developer must provide waste storage and disposal facilities in accordance
          with Planning Scheme Policy “Waste Management Multi-Dwellings and
          Commercial and Industrial Premises”, including an external imperviously paved
          area correctly sized for all refuse and recycling containers and suitably screened
          from public places and neighbouring properties.
    ENVIRONMENTAL HEALTH
    Noise Nuisance
    17.   Noise emission from any new mechanical equipment shall comply with the
          following requirements:
          17.1. Air-conditioning and Refrigeration
                    7am to 10pm: Maximum background + 5dB(A)
                    10pm to 7am: Maximum background + 3dB(A)
          17.2. Pumps
                  7am to 7pm: Maximum background + 5dB(A)
                  7pm to 10pm: Maximum background + 3dB(A)
                  10pm to 7am: No audible noise.




                                                                                     Page 29 of 139

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015


    18.   Submission of written certification from a suitably qualified person confirming that
          the noise levels from all mechanical equipment comply when measured at either
          the residential boundary or outside the most exposed part of an affected building,
          whichever is the closest to the equipment. The assessment and certification is
          required immediately after installation of the equipment and prior to any
          occupation of the building, and in a format approved by Council. All equipment
          should be operating at the same time to test the overall noise level created.
          Advice: It is highly recommended that the person you engage to certify the
          installation is involved at the plan development stage so they can recommend
          where this equipment is best located. They can also advise about noise
          enclosures and can make other suggestions to avoid noise problems. It is a lot
          more costly to try and deal with noise problems after everything is built.
    19.   Noise from residential building works shall comply with the following –
          19.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
          19.2. All reasonable measures are taken to minimise noise emissions.
          19.3. Not permitted on Sunday or public holidays.
    ENGINEERING
    Geotechnical Stability
    20.   A Geotechnical Engineer or similar qualified person must assess the soil
          condition on site, determine the soil classification, establish whether any
          measures are required to protect the stability of adjoining buildings and/or
          structures and/or land, and make recommendations on the type of foundation
          system(s) best suited for the proposed development. The recommendations of
          this report must be incorporated into the design and construction of the proposed
          development.
    21.   Earthworks required on site must be carried out in accordance with Council’s
          Planning Scheme Policy PSP5 – Engineering Design Standards so as not to
          cause the additional ponding of water on any adjoining lands or the blockage of,
          or interference with, any natural watercourses.
    22.   A Condition Survey must be carried out on adjoining buildings, structures and
          services prior to any demolition, excavation or construction works taking place on
          site. If distress already exists, a photographic survey should be undertaken, the
          distress measured and a plan to monitor changes to distress must be
          implemented. Copies of these surveys must be submitted to Council for its
          records
    23.   The use of vibratory equipment of any kind is not permitted to be used (including
          vibrating rollers and the use of vibrating installation techniques for sheet piling
          and other construction vibrations caused by excavating, earthmoving or
          demolition machinery or other similar construction techniques) unless approved
          and supervised by a Certified Geotechnical Engineer. Under such
          circumstances the operator of such equipment must at all times comply with the
          directions of the Geotechnical Engineer.
    24.   The excavation of the site and the construction of the proposed works must not
          have any adverse effects on the stability of adjoining buildings and/or structures
          and/or services and/or lands. In this respect, a Registered Professional Engineer
          Queensland must supervise the excavation of the site and the construction of the
          new works to determine whether any additional measures are required to protect
          the stability of adjoining buildings and/or structures and/or services and/or lands.



                                                                                    Page 30 of 139

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   18 AUGUST 2015


     25.    At the completion of the development a suitably qualified and accredited
            consultant must provide certification to Council that states that:
            25.1. the development has been undertaken in accordance with the design
            25.2. the development will not have any long term effects on the stability of the
                  subject site or any adjoining properties
            25.3. the site has a minimum factor of safety against landslip of 1.5.

     Advisory Notes
     Compliance Inspection
     1.     Prior to the commencement of the use, please contact Council's DA Planning
            Section to arrange a Development Compliance Inspection.
     Qualified Person
     2.     For the purpose of preparing a Geotechnical Report, and for certifying
            geotechnical stability for the development, a qualified person is considered to be
            a person who:
            2.1. is a Registered Professional Engineer of Queensland (RPEQ); and
            2.2. has a degree in civil engineering or engineering geology; and
            2.3. has a minimum of 5 years’ experience in the field of geotechnical
                 engineering or engineering geology.
B.     Find the following sufficient grounds to justify the decision despite the conflict with the
       Planning Scheme:
       1.    The multiple dwelling use is existing on the site and the development does not
             involve intensification of the use in regard to the number of units or population
             density.



REPORT
1.   PROPOSAL
The application seeks a Development Permit for renovations and additions to a unit within an
existing unit development of 3 units on the site. The land is steeply sloping and the existing
units are configured with 2 units at the front of the site and 1 at the rear. Substantial
additions are proposed to the rear unit, comprising:
     Enclosure of an existing roof deck to create a new storey containing a bedroom,
       ensuite, study and deck.
     New basement board storage room.
     Renovation and extensions to the existing ground and first floor levels, including
       additional decks and atrium area.
     Addition of a new passenger lift.
While the multiple dwelling use on the site is existing, the works are considered to constitute
a Material Change of Use due to the increase in scale of the building proposed. In
particular, portions of the works will exceed maximum building height of either 8m or 2-
storeys, including:
    A new lift shaft to approx. 9.4m
    A section of exterior feature timbers/battening to approximately 8.6m
    A portion of the building constitutes 3 storeys
The proposal plans are included as Attachment 1.


                                                                                      Page 31 of 139

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             18 AUGUST 2015


2.   SITE DETAILS
2.1. Background
The existing units on the site were approved via Town Planning Consent (TPC230) in 1972.
At the time the site contained an existing house at the rear of the block and the Consent
allowed the construction of 2 additional units toward the street frontage.
2.2. Site Description
The site is rectangular in shape and 607m2 in size. A large dune is apparent between Bryan
Street and Belmore Terrace, with the crest line running through the Bryan Street properties
to the rear of the subject site. The land slopes steeply toward the Belmore Street frontage
and has an overall fall of approximately 11m across the site’s 40.2m depth, representing an
average slope of 27%. The land toward the rear of the site where the new works are
proposed is particularly steep, with slopes exceeding 40%.

The open space areas on the site contain a mix of native and exotic trees, shrubs and palms
and existing vegetation is reasonably dense at the rear of the development.
2.3. Surrounding Land Uses
The site is directly adjacent detached houses and duplexes within the Semi-Attached
Housing zone along the northern end of Belmore Terrace. A number of larger unit
developments are further to the south on Belmore Terrace within the Attached Housing
zone. Properties off Bryan Street directly at the rear of the site are within the Detached
Housing zone and contain single houses. Figures 1-3 below show an aerial photograph,
zone map and street view.




                               Figure 1 – Aerial Photograph




                                                                                Page 32 of 139

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                         Figure 2 – Zone Map




                        Figure 3 – Street View



                                                     Page 33 of 139

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  18 AUGUST 2015


3.     ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
    State Planning Policies;
    the South East Queensland Regional Plan;
    State Planning Regulatory Provisions;
    the Planning Scheme for the local government area; and
    any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal
is consistent with the regional policies and regulatory provisions of the SEQ Regional Plan.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Eastern Beaches Locality and is zoned Semi-Attached
Housing. The existing multiple dwelling use of 3 units on the site is identified as inconsistent
within the zone and the application is therefore required to follow an impact assessable
application process.
Locality Provisions
The code seeks to limit development within the Semi-Attached Housing zone to detached
houses and duplexes, however, the 3 units on the site lawfully exists. The applications
seeks to maintain the existing population density for the site (i.e. number of units/bedrooms)
and make additions to the rear unit that remain generally within the built form limits provided
by the code, though some relaxations are sought. The table below outlines the
development’s level of compliance with the built form provisions for a duplex dwelling on the
site.

 Criteria                        Planning Scheme                    Proposal       Complies?
                                 (or “existing” where applicable)
 Site Area                       500m²                              607m²              

 Population density              6.7 persons max                    6.7 persons        
                                 (existing approved)                (no change)
                                 (1 x 3bd, 2 x 1bd)
 Gross floor area or             273m² max                          261.6 m²           
 Plot ratio                      0.45:1 max.                        0.43:1             
 Site cover                      45% max                            40 %               
 Landscaped open space           268 m² min                         295 m²             
 Soft landscaping                min 60% of total                   >60%               
 Building height
    storeys                    2 storeys max                      3 storeys          X
    metres                     8 metres                           9.4 metres         X



                                                                                    Page 34 of 139

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      18 AUGUST 2015


Criteria                         Planning Scheme                    Proposal           Complies?
                                 (or “existing” where applicable)
Boundary setbacks
  Frontage                     6 metres min                       7 metres              
  Side                         2 metres min                       2 metres              
  Rear                         6 metres min                       2.5-3.0 metres        X
Length of wall                   15 metres max                      12 metres             
                                                                    approx.
                                                                    (for new works)

The new works require relaxations to the maximum building height in metres and storeys
and the rear boundary setback.
 Building Height in Metres
The proposal plans indicate 2 portions of the building additions will exceed maximum
building height in metres above Natural Ground Level, being the top of the new passenger
lift shaft (to approx. 9.4m) and external timber cladding features to the new atrium area (to
approx. 8.6m). These are indicated as penetrating the height envelope in the perspective
view in Figure 4 below.




                 Figure 4 – Architectural Perspective Showing Height Envelope


                                                                                        Page 35 of 139

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   18 AUGUST 2015


The lift shaft is only 2m x 2m in area and sits within the middle of the site, behind the existing
units at the front of the lot and in front/below the rear unit it provides access to. The primary
concern with the lift is its effect on the views of the neighbouring property to the north (43
Belmore Terrace).        A joint inspection was undertaken with these neighbours and
photographs of the existing view provided to the project architect for further consideration.
Attachment 2 shows plans provided to assess the impact on the view in detail. Figure 5
below shows an extract of that plan and indicates only a minor loss of sky view.




             Figure 5 – Superimposed View to South from Neighbouring House


The height incursion of the top of the 2m x 2m lift shaft does not significantly add to the
building’s bulk or unduly impact on the views or visual amenity from the neighbouring
property. Conditions are recommended requiring the lift shaft to be predominantly
glazed/transparent, as indicated on the proposal plans, and for all external finishes to have
low reflectivity to avoid glare nuisance.
In regard to the 0.6m relaxation required for the timber architectural features extending
above the roofline (shown in Figure 4), this relaxation is considered minor and will have
negligible impacts. The proposed relaxations for building height in metres are therefore
supported.
 Building Height in Storeys
The addition of the new upper level results in a portion of the building constituting 3 storeys,
as shown in the plan extract in Figure 6 below.




                                                                                      Page 36 of 139

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  18 AUGUST 2015




                     Figure 6 – Section Plan Extract (Annotation Added)
The full section plan is included in Attachment 1. The unit’s existing lower level, shown as
“Guest” above, is excavated into the hillside and partly constitutes a basement. The portion
more than a metre out of the ground constitutes a storey under planning scheme definitions
and results in the 3-storey portion. Overall, the building steps up the hill in 2-storey portions
and the lower-partial basement is not visible. The lower level of the rear unit is also
screened from view from the street by the front units.
The building could be made to comply by demolishing the lower guest area to become a
sub-floor area but this would have no real effect on the building’s bulk. The relaxation
generally relates to the site’s steep slope and is considered relatively minor, with no
significant impacts on building bulk or the visual amenity of the development.
 Rear Setback
The proposal plans seek to convert the existing terrace area at the rear of the building to an
open-air outdoor shower area with a new suspended-floor bunk room and bathroom above.
The existing terrace area is shown in Figure 7 below.




                               Figure 7 – Existing Rear Terrace


                                                                                     Page 37 of 139

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              18 AUGUST 2015


The terrace conversion and bunk room addition encroaches into the rear setback, with the
rear wall of the bunk room set back 3m from the rear boundary and the lower supporting
framework set back approximately 2.5m, as shown clouded in red in Figure 8 below.




                             Figure 8 – Section Plan Extract
The rear encroachment is approximately 4.2m wide and is less than 1/3 of the site’s width,
as indicated in the plan extract below.




               Figure 9 – Upper Level Floor Plan extract (annotation added)



                                                                                Page 38 of 139

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  18 AUGUST 2015


Construction of these rooms above the existing terrace should require minimal vegetation
disturbance, with existing dense screening vegetation able to be maintained and enhanced
with new plantings. As indicated in the section drawings in Figures 5 & 8, the encroachment
sits below the height of the roofline at the complying setback and does not result in the loss
of views for residents at the rear. The reduced rear setback is supported, with conditions
recommended relating to the existing vegetation and new landscaping requirements.
Land Use, Works and Overlay Provisions
The following codes which regulate land use and design are most applicable to this
application:
    Residential Uses Code
   Landscaping Code
   Engineering Works Codes
   Natural Hazards Overlay Code
The application has been assessed against each of the above applicable codes and
complies, or can be conditioned to comply with each. The critical issue of slope stability is
discussed further below.
   Slope Stability
The site is within a Landslide Hazard Area identified on the Natural Hazards Overlay
mapping. The soil is sand and slopes very steeply toward the rear of the block. Limited new
excavation and groundwork is indicated on the proposal plans, however, a precautionary
approach to any such work is important to avoid landslip or disturbance of existing
structures. Council’s Operational Works Coordinator recommends a number of conditions
requiring a Geotechnical Engineer’s design and supervision of the works, condition surveys
of existing structures and prohibition of vibratory earthwork equipment.

4.   CONSULTATION
4.1. IDAS Referral Agencies
Not applicable
4.2. Other Referrals
The application was forwarded to the following internal Council specialists:
   Development Engineer
Their comments form part of this report.
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the
Sustainable Planning Act 2009. 2 properly made submissions were received. The following
table provides a summary and assessment of the issues raised by submitters.


 Issues                                    Comments
 The height of the development             The new additions mostly comply with the height
 doesn’t comply and is a blight on the     limit, with only minor relaxations sought - the
 landscape. It will obstruct views and     primary being a 2m x 2m lift shaft. The building is
 isn't in keeping with the surrounds.      otherwise well articulated and its design responds to
                                           the site’s steep slope.




                                                                                     Page 39 of 139

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   18 AUGUST 2015


 Issues                                    Comments
 Excavation Work has the potential to      Agreed. Extensive geotechnical conditions are
 cause movement in the sand and            recommended to address this issue.
 weaken the foundations and
 footings of adjoining properties.
 Previous excavation work at the rear      The recommended conditions do not prescribe the
 of the property has not been              type or extent of works to stabilise the site and
 stabilised with a retaining wall of any   works but require detailed assessment and
 kind or by any other method. Given        supervision by a geotechnical engineer.
 the slip potential of the sand which
 comprises the hillside in the entire
 area, stabilisation remedial work
 needs to be undertaken before any
 further construction work or
 landscaping can be considered on
 the site.
 A privacy wall should therefore be        Existing and enhanced plantings at the rear of the
 constructed at the rear to screen         site are preferred for this purpose rather than the
 views into the neighbouring property      construction of a wall or fencing that would require
 at the rear.                              removal of vegetation. Conditions are
                                           recommended accordingly.
 Are there any regulations regarding       No planning controls apply, however, any new
 rooftop TV antennae?                      antennae is only likely to be erected to the height of
                                           existing antennae on the site and adjacent
                                           properties.
5.     CONCLUSION
The proposed additions and alterations to an existing unit on the site raise non-compliance
issues relating to the planning scheme provisions for building height and the rear setback.
The additions to the unit are substantial, however, the development otherwise generally
accords with the built form provisions for a duplex building on the site. The height relaxations
sought are relatively minor components of the works and result in part from the site’s steep
slope. The areas of non-compliance for height are not considered to significantly add to
building bulk, impact on views or detract from the visual amenity of the development.
Similarly, the building’s encroachment into the rear setback is a small portion of the building,
will be well screened by vegetation within the setback and does not impact on neighbours’
views. The application is therefore recommended for approval, subject to conditions.

Departments/Sections Consulted:

     Community Services                        X   Planning & Infrastructure
     Disaster Management & Public Order            Building & Plumbing Services
     Waste & Environmental Health              X   DA Planning
     Community Facilities                          Strategic Land Use Planning
     Cultural Facilities                           Asset Design & Investigations
                                                   Asset Planning
                                                   Civil Operations
                                                   Environment

     Executive Office                              Corporate Services
     Community Engagement                          Finance
     Customer Service                              ICT
     Executive Support                             Procurement & Fleet
     Governance                                    Property & Facilities
     Human Resources                               Revenue Services




                                                                                      Page 40 of 139

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015

                                                                      ATTACHMENT 1




                                                     Page 41 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015
                                                                                  ATTACHMENT 1
                        fo                   fo           SY     f                  eT
                        |                        PRET                         ti]

                          ech                 Ee                 Pe |
                          re                    s7       |       Wy |               ti
                       |               po |     8        6 |     |  64        6) OP
                      Grouno room pean,    rinerrucon pian      noorosex pian       pe
                           es              es sa:               Serres:             “34 .
                                                                                    Bo? Ge
                                                                                    Bye 2B
                         Wg  SAREE                             na          wr   tam
      elo                (AAV                |)                 ae

                                                                                    2e E3

                                                     Page 41 of 139

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 42 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA         18 AUGUST 2015
     Wh                    ROOF PLAN OVERLAY ON DETAIL SURVEY FOR.
   /                        41 BELMORE TERRACE, SUNSHINE BEACH / wa
                                  |          / [     | /- —
                “oo MINTUMLLUULNLI NELLY /     Py
                                         ‘              |       S/n
            sll                                      |
                              ce Yc peda /
               |  el    3      ss Isl | 3                             |
            ‘III     |       a      |              /                  |
             HA, 225, = teze |Pe D oae           =    /
            | Ih pry                     [        {/)        A,       |
            I)    1 A             A    aa WY),                      \
              |          Lom,                    fF                 .
             i            \ \\                                     n                ~ SCHEMATIC VIEW ONLY
                                     |                             n        eens
              | uf    \ \       ]/ \ ~             ) \               /   asl CMM       — —
               yr                                   ‘——_—i.
                            S                         /, /                 iS                 ; |
                                                          a)                                 i!
                ;            ~                         ?             :                       Il
  aa |                                                     |

                                                           Page 42 of 139

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 43 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                   18 AUGUST 2015

             |        .                       : L     t..                                              rn ae
                                              {|       ;
                 |                              rm i   |g
                         :                     arr
   |                                          A         \                     .
                                                        ‘eo                        c          .
                                                     =f      gS                   5
                      |              [2g             g3      8:      G            ss
                                                     SS      f4y                  2
                               |      /   #          §       aia     6B           ¢                        :
                   N      —    po        aie          SE     PBF    fe     ntact       Heep oe
   |                or:                 g           ey             |                       .
                    \     g         )  4         ;    es pe                                           ‘
                sae       op               RT   NET. WE laps                                 |
                          4               WS    Vet         | F=f] ayn          .        ,
                5 ae     im        teeth    bo EB SIRES,          SA
         |          *     8    FRO              R ESREVREELE                    |            !
                               A;        ae    Ni   SE a                                     ~
   |                                 ea)       CESS ea                                        Y
                                 |   s      Se                        Zt    =           -
      .             ,                  NN oO         te Setgtereesd,     ——
                                    Se)        eS                NUE
                                    po   ROS]  ANTS             Se
                                     co ‘BS? \  Lo      ae      =r KL
                                     /      oS        oN         3!   “te
                                     ae              ee            Le
   |                                  Dom.            ORR             ye gE
                                          A        a   *         f——4  i$           3
   |           |                          "              Pps a                                               |
                                                         =       |} eee Fe          =
        ,            w- scr rl OR             i OETA cacn   Pais siemecare IP ESN   Bat
                 Down    omen  ee     ey ge  aw FINNEY     eae 7 \                  Kon on one. Be
         :     4| ene “me      SRIEER feat   EMM           EEA        F: 3392 1055 Ect  ae          ..
        ‘         OF                                                 .
    . .               b                                  {          .                                  ss.
                                                                     Page 43 of 139

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 44 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            18 AUGUST 2015

                                / took dele                         .                             LEnEene
                                           hin
    —      Som     .         nan ps —               Wiens Lies                           mnt.      ER Shinty Ste hut
                  | ‘ry                             oann Med TOY
                      Pen,                          vath wr                              TS Pp (OBO sre] A001 HAS
      |         Taare     “ fF Ae           o-            9                                                   ‘
         BOOS  WV    FO AO        Rig       SOW.           :                                 oe       y       .
      Ki ae pT                                TP         (\                                YZ      Rateeto noahiens             |
                SIO Ae ade              eye, ICY        *                                     tH
                 wis LN Becca prac AACE   mie .                   ee
              SE                         ee                   T
    *                               |         ae: df, (OS    Ah                                            ‘
             I             Reo) “Aer |      LLM OS                                                                      /
       |                    ee                              Ny                            sre eee
                                                    ;        a                          ExShe      ats
                         ~               ;     -     [Ames 1! T      |
                i  i                                  ,    /  .    ued      |                                 )
       |  Bright         Powe      -aben   nia         KA            |
          WS      a             animal                a
       |  tevveo       Lt             a   |
       \                 “e-Qow emake        —sS    |         —                                             _
      |.                    LISwO VEL               i           om                                  ys        -
       |                    Kt SOUR Cele                 ee                                                                    t bE
       |                                                    =                       _               ia                  seumor€ ee
       }                                                        ~ .
       i            RETAIN FLATS AS EXISTING                      ;   »                                                             |
       j as       ___EXISTING RESIDENCE PART DEMOLISH                                                                         ge    |
                    RENOVATE AND EXTEND                                     q           L                   i        oe |

                 % Pretose               ;                                                                                          .
                     RODS te ERSALRA
                           2"                         GWAR      en BOG
                    om                am,           SUNSHINE BEACH   a                       Spee ben
                  pear oe            oom    Pd FINNEY            seit       TP               Sik tt
                    op 1S oman te ag                                     . .   ~~ ee         con ow on ia

                                                                               Page 44 of 139

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 45 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           18 AUGUST 2015

       a                 j—          fo.        _—       _——   .    a 2    —    5      <—               ‘     te
                                                           ~              s     Boy                   -      —
        ;                   TPE nrc: Seana lo                  j              noe         ~    €     --—    “=
   |    |                       8          =        |          ee                 oo                      -  |
                         |    ~     z       i                     1       BA           ,     o       —==         co |
        4              pf                           q                BBs                          Bas              1
   i                                ne                          PLS                             L
   |    i                    SEEtsicteset   «OCN                   ls  ———                                         j

                         |  | [>-— |                           ea)           a                 ke}
       }     ~~               be                                0       ha                             :
             i            or            ee               _
       | _| JF                 =§ yee                                                              oe

              £                                                           pe
   i          2                                                         . -
             is                                                      Ks
                                     :       os cea SR I                    AUMAnian      mame ALS Ds ae             ee
   :   ,                                                 oy    :  —_—p    hee SUNSHINE BEACH  BeBe                    Taare pete stat
          ~                            2

                                                                              Page 45 of 139

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 46 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                   18 AUGUST 2015

                                ‘ee    _                                       te WAN          ‘
      +} eee                             ____§_+—                                       oo              -    ot
                        fe            Ye               -b-—,                  ~—                                 a
     2             YT > ap                                                                                        &
   mt               28                                 | Eo                             pO                        $
                    my   ||         .                  a                                i
   |                *}  |                    _        i  EC     en                      Co          |   ‘
                     an                        g      |                                   .          |
   —                bd  |                .     3       rt — =|
      of               J                       ‘         + ei                                        |
   |                |              .                     toy   ees                                   |
   P|                   |                                   oS       |                               |
      |                                                       St     |                               |
      |                 |                              — aie                                —
   /  |                 ,                                 5 S                                        |
      |                 |                               EE                                          st
     4]                  |                              fey.                       To
   g                      Le          7 Te      "    —     j
   (ht                                                                          Sg   ee                     oe
             =                                            t     —.-             —
             2                                            Ry             ,       ”
             =                                                   -
   ro        2                  |      =e            ID nn 2A enn                   RSIS SE
             7                     S anne            ag     CaM FINNEY        eepasisnen —_         oi Sa

                                                                     Page 46 of 139

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 47 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA         18 AUGUST 2015

    |    |          Lp {                        ,        _                                       -
                                   i  & £>
                                      i
      |                                                   1    2     | 3       “       ~
    a                 oe           _                  SS                        gr
      4              OT                      |    prt                         ee E
                                                  |    ae          2         AE    |
   |                  :                               MITTS og” FL          pga pd
   :                  |                  5      |      Pet Aer                          -
   |                  |                  S|          tee Oe a S|                   BYE
                      |                         |           eet Oot         ope]  EA
                                                |     Hew aS      SF og       LIN
   |                  |                         |     ry            si of Bo        —
                      !                         {         ff   eo   s     Oo  T :    5
                      |                         t    a PS        |  t         | g |   |

  ,                 ee es                                   7     K a           Ln

               Q                                                                    eS
   |           a                                     K    =   |                     ©
                      .                             |                               §
               m                                                                     .
          ——. Ss               ) tani      “fabs                  ee
    Ss             =            a             =        -         =                      |
     a                               oO                  ~ Page 470f139         |            -      |

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 48 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA              18 AUGUST 2015

   E                   |                           |

     |        |      —————_—_—_—                              PAT tesa @ ga TTT         | Tg    gh)
     |:                                                                           :       po
     |               |                           |        =              pers             4     a a
     |               |               ———           |      Fee           TN       lm
     |               |                     &       {    ‘  w= eens    i 2) &y        aus  STN       Te
     ll.                                   5               sstpeatiie’       | 3)           ig   Hl
   PA                                              |          q.   [/b -4en 3         He peed y
                     |                            Fles*y      fo   o7     EAS         oe
   Es                                             #)            ae SS                            bP
                  :  So                ——    ee       a>                   - rT           (          |
   ee  |                                              = 5                ,  = | |                      ,
   =|!          mo a                                    -                                can           cu
     |          e a                                     75. teeenmernneagy . i ge        e532     \    fy
                  8       |    _      |                ti 35-            zr              y        ag
                  o            =                       3 ||              3 it               4 eeae %
                                                       sae               a                      elu 8
                                                       Wi} r             ™ {                pER eos c
                                                            ni            |                 5 Rao § 3
        Se a                         an                                                   eg! 28 he  .
             ee             i          sense ec TR RE           aoe same SSeS             ag? st 3|%
          game              om   Pm FINNEY        mb 828 cera            EE ntl           suk re
   f    . 6 omer     |  ee           eo eA       : EPRI     F: 3292 1055 PTT                &        >
                                                                Page 48 of 139

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 49 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              18 AUGUST 2015

      —        pesca shin rt ERE CEC TREN HE EEE THR I OT, NO rarer veneration rn  me A La       —w   Pe =      -                     —_?
                            OL cp Co Sa :
        !                   |                                         a                   Ee Da
                            |                                   |                 4   .      : \ 4 “ = He —     2 TO + +
                                                                         é     \          i  wo “2     ele ae   A.   /§ |   4
                            i                         =              a            gf. aye           kk " may U, —#$      &   \
                            _                                   |              i            tee       gs ; € S (a5                  :
                           :                                    {                 '               i:  “|           ity
                            j                                                   ‘1                Ss  poet ID        io       |
        |                   |                                   |        gS                     Say ey
                                                                                        <—        ae  (wy i=       Ry
          :                 j      .                            |        | “t  a i            ~~ “4  Pa yy : — . _ 1
    “                                                                       Bo                       a  re
        |                                                       |  .     7                 ve fo * =f ¥           al

        i              a                                               .
                       :                              a
                       2                                 KA           ne      |                 3      &
                       g                           (><)                 s                     13g                                   |
                                                   \       Sy         | 4                     | A      e
      |                                                —                      l.                       °
     » | Y . crenirg rote ieee             TENS)              FECL      F! 3392 1055  Cece "                           ,
                                                                                Page 49 of 139

Section 50

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 50 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015

    $  SN                                                                                                                              f
    i     ™~
              ™~,
                om
    Rn              SN        _     Na “powers  _                                                                                     ,
          —preannmet  i                 —_
    fe                             [ae                          So
       Bes      pe                 eo                            ee
      -          pene   eee    LUE OA III            j  Soe,                  .
            ‘aan                   Poe           a                                  8M ORIGINAL GROUND LINE
         SX    | al 5 ENSUITE     +)   MBED       Po           i.                   AT SECTION CUT
    ;      Ree   He      pO. | ;      ‘     a           SA               ~~                     |                             ‘
      dean              ye |           jo              PRY                   ~~                 OL.
    i   Ee anne Leet     aah BAe in Ae tint rea             {  :                           ~ NY wee          .
    I           | a                                      +       =       ‘                                  ee   mK
       |         ot        west     F-aiien   *       anesio oT                      Lo                                   a
       |                  Q         lt | me                 ey | ee     |   CA      Pes                                              —
      Pet                  at       Fl              ey)                      ee
       Te           Oe                   =                 or                          ae
       |    BAG MAIS       {Baynes Sem                   i |   Od} Co                         SR
       {    FETRMME Vtnns a                    .         } ee         ee                                 —}
    yo                                       brwt)       SR                                                 mT
            Bro Seen,                                 POS
                                              |       ;  i       im                                              ‘
    Po                                        Nae                   DAY BED DECK     OO                     ase     B+
       |                                      Eugten ,                      '                 a                =
    a                                         poe                     ST                            Taig |
    8 em                                                                     =     =                f Lo                        mm gen    Lf
     ,        SECTION A A                                                                                                                  vt
             fore he Lens                                                             ‘
           — Yote   ave
    '         pen POs
               Wauyiis AIO ASSOC
              “BS Sheiq=Otun
               Survirejers

                  ale AS SHOWN © daw rinse Se s >  2      te     menses: ES                    he a
                  =     a of   re      =—_—_pam re OA MINE BEACH      &  Bas 4                  gue st“                              .
            g° perener ooT9    _            Ce      FINNEY       serene                       EE ibaa

                                                                                   Page 50 of 139

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 51 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                   18 AUGUST 2015

                ccna          .    a                gna fo                                                a
           wall Kb cin ane penned i  BEAUMARIS, . wnarnenes GABF 1G       Se ewe tent
          age FS dove FS Se eS      ~ CONSMINE BEACH c abe! * —       -— EE SS               .       - “
         a                      2s                                          nas                    — Raawment
                                                .                      —                    2          M Boss
                                                                          GRE Sone       a
                                                         [Zev                      | =      Tt lh      v       |
    ,                                      uptown,              twee        TAIL        Gy) | ak ae
                                                                                         Ti   iii              |
                                           ain                           ETE                      ae
                                          8M ORIGNALGROUND LINE ~ _       .       ie    YOUU           Lee
   A                                       ATBULDING LINE  ee   TATTLE Te       wwe        Tih |
     uibnvnenk  |                                —_             a HHT]    i eee           =m ->       :
                                   __        —                 FATT UT           SR) TS         |  oe Teg
   |                       oo                                  BAAN eS                     we     fe
   Dee                                      AS                    NTR HH        yore                 hee       |
   toe                      .                                <i HI Hie                  ey           rer
                                        BLAS              eae ii il  | Hil Ses}                |            eee |
                    |        |                    |             UM                      Ly                we
     PemMatE 4e€                    _    et FLATS            ~  ‘ sh? :    Pe              jo                  |  i
   —                         Cr                  . Fae                   .                                     |
     . Fushi        —              |     To          Hu         ~
   L    i                  je                      =|           Rotem            ATBUILDINGLNE          beteammert
            (                   ee                              =~               SMORIGINAL GROUND LINE
     20               a              a,                  .     tae    |     °                    s     és
   PO     a                .        ;  4 NGL AT ALIGNMENT ~ eee K—  a           a               SAS       —-  4o
   (NORTHWEST ELEVATION                  ene                                      _
                                                              |          Pa        eA       kK Be
                         ‘                                                      FT Ne           wWeETP  =
                                                              |             PETTITT]            dime     =
                                                        .     |              eA                 Pree banca
       .                                                               (Cm ERY LD
                                                              SOUTHWEST — NGL AT BUILDING “Engrs :
                                                              ELEVATION UNE                eae
                                                                     Page 51 of 139

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 52 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA              18 AUGUST 2015

         NN
                NN
        Away F    _
     F       —— lia          Ts Teac sean                                                 .
                   4  ™~           .
        seme         iif        nce            Liter,                                ;
     =       AT     | 1 |   SHU            ~           es Bene
     PLDT                        i Pali}                         mma ee                |
                       |       AVE MIAV eS          c
      se        eg A                           yt                                                |

   _ see GR             ME             TTT                        a                            Oy
                      a ~- STt        ‘ #     :        .      i      oT    7                   Puunment &- >
                                        5 ORES      2S |    | XISTING FLATS ee

      a                                         }  { Die $0 Dee                           |

   :       SOUTHEAST ELEVATION                                   Fat awe           |                       ,

    |       i     I        RY         sito, ER                   ES                                    :
        ee
      1©. ctanieg rater beeen      Lene a           ;       2 105                              .

                                                                Page 52 of 139

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 53 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                           18 AUGUST 2015

                                                                                                                                                              ATTACHMENT 2
                                                   ot ningnk
         Aausnorert                               e
                 '         nh   a               “5                 CALCULATION DETAILS OF CAMERA POSITIONING
                     e      ith  I                                 HEIGHT OF FASCIA FROM DETAIL SURVEY 49.65
                 |        ppt YH      I      %    NEMA             PLUS EYE HEIGHT       450
                           i   4                                   ILESS DISTANCE TO BALCONY FLOOR: 240
                 |        [ge pe      tower 1)     an              CAMERA HEIGHT USED:   4875
                         Thi    Tm — pe            =                                                                                    IREFER TO SHEET 9011 FOR 3D IMAGES
            wm           Ha                UP ods      OE
                      eae Lee
            see» fo                       A Se ee                                          :
            eo ee V4    LTTE       H ne:     T rok     yO
                  pe ill        ROPE GE      i
                 (AST               OE        Vices
          avrorpr OP" oT        IER RL Ge      On}       |
         (al             roe! LANL               ew                                 I
            STi                   amninr.                =                            SS
                                                 i aa       |
       a             fF laid ZED,     gam        |          |                                     5
           wn                               |       |e      |                       ata Tie                                                [Gamera Settings
                 |   ML AUS I                    | ,exetll  |                        Cf  1                 EE
            -             Vy       peer”           z                          _—              eS             |                                                  Selected: 1 Editable: 1
                             ELLA) | sie, A       =         |                  SS   Le Pen]                  |                              New...)        (R         hin
                           —_           —                                           oie               =                                        jew...       ename         elete
                 [Meee                   ge                                   ion ica      ne
             ~~           _                                 me                ill aE: messy —                            A                      00 Presentation 01           :
                               .               -                                bn      Cr yc            ——                                 —<—¥—¥€_<s—«X—¥X—X—K¥—s—¥X—«x—¥€E=<—SSS—[—SL=a==-.
                NORTHEAST ELEVATION              | .        |                 5 Ma       oe              —     :                             Camera:|1 | (3) Wait here: [0 _ |frames
                WZA~ feos                .                  |                 Ht Be                   iad                   -                      Smooth Path at Cameras
                                                                                ia Pa            TTS     UA                                      ——$<$<—— $$$
         |            ee.                                   i                 Ee          ea                          ‘T
       :                                         z          |                     oO  ia Poet. te                                           e Camera Z            Oy largetZ
        ELEVATION - DWG DA-01                                                 TE         a le CULT T     L        esting STRUCTURE              1 [as7s00 + +| *    | [as7500   |]
                                                            |                   Sy    hats            | ||                                  Po                  eee)
                                                                              WE ol I § <4 3 HH                  ©                       =a oe
                                                            —                 fF RS ty                                        ma            ke                    Qa
                                                               ma               —          PRR                                BACON           i [37717]         ge [382
                                                            |                         eS             [ea                   IM                     View Cone           Roll Angle
                                                            |                          Be            —                   é  |               m<Koor          | o<® foo —*'«|
                                                                                 =  = +t               ca f}
                                                            |                                                         Paral                   (Xe Sun Altitude    36 Sun Azimuth
                                                            |                                                          I    ||"             LE, [26.1°        | @.% [350.0°
                                                            |       [we
                                                            |                              =                           |
                                                                                           o                —         |                       Path...               ®los |{ | m|
                                                            }          fll
                                                                                                        ft                                  —_——
                                                                                                                      |
                                                            |                                         /               |                     C  sun.)
                                                            |                                     a                  |
                                                                                                                     |
                                                            |               l                     7         |        |
                                                            ?                                                       /
                                                            |                        ee                             |
                                                                                    4                               L
                                                            |               wae                                    [Noms
                                                            |                   ’
                                                             PLAN       iv                                                                                                   : =
          sete 4,12, @ AS Ht" 1018/2015 ——              pectecs Fe claee bone   ala                                          mm, tet    VIEWS                            PRELIMINARY
        ronmter 8079/13                om       Pg RICHARD FINNEY               sscesctneeeensnimenees                       EEX Mitis: | NEIGHBOURING PERSPECTIVE
          design FAS drawn Ts,                                                                                                isbane qld =                               Doms vcaeibe towing
      drawing number VIEW 4                            ROBIN SPENCER ARCHITECTS PTY. LTD IP: 3392 1066 F: 3392 1055     Scorer

                                                                                                              Page 53 of 139

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 54 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                           18 AUGUST 2015

                                                                                                                      REFER TO SHEET 9010 FOR PERSPECTIVE CALCULATIONS
                   —"                             a
                               ail                cage #

            PHOTOGRAPH FROM NEIGHBOURING DECK AS SUPPLIED BY OTHERS

                                                                         :

                                                                                               s        —                                          7
                                                                         |                       =
            RENDER TAKEN FROM SURVEYED LEVELS OF NEIGHBOURING DECK                                    nhs          ——                                      }
            REFER TO DWG 9010                                                                          Yi                                          =
                                                                                                          a          ad
                                                                                                                      a

                                                                                    SUPERIMPOSED VIEW FROM NEIGHBOURING DECK AFTER NEW CONSTRUCTION                  ——

        = 6 AS     oan       j            ——                eo eeee           tone         es                                              ee ~ VIEWS                                        PRELIMINARY “
      crores                                        Pen     cien: RICHARD FINNEY        areeenenieeee                                      Sen o,tm,a@ | NEIGHBOURING PERSPECTIVE
   drawing number VIEW 2                                    ROBIN SPENCER ARCHITECTS PTY. LTD. IP: 3392 1066   F: 3392 1055          SERCO          ene

                                                                                                                               Page 54 of 139

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                18 AUGUST 2015



5                        PROPOSED EXPENDITURE OF KOALA OFFSET CONTRIBUTION - SETTLERS
                         COVE
DOCUMENT INFORM AT ION




Author                              Environment Officer, Conor Neville
                                    Planning & Infrastructure Department

Index                               ECM/Application/132008.176 (08/0176)

Attachments                         1.    Koala Offset Settlers Cove


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by the Environment Officer to the Planning & Organisation
Committee Meeting dated 18 August 2015 and;
A.                       Approve the planting and maintenance of 300 koala habitat trees in the Girraween
                         Nature Refuge using the koala offset financial contribution paid by CBD Settlers Cove
                         Pty Ltd pursuant to Offsets for Net Gain of Koala Habitat in SEQ; and
B.                       Approve the remaining koala habitat offset contribution paid by CBD Settlers Cove Pty
                         Ltd to be expended in accordance with Option 1 as outlined in the report.



REPORT
The purpose of this report is to provide information regarding the proposed expenditure of
the koala offset financial contribution paid by CBD Settlers Cove Pty Ltd to meet their
statutory obligations under the State government’s previous koala policy Offsets for Net Gain
of Koala Habitat in SEQ. The contribution was required to be paid as a condition of a
development approval for a resort development of 109 dwelling units and 90 accommodation
units at Settlers Cove. The development was approved by Sunshine Coast Regional
Council on 8 April 2010 with the relevant period subsequently extended in 2013 to April
2017. The condition requires a monetary contribution to be paid to offset the removal of 48
mature koala habitat trees which would be impacted by the approved development and was
imposed pursuant to the requirements of the Offsets for Net Gain of Koala Habitat in SEQ.
106. A monetary contribution of $44,160 ($920 x 48 trees) must be made to Council for the
     off-set of 48 koala habitat trees in accordance with the Policy for Offsets for New Gain
     of Koala Habitat in South East Queensland. The monetary contribution must be paid
     within 12 months of this approval taking effect pursuant to the Offsets for Net Gain of
     Koala Habitat in South East Queensland
The Offset for Net Gain of Koala Habitat in SEQ provided the option of paying $920 per
mature koala habitat tree required to be removed to facilitate the development as a koala
offset. This financial option includes the cost of acquiring land outside the urban footprint in
South East Queensland.

1.                       Koala Habitat Offset Site Investigations
The Offsets for Net Gain of Koala Habitat in SEQ policy net gain objective is said to be met if
an offset contributes the equivalent of five new koala habitat trees for every non-juvenile
koala habitat tree removed. The policy requires the offset to be provided in an area identified


                                                                                                   Page 55 of 139

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015


as high value or medium value suitable for rehabilitation habitat on the regulatory maps. All
offset plantings are required to be permanently secured for conservation purposes.
A total of 300 new koala habitat trees are proposed to be planted to meet the required 5:1
offset ratio for each tree cleared. This also includes approximately 20% extra planting
contingency to account for potential tree failures.
The land surrounding the Settlers Cove resort site was investigated for the purpose of
providing the offsets as close as possible to where the koala habitat is to be cleared. This
area was determined to be unsuitable as there is insufficient area to plant 300 koala trees
and the current land tenure does not provide suitable conservation protection. It is also
preferable to ensure koala habitat trees immediately adjacent to the area of impact are
protected and retained with the additional provision of successional koala habitat trees by
planting. However, the area around the Settlers Cove development could not successfully
accommodate the required planting due to the previously mentioned constraints.
The closest and most suitable offset planting site has been identified in Girraween Nature
Refuge (Attachment 1). The selection of the site has been made in consultation with
Environmental Services and the Natural Areas team and is located east of the sewerage
treatment plant. The site is used by koalas and the proposed plantings will augment and
expand upon existing koala habitat as well as providing additional biodiversity values. The
Girraween Nature Refuge is a legally secured site by virtue of its Nature Refuge status under
the Nature Conservation Act 1992 and the provision of koala habitat trees aligns with the
management intent of the refuge.
The proposed planting area meets the requirements of the State’s Offsets for Net Gain of
Koala Habitat in SEQ policy. The proposed plantings are in an area identified as medium
value suitable for rehabilitation habitat on the regulatory maps, provide a minimum offset
ratio of 5:1 and the land is legally secured by virtue of its Nature Refuge status.
The planting of koala habitat also accords with the recently adopted Council Policy Koala
Conservation by identifying public land suitable for offsets and through the protection and
conservation of koala populations and habitat.

2.   Koala Habitat Offset Site Costing
The Natural Areas team has obtained an estimate of the costs associated with the provision
of the koala offset plantings, which include the site preparation, planting and a 5 year
maintenance period. The estimate is $30,000 which averages out to $100/tree.
A residual amount of approximately $14,000 remains, noting the $920/tree offset contribution
amount includes a land cost component. A number of options are available to Council which
can be used to advance koala conservation in the shire. These options include, but are not
limited to;
1.   Increasing the amount of tree plantings in the Girraween Nature Refuge by 140 trees
     and maintaining them for a minimum period of 5 years; or
2.   Implementing an enhanced program of bushland rehabilitation on public lands that
     surround the impact site, Serenity Close, Noosa Heads to ensure continued availability
     of Koala food trees through weed control and supplementary plantings; or
3.   Engaging a researcher to assess the health of the koala population(s) of Noosa
     Heads/Weyba Creek; or
4.   Improving koala road crossing safety by addressing koala mortality hotspots through
     the provision of additional fencing, speed reduction, and/or provision of koala furniture
     to culverts.




                                                                                  Page 56 of 139

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  18 AUGUST 2015


The provision of the additional trees and funds to the Girraween Nature Refuge area
(Option 1) is recommended as this increases the amount of available koala habitat area,
provides additional biodiversity values to the Nature Refuge Area, reduces general
maintenance costs of the area over time, and reduces weed mass and spread.
The planting of the koala offset habitat trees is proposed to commence in the 2015 growing
season (spring-summer) subject to Council approval.
Previous Council Consideration
Ordinary Meeting 2 July 2015, Item 2, Page 5
That Council note the report by the Environment Officer to the Planning & Organisation
Committee Meeting dated 23 June 2015 and;
A.      Note the Department of Transport and Main Road’s agreement to enter into
        discussions with Noosa Council in regard to finding a suitable koala habitat offset
        location within Noosa Shire and request staff to investigate suitable offset locations
        and report the matter back to a future Council meeting; and
B.      Request the Environmental staff:
        1.     Identify potential Strategic Offset Investment Corridors in Noosa Shire for
               inclusion into the new planning scheme;
        2.     Develop a register of landholder interest;
        3.     Investigate options for securing land for the purpose of providing advanced
               offsets in conjunction with the Environment Levy Working Group;
        4.     Investigate incorporating Matters of Local Environmental Significance into the
               new planning scheme; and
        5.     Present recommendations to a future meeting of Council.
Finance & Risk
This report considers the expenditure of koala offset funds in line with the original policy
intent. The offset plantings are fully funded by the development approval condition. There
are no other risks associated with the koala offset plantings.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Natural Areas, Planning, Environmental Health and Environmental Services.
Departments/Sections Consulted:

x     Community Services                      x   Planning & Infrastructure
      Disaster Management & Public Order          Building & Plumbing Services
x     Waste & Environmental Health                DA Planning
      Community Facilities                        Strategic Land Use Planning
      Cultural Facilities                         Asset Design & Investigations
                                                  Asset Planning
                                              x   Civil Operations
                                                  Environment
                                              x
      Executive Office                        x   Corporate Services
      Community Engagement                    x   Finance
      Customer Service                            ICT
      Executive Support                           Procurement & Fleet
      Governance                                  Property & Facilities
      Human Resources                             Revenue Services




                                                                                    Page 57 of 139

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015     ATTACHMENT 1




                                                     Page 58 of 139

-
  KE
 =
               a                                          ger       tn te HEN
                                                      i     <5,  foe.    3     RS     are                                        e    —,
               Jae                                    thee oe                   eee
                                                    ead BO: / ae eos         i  SS  “~ b     i   = ts               ae        .
                                                       8 nd Shy oD     Ree . Sey.            < ote  fog Te
                                                       ce  Hii      Ore Ae ee         ;    Ln
                                                        Hida   a     ey SE
               z   o   2                                 Ry    Pate    4 ast iy ee        Aas             es atts  rea    a {          ’
 =             ®   S                                        es   on
                                                     °F Ne ase      a ae Ae Ne RS 3                         es                    ome
                                                     ae a, rth whe      '  Ns Pd:       Oe ie et PS
                                                     ee Seay      Pee A       yt   °  Se Reh ais        ae
                                                     =e  3 ry: ery ats a          Raat OP      es. er              ahs
 Ee                                                   tae        ey Sy      os 52     XS       .
  xq                wo                              -     ys vas ay’     4 Se"         ees as bf   %          :   EL     yee
 <=                                                        a,       eS watae   a         es               as     77    4    4 Pt  ae
 lo                                                           cathe        ROE        ot y             eS SERS “           LS    Be
 E                 2 8            ;                           e      aire    Seer       ae               YF   Pe Cc       av at         |
 r                                                         y ro   as. 8  Meer Om        :         « ae Pos Ree one           Rear
 =)                                                        ae         Pe es SZ                  oy Ea       &:   RS Rah 4
 N                                                          er   Abe        cars           ett. eee           BOE       eee
 -                                                        Bie                   a      pies RO Re
  wn                                                    ‘             oo    7 a] a          mata       iT SaaS      “     th RP a
 a                                                         .   5    be       Es é            Fj    by poet Cb   s  ae   ys: " rte
                                                                            es            7   Bt i        papery ree      ge ng em
 2)                     e                                          r       se or              cryy     Lia           aren E
 z                       =                                            "    7                        Tigh Ba a SEG Re ate Pa3
                          BS                                         eS                A    EPOX:     om   baad   Ya        Pn)      ,  |
                        e)                                    .     a     pe: ae ae                 Ot te Psit:   nats  ooh = inate i)
                          J                                                                                Fi        ee     ay      1
                          =                                            -      > a     *        2,           az  x       Db  3   fe
 sad                      F3   ,                                         =     7       a    Pid cea =         i    kena    ‘  . aOR
                          eo                     |                         _              ie! ae                   Cee      Kotte       |
                     A      o                                        -    4                     ys  v4               eri    tS     ae   |
              ee es Ts solid                     '                        s     4    &        .  eh          < og     ed      rae       a
                          }     =   Y                                            >            9 -"s y            .       Me   L    ry   |
            =     ee rest   FE      Rul          t                                   Pik          a                       npr    iis
               as aes Pay 3        a Pa                                                ey                 :                     SEE
            é       7    Cer   se        a                                                 oy                    F                |
             ey ies " tev.     yes  oS Ae                                                                     ee                   8
            =   Pts ha     ae cy a     en   Pa                                                                 *                        |
              an     ee! 1s 3 ee             oe                                             :                    ‘
 S|         ee                         ae                                                                                                   g
               ~ SH    i) j Wd, oe    ry F; df ip                                                      —#         ¥
              fits Py So              a            ah hl                                               nN                     :             -
 <          Hie                 ¥      "    ee    hy     ot                                             ‘                                   =
 6          tr oe     = = ee :      ¥  A mw     Ne     rf eens                                           N                                   O°
            was               aN      ‘  Ae        XS PoE es vie                                      2   x         *                       ©
 z             sais   y  rad     a er.          n   +   ( #2 Ar    LAPP        BE                          we         y                     i
              Al.       i  at  ped                    Cah je Eek       Be   Reha          Sata         F      B=)                            ®
 Lu         a=          S  Pies                         Ais Ses Sie! noe me               eee       ye       yar    il                       D
  Ww        a        ‘  F { ms                           ad ati     ia EM Fase =          pe Fa               ,  D   <d   e                  ©
 =            ee          :  rae                        ay     ory          cs    Oy      18s                                               a.
 -         Re         fis     Pi, Ay  og             east    Aa    Se  Se tof             pe                 NS
             os       * eS eye         ho
 <=         aw      ra     ne “ee   “   it Be LP
             ss Paes         ae  -         ey,   5
            og           Othe   cy     te        s  ‘
 wi          Le                    ;        &          ee, ie) AUS pi           nig    met      .       y       ‘
 Ss                                                as     x if Oe Pune w  Peal   :  ste      \                        |               Z
               Me                   by        mt Foon          owe rtd      et be  Py ce         ~
                                                    Q   Pics = a   Pi ny    Cn > tee C3 =       J                  Re                Z
  oO                                                 oe a Opens en KL)    aa    BY: $e  re     !                    ee             ff
Lu             Ss                    oy        are       es ay.       Het hide LI? <*
 Ee                od                  AGE     EE  ie are  a9 eee ts        eT      RAS
 O              o                                 cis en ssh,         ee  tt   Che  a     hee   :                      x    P
           '    >                                 .s J   Wen   Bell Pak f Re Pied Pen        ei                         ;          .
 E                                       aon LP        pen   yf    ) aria    Peas se
 =                                     Ee     ie      Pye       te    Saye     7 Eee,
                                            :      +    Pade  % c) * Lae es      > | Aas 1 Ps
                                          ts   et      9 ee  ig x       ib) a4 oI  ee ut
            i                                     >   ee, nat       Pants     ¥   32   mahd, ae |                     S
 za                                                      mie      Nah St   neh      iyte fated                          i
 Oo         .            Ky ret                            Hee       Saree fo    phe HAS                                  A   et
 -          !            & ay    MPs                        2 Site xy =     ote      el 4°"                           |    ns ay
                           -   Lh? bf                                     =  Fei        ne .           -              a bed   Tr
  xq       g              ble     o                                     ‘     +e oon                   Ry             pom    e,
 =                                              3                 ? cy 4
                            ,                           Soe        Se   Seta     ra         aes
 O                            LET    :                                      i   ]          He Pea      ar   :         :               y
                            ,      ro i                                                                ae .
fc                         ne   Prato                                                    eked    eee      ae                   2     —
                            A   613 a                                                pd   %   or jac               ;
  oO                        etre iN oo                             ;                      pee aoe            re                     hg
                         i      et   .                                                      FE vn  aS     ir                ‘hk     P
 3                        “f     cet                                               *. PA          ae
 o&                      ie         pass                                                    ves oon ao                                 ;
                                URe¥a Se.                                                           outs at
                          saree Kp                                                              mt     ere.             ,
                         H       met                                                       a   “ae
                            iS       i                         ,                             ie    roe     da                      “
 zZ                      rat        ue                                                          Pay PS                       .       at
 O                          43 or  Spe                                                      z     eee     ee      .
 Z                       ee!                                               8                  ae       Tee         %          joes
 za             oO       =a  Po                                                                Mh  load b Sie r     Be      ith >  .
 —                        ‘s ae      Poe                                                     es       eS (‘e* on   4
               =         SY oe ae                                   é     ‘6                     ak     core       pag      ieey
 <q             ef                                                                                          att    A, as    he
 a |            O        Q mee                                            i   oe      :                 rae       oe  ne  +  > a
 a             \ 4        RS    }                                         ay                          A         {    iy ee: A oy Ce:
                         “5 mS ’                                          é   es                     al ye      \;   mat? ue    i Arr
                         au                     “                        fees, ot                     5  atid    peony Pe Aor
                            e,                 ~                          :                           vores       ne   See      ae
                          See                                             hae                             E          RAR me
                             e                    =                        by                            oh.          Ss      ae   RD
                           os                         —                  LaF evince      :              a                     eo
                                           .                              =   ms Fire |   ‘               ry           z      emt     oi
                                                                          =     ~ (ae ve                                 ea            i
                                                                        v1 5 ig    Py ps                               ,    s
                                                                      :  gee     i   a <y                               ah).          ,
                                                                       , bl iM oth)      ae,                            ao"     Com   "
                                                                     ars      ~) cae  2   ,                 /       I       j rE}      I
                                                                    - PLP rr)   py Pat cr bd                |       4     Feat os Ee, 7 Lys
                                                                  ON     a Pee me Sa es                    /                Ter      ge:
                                                                            Mb ae be - ce                 /                     ®
                                                                                   Pretts   -  3         y                      2
                                                                                            hoe                              ae
                                                                                                      if                        ~~,   a
                                                                                                       f                         3    7
                                                                                                                               os     =e
                                                                                                                             ay       Sy
                                                                                                                                Oy 3

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                 18 AUGUST 2015


6                        SURVEY & REGISTER OF NOOSAVILLE INDUSTRIAL AREA BUSINESSES
DOCUMENT INFORM AT ION




Author                              Manager, Planning & Environment, Kerri Coyle
                                    Department of Planning & Infrastructure

Index                               ECM/Subject/Industrial Zone Survey/Audit (Noosaville)

Attachments                         1.    Summary of Survey Results
                                    2.    Map of Noosaville Industrial Businesses

EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by the Manager, Planning & Environment to the Planning &
Organisation Committee Meeting dated 18 August 2015 and
A.                       Use the results of the survey of the Noosaville Industrial area to inform decisions on
                         industrial and broader business land allocation and mix of uses in the next planning
                         scheme; and
B.                       Request officers to regularly monitor the area to ensure that any new businesses are
                         compliant with the industrial zoning.


REPORT
A survey was undertaken of all Noosaville industrial area businesses during May and June
this year. The audit was undertaken for a number of reasons:

                       To develop a register of existing businesses in the industrial area, with the register
                         intended to assist in monitoring the area to ensure that any new businesses are
                         compliant with the industrial zoning;
                       To provide information to owners and tenants on the purpose of the industrial area as
                         the number of non-industrial businesses that had established in the industrial area
                         without approval was thought to have increased; and
                       To provide useful background data for future planning purposes, including the
                         development of a new planning scheme for Noosa Shire.

The Noosaville Industrial estate is Noosa’s principle industrial centre and the only industrial
area in the coastal part of the Shire. The Noosa Plan seeks to protect the area for industrial
functions to the exclusion of incompatible uses including residential, community, commercial
business, retail business and most sport and recreation uses. The area provides important
industries and service-related businesses to the whole of Noosa, but particularly the coastal
area of the Shire.

The Noosa Plan defines industrial business as follows:

Industrial business means the conduct of an industrial business activity, where goods or
products are produced, manufactured, dismantled, altered, repacked, repaired or stored at a
scale greater than defined by retail business. Any space dedicated for administration or
accounting work in connection with such operations does not exceed 20% of the use area.




                                                                                                   Page 59 of 139

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 18 AUGUST 2015


The establishment of retail or commercial office type business in the Noosaville industrial
area has the potential to reduce the availability of industrial land for industrial uses and
detract from the role of the business centres over time. It is important that sufficient land is
maintained for industrial businesses as uses of an industrial nature generally require larger
floor plates that are generally not able to be accommodated in the business centres. Many
industrial uses are also generally not compatible with other business uses due to their
potential to impact on the users of surrounding premises, and conflicts can arise when
industrial uses are located adjacent other business uses such as commercial business
offices. For example a medical or solicitor’s office requires generally a quiet business
address and their operations are likely to be impacted upon by a mechanic working on
vehicles next door.

Prior to undertaking the survey all owners and local real estate agents were sent a letter
advising of the proposed survey and its purpose. Property owners were reminded that they
are responsible for ensuring that any leases are for uses that are consistent with the
planning scheme. Local real estate agents were sent a similar letter reminding them of their
responsibilities in offering properties for sale or lease. The letters included information on
the purpose of the Noosaville Industrial area and the definition of an industrial business.
Owners and real estate agents were also advised that once the audit was completed any
new businesses established after that time found to be non-compliant, and therefore
unlawful, would face action by Council to remedy the breach of The Noosa Plan.

An officer then undertook a site inspection of each business in the Noosaville Industrial area
to determine whether the business operations constituted an industrial business or was
otherwise defined by The Noosa Plan. As provided to the owners and real estate agents,
similar information was provided to the operators, including the range of planning scheme
definitions for industrial, retail and commercial businesses and zoning details for the area.

From these inspections a register has been developed identifying each business operating in
the Noosaville industrial estate. The register records each business name, the type of
operation currently being conducted, contact details of the operators, and identifies whether
the business has an appropriate development approval or not, date inspected etc.

In the future, it is proposed on a 6 monthly basis to review the Noosaville industrial area and
identify any new non-compliant businesses and request either that they make application for
a development approval or relocate within a reasonable time frame.

The survey showed that of the 632 tenancies in the Noosaville industrial area, there are
currently 89 tenancies (14%) not complying, some of which have been operating in the area
for some time. There were 100 vacant tenancies at the time of the survey. Many of the non-
industrial uses are concentrated in areas along Gateway Drive, Eumundi Noosa Road and
Eenie Creek Road. Some of the non-industrial business uses established such as the
showroom type uses along Eumundi Noosa Road have established there due to the
requirements for larger floor plates, to attract passing trade and are both retail and
warehouse in nature and so are not necessarily suited to the existing business centres.
Other uses, such as along Gateway Drive, appear to be start up type businesses, many of
which may be more suited to this area than the current uses intended by the area’s industrial
zoning given the adjoining residential housing. There are also a limited number of small retail
type businesses which have established in the industrial area, in tenancies with very limited
floor plates. A number of these tenancies given their small floor plate are unlikely to be
suitable for many industrial type businesses.




                                                                                    Page 60 of 139

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 18 AUGUST 2015


This information is likely to be useful in informing land use decisions for the next planning
scheme and until this review is undertaken any further breach action against existing
unlawful businesses established prior to the survey should be put on hold. However, the
industrial area should be regularly monitored to ensure that further businesses (not industrial
in nature) do not establish in the area in breach of The Noosa Plan.

Previous Council Consideration

Nil

Finance & Risk

The establishment of retail, commercial office type business in the Noosaville industrial area
has the potential to reduce the availability of industrial land for industrial uses and detract
from the role of the business centres over time.

Consultation

External Consultation - Community & Stakeholder

Owners and tenants of the Noosaville Industrial Estate and local real estate agents were
contacted during the time of the survey.

Internal Consultation


Departments/Sections Consulted:

      Community Services                     x   Planning & Infrastructure
      Disaster Management & Public Order         Building & Plumbing Services
      Waste & Environmental Health               DA Planning
      Community Facilities                   x   Strategic Land Use Planning
      Cultural Facilities                        Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

x     Executive Office                           Corporate Services
      Community Engagement                       Finance
      Customer Service                           ICT
      Executive Support                          Procurement & Fleet
      Governance                                 Property & Facilities
      Human Resources                            Revenue Services




                                                                                   Page 61 of 139

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 62 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             18 AUGUST 2015

                                                                                                                          ATTACHMENT 1

                       Industrial
     STREET NAMES        Use                                                                                      TOTAL
                      Compliant
      TRADERSLANE   | __14___—i||   so     0      0     0      0      0      0     o   {oo | 2 | 16 |
       PROJECTAVE =| 53d}           11     1      0     2      1      0      2     o   {aw |               8s | 2 |
      VENTURE DRIVE                 2      2      0     0      0      1      0     of         5s    | 4 | 4 |
      GATEWAY DRIVE | 42 ‘|| ‘5            1      3     0      0      0      3     o   {2 |                2% | 70 |
      EENIECREEKRD  | 4 ‘||                0      6     0      1      1      0     o   {sf io | 22 |
       RENE STREET                  9      3      1     0      a      1      0     o   {ie | tt
    commerce courT    |___31___ || 2       0      0     0      0      0      0     o   {2 | 10 | 43
     SANDERS STREET                 0      0      0     0      0      0      0     o   {of               o | 1 |
      LEOALLEYROAD =|    15 __—i||_soo     0      0     1      0      0      0     o   {1 ft 3 | is
      AcTIONSTREET  | 31 ||                0      0     0      0      0      0     o   {oo | 3 | 34
    PRODUCTIONAVENUE | 23s {|              0      1     0      0      0      0     o | 2 +X| 5                 {| 30 |
      BARTLETTROAD =| 18 —*||       1      0      0     0      0      0      0     o   {1 ft 2 | 21
   NOOSAEUMUNDIROAD}| 40 || 3              1      5     0      4      3      0     o | 2 | 9 | 6 |
   LIONEL DONOVAN DRIVE} 26 ~~ ‘||  2      0      0     0      0      0      0     o | 2 &X| 9 | 37 |
      SELKIRKDRIVE    _|__1a_—idi|_—2      0      1     1      1      0      0     o |      5 iJ|        8 | 2 |
                    | 443 [38 | 8 | iz} 4 |i] 6] s | o |                                    39     | 100 | 632 |

                                                                                Page 62 of 139

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015

                                                   ATTACHMENT 2




                                                     Page 63 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          18 AUGUST 2015
                                                                          ATTACHMENT 2
   ae                                   eee             Re               OG
                                                  pA            EE    IA, AO     MeN
        Non Compliant                                  <a ® 7 REE PT fi, Sa          -_
                      Pe  net       a                    ioe ae we 4)              ae
  aa                  Oita)                                   ae     ee OS
  ah    MN, SOON! Set           i ee     gs           IS Oe           Ng eS
  Sai ig Wi {tis Sa omy   POE he  mS Po    Bar   1D on,    ae ae ASS,    -         =  ,
  we      pens keg aed   sy PP ,              ioe OO OPN ae Oe oe           Dt   me mS
  sie        ta Bras peas.’ T TA Si   aa   Cea): Rag RU a Ra 8)  ee      Aa       te
  MAM)   Tee aren Soe    i Sears oe “owt fe ee         x oy    ay     r   eo   Pra
  ll eo  Pasig fsb eee peters ee Rp, Riot sae) Tome   SP   / —    x   Fd   .  Ar  ay fs.
  (3s YEO ae  aS          ame      ea       ARS oh ES) 4          eas,      Toy oe
  we     eal    gee       a    1 aap 3 Wy Lown      i » er Mae / Dr 5       he ee iN
  eee SSP ts eam               [ND     ae     ARTE a oe        Mk          ak a    GS
  RS  en  ee OLAPraat       NO A Atos =a        ote   ads. tf           aa iad Ams.
        re Ne cg wae Ou      a       Paw ’ la    3-8 ETN . £ f  i      2 i     Lay
       ei      eer aN         eee es |       Re         Ne eo:          Le
    ek  Ni ae VT a Ms Si        rong y=          se      VP Sr ig IS   oh     ie
     ae    Se OMS i                                  ep
  eal   bh   es  et |        seeageese ?- 2  ER aamr  RS      Ea ccs        :    SN   }
  Het)  (gy      MRR > AB > foe                            I        rag, JN
             ee     ae   a OE ae oy ae eae       r   Z   ae    a    ae oy         ek ites
             d           gaye   eS  eS     ee     i    ™  ;     he  By.             cee
  7            tS Baw                                              /  ORS
              is i a      a "0 al MY  ee       lel it | by        ba   ye a one     ¢*
             - na = Ue oe                el ae             I     3     if
              Plea     5 = Pa: “i     os eam ieee,   st)  TE   EER tite a.   1 te ee
            a eee ie                    A              es       Be Om
              sic,         nat      + 2 ee           ee    ee   Flee ike       frie
            eee ee a       ee           Sa  ee  oe ae          Pat Pw ae! Ea Aa Sm
           saa tg Cae is ime _ ed fi   ~ fear i Moos cis 3 th 1) os po hea   4 Fy ; as :
                       NCL Ae ee Wea                                        ie a,
           yr west Pe ee er oe, Fe iy     GR Pe) -- hee   pe       A    PO ey Se Se
           ee    esi    Frat   a a ee              dng #   F    Mi        es Re a
                 se ier   - S. si PRIETO  ne  EE see         ama |    te, 2 RTM seam giea ae
          Ps gave                   Be;  Sah ste Ai Ee ae phy         er aR oy
          ee         vie ee    a “a       ji bac ea  ; ee a pee          MC
            Or       eee s 4 ia        eh 4 iil                   eins
           eae aie 1 5 eae a Be ieee 7 (far.      pie |      “Ch gta   4     make:
              fea BE Os ae      hGH weal   Ree Small                ¥
               ae Me ee          a Pt          fn tee                ae
         Oe      eS   SNe      zit   lee   t      sp   Tab         BTN
           D    i> a A ioe      Ms     fei   ' TE itm eae         ;  FNS
        By ame   k 4 oy iP, ha  ah  ha z  om z ye ry   h i  i a a       ‘ s
        ageert AN    SR    Set Pre geet        zie aul     a
        ANS a tl RY               v      7      Tih Se
        = ee A   ee 3)   Sey     ee   SF   aeeo T 5 S Te   ee
        nk ney ; a Pao                   ae      ple ‘i, £88
       pd nn ot a ‘ ae ¥   i              . eP   Fite es gts
       x es Maio? \ Le i Eni               i FSi Jt t.                  .
       CES            eae                      = Shel Be
       Ce  or re Ra Be a4  ee So               ss       ea
      pS apr eee ek ee                                                      ey        8
      ERE E RS                                       |                       ,       a
 iz H      NOOSA COT INCIL                              Industrial Audit - July 2015

                                                                             Page 63 of 139

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                     18 AUGUST 2015


CORPORATE SERVICES DEPARTMENT REPORTS
Finance
7                           FINANCIAL PERFORMANCE REPORT JULY 2015
CUMENT INF ORM ATION




Author                              Manager Financial Services, Wayne Jensen
                                    Corporate Services Department

Index                               ECM / Subject / 22.09 – Monthly Exception Report

Attachments                         1.    Statement of Comprehensive Income
                                    2.    Statement of Financial Position
                                    3.    Capital Works Schedule


EXECUTIVE SUMMARY
Financial performance for July is generally in accordance with budget forecasts, with only
moderate variances in some areas, though it is difficult to draw conclusions with only one
month having passed. End of year accounting adjustments have been completed apart from
information relating to Unitywater final results, and will be reviewed by the Audit and Risk
Committee prior to presentation to Queensland Audit Office for their audit. Projects still
under construction within the capital works program will be carried forward into the 2015/16
financial year for completion, and will be the subject of a separate report to the General
Committee.

         Financial Performance Summary
                               Current                           YTD        Variance      Variance    Status
                                  YTD                          Actual            $m           YTD
                               Budget                             $m                            %
                                   $m
         Recurrent Revenue       $34.5                          $34.5              $0.0      0.0%    On track
         Recurrent Expense        $6.8                           $6.1              $0.7     10.8%    On track

         Net Capital Revenue                        $0.1          $0.1             $0.0     12.5%    On track
         Capital Expenditure                        $0.0          $0.1             $0.0        0%     Watch

Financial statements including Statement of Comprehensive Income and Statement of
Financial Position are included as attachments for information of Council.
Figure 1: Actual Performance Compared to YTD Budget
               $40
               $35
               $30
               $25
               $20
               $15
               $10
                       $5
                       $-
                                  YTD Budget ($m)                   YTD Actual ($m)

                                    Operating Revenue      Operating Expenditure




                                                                                                       Page 64 of 139

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015


RECOMMENDATION
That Council note the report by the Manager Financial Services to the Planning &
Organisation Committee Meeting dated 18 August 2015 providing the July 2015 monthly
financial performance report for the 2015/16 financial year.

REPORT
Recurrent Revenue

Council has received 40% ($34.5 million) of its recurrent revenue budget of $87.3 million as
at the end of July 2015, with the majority of income related to the first half-yearly levy of
rates and utility charges. Commentary on each recurrent revenue type is provided below:

    Rates and Levies – $30.9m (51%) of the annual budget of $60.5m has been recorded.
    Fees and Charges – Fees and charges earned ($0.9m) totals 18% of the full year
      budget. There are a number of fee areas that are marginally above budget forecasts,
      but being only one month into the financial year it is not prudent to be making any
      predictions for revised forecasts.
    Interest Received – Generally in accordance with forecast levels.
    Dividend and Tax – Dividends and the payment of tax equivalent from Unitywater are
      in line with budget forecasts.
    Other Revenue – Generally in accordance with budget predictions.
    Grants and Subsidies – Overall receipts for operational grants are in accordance with
      budgeted levels.

Figure 2: Recurrent Revenue Position by Type (Excluding Rates)
 $2
 $2
 $2
 $1                                   YTD Budget ($m)
 $1                                   YTD Actual ($m)
 $1
 $1
 $1
 $0
 $0
 $0
                                                        Other




                                                                 Grants
          Fees




                     Dividend




                                               Tax
                                Interest




Recurrent Expenditure

Operating expenditure is currently 7% of the full year budget spend. The favourable budget
variance generally relates to accounting adjustments for the end-of-year. Detailed
commentary for significant items appears below.

    Employee Costs – Actuals of $1.6m against a YTD budget of $2.1m equates to 6% of
      the full year budget. The variances can be attributed to the overlap of the pay period
      with 2014/15 financial year.


                                                                                 Page 65 of 139

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      18 AUGUST 2015


    Materials and Services – 7% of budget ($2.9m) has been expended compared to the
      budget of $3.1m. Being only 1 month into the financial year means it is too early to
      identify any specific trends in expenditure against budget.
    Finance Costs – generally in accordance with budget.
    Depreciation expenses are currently running in accordance with budget forecasts.
    Other Expenses – currently below budget, but it is too early to identify any potential
      budget adjustment.

Figure 3: Recurrent Expenditure Position by Type
 $4

 $3
                                                       YTD Budget ($m)
 $3
                                                       YTD Actual ($m)
 $2

 $2

 $1

 $1

 $0
                                       Finance Costs
                         Materials




                                                               Depreciation
           Employees




                                                                              Other




Capital Revenue and Expenses

Included in these reporting lines are cash contributions from developers ($0.1 million), plus a
minor amount from the sale of plant and equipment (not originally budgeted).

Capital Works Program

Capital expenditure (excluding commitments) is $0.1 million. It is noted that actual
expenditure has been incurred against projects carried forward from the 2014/15 program
and that budgets will only be added once approved by Council. Works scheduling is
currently being finalised and will result in detailed monthly budgets against which future
budget performance can be measured.

Detailed discussion of progress in the delivery of the capital works program is provided
periodically to the Infrastructure and Services Committee.

Cash Management and Investment Performance

Council funds are invested in accordance with the adopted Investment Policy. Total cash on
hand as at 31 July 2015 was $57.7 million. The cash balance includes funding to be carried
forward for capital projects still under construction, plus unspent funds from special rates and
levies.

Council’s investment portfolio is balanced across a number of agencies, as shown in the
graph on the left. The graph on the right shows the current risk profile using industry credit
ratings.


                                                                                        Page 66 of 139

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     18 AUGUST 2015




                  Suncorp          Bendigo                               A1                   A2
                    4%               3%                                  3%                   3%

                   NAB
                   10%
                                                                    A1+
                                                                   (Other)
                                                                    35%                A1+
               CBA
                                           QTC                                        (QTC)
               24%
                                           59%                                         59%




The actual interest revenue for the month was $122,967 with a weighted average yield of
2.62% against the industry benchmark (Bloomberg AusBond Bank Bill Index) of 2.16%.
Previous Council Consideration
Nil
Finance & Risk
Final figures as at 30 June are still to be completed, awaiting information related to the
movement in value for Council’s shareholding in Unitywater. As such, figures shown in the
Statement of Financial Position are interim only. Unexpended grants and uncompleted
capital works will be the subject of a separate report to the General Committee on 24 August
2015 for carryover into 2015/16 and there may be some changes to the budgeted operating
result as a consequence.
Draft financial statements will be presented to the Audit Committee in late August prior to
submission for Audit.

Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments/Sections Consulted:
x     Community Services                         x   Planning & Infrastructure
      Disaster Management & Public Order             Building & Plumbing Services
      Waste & Environmental Health                   DA Planning
      Community Facilities                           Strategic Land Use Planning
      Cultural Facilities                            Asset Design & Investigations
                                                     Asset Planning
                                                     Civil Operations
                                                     Environment

x     Executive Office                           x   Corporate Services
      Community Engagement                           Finance
      Customer Service                               ICT
      Executive Support                              Procurement & Fleet
      Governance                                     Property & Facilities
      Human Resources                                Revenue Services




                                                                                       Page 67 of 139

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015

                                                   ATTACHMENT 1




                                                     Page 68 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                     18 AUGUST 2015

                                                                                                        ATTACHMENT 1

Noosa Council
Statement of Comprehensive Income
For the Year Ended 30 June 2016
As at 31-Jul-2015
                                                        Current              Current
                                                         Budget              Budget              Actual            Percentage
                                                          2016                YTD                  YTD            Annual Budget
                                                            $                   $                   $                   %

Revenue
      Recurrent Revenue
      Rates, levies and charges                            60,463,174          30,896 587          30,878,216                51%
      Fees and charges                                      4,807,279             831,011             851,253                 18%
      Dividend income                                       1,925,140                   -                    -                 0%
      Interest received                                     4,568,059             123,003             122,967                  3%
      Tax equivalents                                       1,088,812              90,734              90,734                  8%
      Sale of Goods and Major Services                      7,274,896             587,079             615,028                  8%
      Sale of Contract & Recoverable Works                     15,364               1,280                  46                  0%
      Rental & Lease Income                                 1,173,953             103,727             114,536                 10%
      Other income                                            598,950              63,198              69,871                 12%
      Grants, subsidies, contributions and donations        5,394,440           1,771,643            1,780,122               33%
                                                           87,310,066          34,468,262          34,522,772                40%
Expenses
      Recurrent Expenses
      Employee benefits                                    27,656,844           2,088,132            1,597,475                 6%
      Materials and services                               38,854,938           3,123,744           2,876,294                  7%
      Finance costs                                         2,686,315             221,776             224,900                  8%
      Depreciation and amortisation                        16,630,163           1,385,847            1,385,847                 8%
      Other expenses                                          121,828               4,758                 750                  1%
                                                           85,950,088           6,824,257           6,085,266                  7%

Operating Result                                            1,359,978          27,644,005          28,437,506

Capital Revenue
      Capital contributions and donations                   1,606,029             102,028              88,746                  6%
      Grants, subsidies, contributions and donations        2,072,221                   -                    -                 0%
      Other capital revenue                                         -                   -               3,601

Capital Expenses
      Capital Expenses                                              -                   -                    -
Net Result                                                  5,038,228          27,746,032          28,529 853

Other Comprehensive Income
   Increase / (decrease) in asset revaluation surplus               -                   -                    -
  Other Comprehensive Income                                        -                   -                    -
Total Other Comprehensive Income                                    -                   -                    -

Total Comprehensive Income                                  5,038,228          27,746,032          28,529,853

                                                                                                             Page 68 of 139

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     18 AUGUST 2015

                                                   ATTACHMENT 2




                                                       Page 69 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            18 AUGUST 2015

                                                                                         ATTACHMENT 2
   Noosa Council
   Statement of Financial Position
   For the Year Ended 30 June 2016

                                                                             Consolidated
                                                                    2016                     2015
                                                    Note              $                        $
  Current Assets
        Cash and cash equivalents                                      55,183,793               50,891,174
        Trade and other receivables                                    32,410,696                5,929,247
        Inventories                                                       101,214                  104,038
        Other current assets                                            1,627,078                3,097,262
                                                                       89,322,781               60,021,721
        Non Current Assets held for sale                                         -                       -
  Total Current Assets                                                 89,322,781               60,021,721

   Non Current Assets
        Trade and other receivables                                    49,217,517               49,217,517
        Other non current Assets                                                 -                       -
        Investments                                                    60,978,225               60,978,225
        Investment property                                             3,831,234                3,831,234
        Property, plant and equipment                                 885,846,282             887,078,579
        Intangible assets                                               2,679,780                2,701,457
  Total Non Current Assets                                          1,002,553,038            1,003,807,012

  Total Assets                                                      1,091,875,819            1,063,828,732

  Current Liabilities
        Trade and other payables                                        7,359,193                8,100,893
        Borrowings                                                      2,838,309                2,633,065
        Provisions                                                      4,848,730                4,891,033
        Other                                                           1,178,489                1,082,497
  Total Current Liabilities                                            16,224,722               16,707,488

   Non Current Liabilities
        Trade and other payables                                                 .                       -
        Borrowings                                                     36,747,480               36,747,480
        Provisions                                                      8,011,604                8,011,604
  Total Non Current Liabilities                                        44,759,084               44,759,084

  Total Liabilities                                                    60,983,806               61,466,572

   Net Community Assets                                             1,030,892,013            1,002,362,161

  Community Equity
        Asset Revaluation Surplus                                      14,334,106               14,334,106
        Retained Surplus / (Defeciency)                                          -                       -
        Shire Capital                                                 973,986,708             973,986,708
        Current Year Net Earnings                                      42,571,199               14,041,346
  Total Community Equity                                            1,030,892,013            1,002,362,161

                                                                                               Page 69 of 139

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015


                                                     ATTACHMENT 3




                                                     Page 70 of 139

Noosa Council                                                                                                                          ATTACHMENT 3
Capital Works Schedule
  As at: 34-Jul-2015

                                                                                        Original              Current          Year To Date           % of Annual
     Project                                                                              Budget                Budget               Actual         Budget Spent
Bridges
      500003 - Noosaville - Munna Point Bridge Stage 2                                    1,627,005            1,627,005                    0                0.00%
      500500 - Cooroy Mary River Road Timber Bridge Rehabilitation                          50,000                50,000                    0                0.00%
      500501 - Cooroy, Cooroy- Belli Creek Road Timber Bridge deck resurfac                 10,000                10,000                    0                0.00%
      500502 - Whole of Shire Annual Level 3 Bridge inspection program 2016                 30,000                30,000                    0                0.00%
      500503 - Whole of Shire Bridge replacement program - Planning and des                200,000              200,000                     0                0.00%

                                                                Total Bridges            1,917,005             1,917,005                    0                0.00%

Coastal Canals and Waterways
      500109 - Munna Point Foreshore Stabilisation                                               0                     0                1,449                0.00%
      500504 - Noosa Heads Ravenswood Park Public Jetty Rehabilitation                      35,000                35,000                    0                0.00%
      500505 - Tewantin Doonella Street Public Jetty Rehabilitation                         28,000                28,000                    0                0.00%
      500506 - Sunshine Beach - Beach Access 30                                             45,000                45,000                  286                0.64%
      500507 - Sunrise Beach - Beach Access 34 Replace stairs adjacent road                 50,000                50,000                    0                0.00%
      500508 - Castaways Beach - Beach Access 42                                            70,000                70,000                    0                0.00%
      500509 - Noosaville Noosa Waters - navigational lock renewals                         13,000                13,000                    0                0.00%
      500510 - Noosa Heads Main Beach - Sand pumping pipe replacement progr                 50,000                50,000                    0                0.00%

                                          Total Coastal Canals and Waterways               291,000              291,000                 1,735                0.60%

Commerical Land and & Property
      500111 - Rufous St Precinct Redevelopment                                                  0                     0                1,810                0.00%
      500207 - Rufous St Design & Development Phase                                        300,000              300,000                     0                0.00%
      500511 - Sunrise Beach Shopping Centre Refurbishment                                  60,000                60,000                    0                0.00%

                                        Total Commerical Land and & Property               360,000              360,000                 1,810                0.50%

Community Facilities
      500073 - Tait Duke House - relocation                                                      0                     0                   63                0.00%
      500512 - Sunshine Beach NAC - Hydraulics Report 50mtr pool filtration                 10,000                10,000                    0                0.00%
      500513 - Cooroy Library - Roof drainage repair and replacement                        11,500                11,500                    0                0.00%
      500514 - Sunshine Beach NAC - Regrout & recaulk of the Program Pool                   30,000                30,000                    0                0.00%
      500515 - Noosa Heads Surf Club Public Amentities Refurbishment                        85,000               85,000                     0                0.00%
      500516 - Sunshine Beach NAC - Replacement of Program Pool heat pump                   55,000                55,000                    0                0.00%
      500538 - NLC - Stage 2 Construction of redesigned reception area                      45,000                45,000                    0                0.00%
      500539 - Noosa Heads Demolition of Lifeguard Service/ SLSQ operations                 21,000                21,000                    0                0.00%

                                                   Total Community Facilities              257,500              257,500                    63                0.02%

Corporate Buildings
      500517 - Noosaville Depot Fire protection system and panel renewal                    17,000                17,000                    0                0.00%

                                                    Total Corporate Buildings               17,000                17,000                    0                0.00%

Environmental Assets, Bushland, Tracks and Trails
      500540 - Noosa Heads Weyba Creek Bank Erosion rehab and access                       100,000               100,000                    0                0.00%

                       Total Environmental Assets, Bushland, Tracks and Trails             100,000               100,000                    0                0.00%

Fleet - Plant Replacement
      500518 - Plant and fleet replacement program 2015-2016                              1,854,000            1,854,000                    0                0.00%

                                               Total Fleet - Plant Replacement           1,854,000             1,854,000                    0                0.00%

Gravel Road Network
      500519 - Whole of Shire Gravel Resheeting - Annual Program 2015/16                   350,000              350,000                     0                0.00%
                                                   Total Gravel Road Network               350,000              350,000                     0                0.00%

Holiday Parks
      500030 - Noosa River Holiday Pk- Internal refurb                                           0                     0                2,085                0.00%
      500113 - Cooroy RV Stopover                                                                0                     0                6,351                0.00%

                                                          Total Holiday Parks                    0                     0                8,435                0.00%

Information Technology
      500078 - Whole of Shire - replace failed UPS                                               0                     0                  111                0.00%
      500520 - Replacement of off-support and off-lease computers at Noosa                  34,600                34,600                    0                0.00%
      500541 - Whole of Shire Mobile Mapping Stage 2 - Hardware & Configura                 80,000                80,000                    0                0.00%

                                                                                                                                     Page 70 of 139

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 71 of 139

Noosa Council
Capital Works Schedule
  As at: 31-Jul-2015

                                                                                        Original              Current          Year To Date          % of Annual
      Project                                                                             Budget               Budget                 Actual       Budget Spent
      500542 - Implementation of Cl Anywhere Functionality for TechnologyOn                 80,000               80,000                     0                0.00%

                                                Total Information Technology               194,600              194,600                   111                0.06%

Parks & Playgrounds
      500521 - Peregian Beach Skate park Shade Sail renewal                                 80,000              80,000                      0                0.00%
      500522 - Sunshine Beach Skate park renewal - Design                                   36,000               36,000                     0                0.00%
      500523 - Whole of Shire Park shelter - Renewal Park shelters 2015/16                  45,000               45,000                     0                0.00%
      500524 - Whole of Shire Playground refurbishments 2015/2016                          100,000              100,000                     0                0.00%
      500525 - Whole of Shire Park Furniture Renewal 2015/2016                              50,000               50,000                     0                0.00%
      500551 - Noosa Hinterland Priority Playground - Planning & Design                     50,000               50,000                     0                0.00%

                                                   Total Parks & Playgrounds               361,000              361,000                     0                0.00%
Pathways & Enabling Facilities
      100737 - Gibson Road (Eumindi Noosa Rd to Thomas St) - On road cycle                       0                    0                 1,717                0.00%
      500099 - Eenie Creek Pathway Stage 1 Signage                                               0                    0                 2,808                0.00%
      500100 - Wallace Park Shared Path Construction                                             0                    0                   512                0.00%
      500103 - Cooroy Noosa Road Corridor Improvement                                            0                    0                19,649                0.00%
      500115 - Tewantin State School Precinct Pathways                                           0                    0                   275                0.00%
      500526 - Noosa Heads Park Road, Boardwalk Design and consultation                    200,000              200,000                     0                0.00%
      500527 - Noosa Heads Sheraton Boardwalk rehabilitation                               63,000                63,000                     0                0.00%

                                          Total Pathways & Enabling Facilities             263,000              263,000                24,960                9.49%

Planning Scheme
      500079 - Noosa Design Manual                                                               0                    0                    79                0.00%
      500543 - Whole of Shire Planning Scheme Development Projects 2016                    400,000              400,000                     0                0.00%
                                                       Total Planning Scheme               400,000              400,000                    79                0.02%

Public Transport Infrastructure
      500001 - Electric Bus Feasibility Study                                                    0                    0                 2,750                0.00%
      500053 - Whole of Shire - bus shelter DDA                                                  0                    0                   400                0.00%
      500528 - Whole of Shire Bus Shelter Disabled Compliant Program: 2016               1,500,000             1,500,000                    0                0.00%

                                          Total Public Transport Infrastructure          1,500,000             1,500,000                3,150                0.21%

Sealed Roads Network
      100742 - Sealed Road Pavement surveys and Investigations                                   0                    0                   584                0.00%
      500055 - Whole of Shire - reseal and rehab                                                 0                    0                46,580                0.00%
      500062 - Noosaville - Eumundi Noosa Road corridor                                          0                    0                   415                0.00%
      500065 - Emergent all infrastructure renewal                                               0                    0                   965                0.00%
      500118 - Dr Pages - Kinmond Creek Rd Initial Planning & Design                             0                    0                 2,684                0.00%
      500529 - Whole of Shire Other Emergent Works Program 2015-2016                     3,933,895             3,933,895                    0                0.00%
      500530 - Whole of Shire Reseal & Rehabilitation Program 2015/2016                  4,750,000            4,750,000                     0                0.00%
      500531 - Whole of Shire Pavement surveys and Investigations 2015/2016                60,000                60,000                     0                0.00%
      500544 - Cootharaba - Dr Pages Road & Kinmond Creek Rd - Construction             4,700,000             4,700,000                 5,184                0.11%

                                                  Total Sealed Roads Network            13,443,895            13,443,895               56,412                0.42%

Sports Ground and Facilities
      500545 - Tewantin Noosa District Sports Complex - Internal roadway pl                 30,000               30,000                     0                0.00%

                                            Total Sports Ground and Facilities              30,000               30,000                     0                0.00%

Stormwater Drainage
      500057 - Gympie Terrace pipe rehabilitation                                                0                    0                   258                0.00%
      500060 - Whole of Shire - stormwater structures                                            0                    0                 2,003                0.00%
      500084 - Whole of Shire - Flood mitigation stage                                           0                    0                 1,203                0.00%
      500532 - Whole of Shire CCTV Drainage program 2015/2016                               50,000               50,000                     0                0.00%
      500533 - Whole of Shire Pipe re-lining/ rehabilitation program 2016                  250,000              250,000                     0                0.00%
      500534 - Whole of Shire Stormwater Pit Structure renewal program 2016                200,000              200,000                     0                0.00%
      500535 - Whole of Shire Kerb & Channel Renewal Program 2015/2016                      50,000               50,000                     0                0.00%

                                                   Total Stormwater Drainage               550,000              550,000                 3,464                0.63%

Streetscapes and Road Corridors
      500085 - Peregian Beach - precinct planning                                                0                    0                   468                0.00%

                                        Total Streetscapes and Road Corridors                    0                    0                   468                0.00%

                                                                                                                                       Page 71 of 139

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 72 of 139

Noosa Council
Capital Works Schedule
  As at: 31-Jul-2015

       Project                                                                          Budget              Budget                Actual       Budget Spent

      100751 - Eenie Creek Road / Walter Hay Drive Intersection safety upgr                   0                    0               30,475               0.00%
      100752 - Weyba Road Reef Street Intersection Improvements - PIP                         0                    0                  84                0.00%
      500536 - Tewantin Cooroy Noosa Rd Traffic Management Construction - A             160,000              160,000                    0               0.00%
      500546 - Whole of Shire Forward Planning & Design Program - Construct            300,000               300,000                    0               0.00%
      500547 - Sunrise Beach Ben Lexcen Drive School Crossing Improvement-c             430,000              430,000                    0               0.00%
      500548 - Road directional signage (incl Noosa Entrance sign                        50,000              50,000                     0               0.00%
      500552 - Noosa Transport Strategy                                                 150,000              150,000                    0               0.00%
      500553 - Whole of Shire Street lighting program 2015/2016                          15,000               15,000                    0               0.00%
                               Total Transport and Infrastructure Management           1,105,000           1,105,000               30,559               2.77%

      100967 - Noosaville Landfill Sedimentation Pond                                         0                    0                  591               0.00%
      500537 - Noosaville Eumundi Rd Landfill Concrete Approaches to Weighb             200,000              200,000                    0               0.00%
      500549 - Noosaville Eumundi Rd Landfill Prepare Cell 2.2                           80,000              80,000                     0               0.00%
      500550 - Noosaville Eumundi Rd Landfill Relocate Concrete Processing               30,000              30,000                     0               0.00%
                                                   Total Waste Management               310,000              310,000                 591                0.19%

                                                              Grand Total          23,304,000            23,304,000              131,837                0.57%

Capital Works Program
      YTD Actual Expenditure                                                           $131,837
      Remaining Capital Expenditure                                                 $23,172,163
      Full Year Budgeted Expenditure                                                $23,304,000

                                                                               YTD Actual
                                                                              Expenditure
                                                                                0.57%

                                                                                                                                    Page 72 of 139

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                               18 AUGUST 2015


EXECUTIVE OFFICE REPORTS
8                        NOOSA ECONOMIC PROFILE
DOCUMENT INFORM AT ION




Author                            Senior Economic Development Officer, Carolyn Bullen
                                  Executive Office

Index                             ECM/Subject/ 45 – Project Management

Attachments                       1.   Economic Profile, Noosa Shire Prepared by AEC Group Ltd
                                       (58 page attachment – supplied separately to this agenda
                                        2 hard copies available for viewing in the Councillors’ Room)



EXECUTIVE SUMMARY
The AEC Group was engaged to prepare an economic profile for the Noosa Shire.
Information in the profile will inform the development of a local Economic Plan for Noosa,
form a baseline from which to monitor and measure the economy overtime and assist in
decision making within business and industry.

The purpose of this report is to provide Council with an overview of the key indicators within
the Economic Profile and seek approval to use the information in the future policy and
planning.

RECOMMENDATION
That Council note the report by the Senior Economic Development Officer to the Planning &
Organisation Committee Meeting dated 18 August 2015 and note the Economic Profile
prepared by AEC Group Ltd.


REPORT

1.                       Background

There are a number of government agencies that provide a range of economic data and
statistics however base information can be obtained from a variety of sources and differing
methodologies applied. Additionally in many instances information is only published at a
higher level and needs to be filtered to a lower level to be applicable or relevant. Therefore
specialist skills are needed to apply a robust framework and methodology when constructing
economic data and subsequently, the AEC Group was engaged to provide an economic
profile for the Noosa Shire region.

The Economic Profile (refer Attachment 1) will be used to inform the development of Council
policy and plans and to monitor economic activity overtime. It will also be made available to
the public to, among other things, inform and assist in decision making within business and
industry.

2.                       Key Points

The Noosa Economy is strong and growing. It reflects many national trends such as an
ageing population and growth in the health care and social services, and professional,
scientific and technical services.



                                                                                                  Page 73 of 139

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               18 AUGUST 2015


However the Noosa economy is reliant on tourism and population driven industry sectors,
and could benefit from a more diversified economic base that is geared more towards
smart/knowledge based industry sectors.

    The Noosa economy is geared towards tourism and population driven industry sectors.
    Forecast population growth is expected to average 0.7% per annum reaching a
      population of approximately 62,000 people by 2036.
    Noosa’s population is ageing, and a little faster than most. In 2011 the average age
      was 46 years compared to 36years for Queensland and 38 years for the SEQ region.
    Accommodation and foods services, retail and construction are among our top 5
      employment sectors which also include healthcare and social assistance and
      education and training.
    Top 5 employment sectors make up over 60% of total jobs but only deliver 38% of
      value to the economy (GRP).
    Gross Regional Product in 2013-2014 was just under $2.6 Billion, growing at an
      average rate of 2.5% over the previous 5 years.
    Noosa’s three main industries by contribution to gross regional product are
      construction, health care & social assistance and retail.
    Unemployment is at 7.3% just under 1% above Queensland with approximately 1,970
      people looking for work.
    Approximately 7,400 businesses operate from Noosa.
    89.6% of Noosa businesses employ less than five people compared to 88.2% of SEQ
      region businesses and 87.5% of Queensland businesses.
    Significant occupations of employment in Noosa are professionals at 18.5% of all
      employment, technicians and trades at 15.5% of all employment and managers at
      15.5% of all employment.

3.    Tables and Graphs

The following tables and graphs provide an overview of the key economic indicators for
Noosa.

3.1    Population
The Noosa economy is not dissimilar to other lifestyle destinations in that the economy is
geared towards population driven industry sectors.

The Noosa economy experienced particularly high levels of population growth in the period
between 1981 and 1996, ranging between 16.5% and 5.1%. This, Noosa’s high tourism
profile and people’s ability and desire to live in destinations like Noosa that offer such an
enviable lifestyle, have been key economic drivers.

While population growth began to slow in the early 2000’s, Noosa’s reputation as a world
class tourism destination continued to grow strongly, deepening our economic reliance on
tourism, hospitality and retail as key employing industry sectors.

Since 2004 population growth in Noosa Shire averaged 1.2% per annum compared to 2.2%
for SEQ region and 2.1% for Queensland, however forecast population growth is expected to
average only 0.7% per annum in Noosa Shire reaching a population of approximately 62,000
by 2036.




                                                                                 Page 74 of 139

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                           18 AUGUST 2015


Noosa LGA Historical and Projected Population
                                              70,000                                                                                              3.0%



                                              60,000
                                                                                                                                                  2.5%



                                              50,000
                                                                                                                                                  2.0%


                                              40,000
       Population




                                                                                                                                                         % Growth
                                                                                                                                                  1.5%

                                              30,000


                                                                                                                                                  1.0%
                                              20,000



                                                                                                                                                  0.5%
                                              10,000



                                                  0                                                                                               0.0%
                                                       2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2016 2021 2026 2031 2036

                                                                Noosa        Noosa % Growth          SEQ % Growth          Queensland % Growth



On trend with the rest of Australia, Noosa’s population is ageing, albeit faster than many
locations. In 2011, the median age for the shire was 46 years compared to 38 and 36 years
in the SEQ region and Queensland respectively.        Residents aged 45 years and over
accounted for 39.3% of the population in 1991 and 50.9% at the 2011 census.

While the aging population going forward implies a smaller workforce will produce less in
economic terms, it also indicates there will be demand for a range of goods and services
specific to an older demographic.

Residents by Age Bracket, Noosa Shire LGA, 1991-2036
                                              100%

                                               90%
Proportion of Residents in Age Brackets (%)




                                               80%

                                               70%

                                               60%

                                               50%

                                               40%

                                               30%

                                               20%

                                               10%

                                                0%
                                                        1991     1996     2001     2006       2011     2016         2021   2026      2031        2036
                                                  0-4 years                5-14 years                  15-19 years                  20-24 years
                                                  25-34 years              35-44 years                 45-54 years                  55-64 years
                                                  65-74 years              75-84 years                 85 years and over
Source: Noosa Shire Council (unpublished)




                                                                                                                                                                    Page 75 of 139

Section 76

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                 18 AUGUST 2015


3.2        Employment

Employment trends in Noosa reflect our ageing population, national trends in health care,
and a strong tourism sector. Increased employment in professional, scientific and technical
services signals growth in ‘smart’ - high value industry sectors. This is also a national trend
that could be exploited.

Three of the top five employment sectors in Noosa are primarily geared towards population
and tourism driven industry sectors. These five sectors provide 60% of all local jobs:
       Retail trade employs 16% of the total workforce, which is 50% higher than the
         Australian average.
       Accommodation and foods services employ 14% of the total workforce which is double
         the Australian average.
       Health care and social assistance employs 12% of the total workforce.
       Education and training employs 9% of the total workforce, and
       Construction employs 8% of the total workforce.

Employment by Industry, 2011

                                           Retail Trade
                  Accommodation and Food Services
                   Health Care and Social Assistance
                                Education and Training
                                          Construction
     Professional, Scientific and Technical Services
                                         Manufacturing
                                         Other Services
                Administrative and Support Services
             Rental, Hiring and Real Estate Services
                                      Wholesale Trade
                       Public Administration and Safety
                       Financial and Ins urance Services
                 Transport, Postal and Warehousing
                           Arts and Recreation Services                         Queensland

                       Agriculture, Forestry and Fishing                        South East Queensland
       Information Media and Telecommunications
                                                                                Noosa LGA
        Electricity, Gas, Water and Waste Services
                                                Mining

                                                       0.0%        5.0%       10.0%          15.0%       20.0%
                                                              % of Employment by Industry

Note: Place of work.
Source: ABS (2011)




                                                                                                     Page 76 of 139

Section 77

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                               18 AUGUST 2015


Change in Employment, Noosa Shire, 2001-11

                                                    Other services
                                      Arts and recreation services
                              Health care and social assistance
                                           Education and training
                               Public adminsitration and safety
                           Administrative and support services
Professional, scientific and technical services
                          Rental, hiring and real estate services
                                  Financial and insurance services
 Information media and telecommunications
                           Transporrt, postal and warehousing
                             Accommodation and food services
                                                      Retail Trade
                                                 Wholesale trade
                                                     Construction
                         Electricity, gas, water and waste water
                                                    Manufacturing
                                                           Mining
                                  Agriculture, forestry and fishing

                                                                      -400   -200   0     200   400    600    800    1,000 1,200
                                                                                          Employment (No.)
Source: ABS (2001, 2011)


Noosa Shire has a labour force of some 27,055 people of which 25,085 are currently
employed and $1,970 are not, reflecting an unemployment rate of 7.3%. Unemployment in
Noosa Shire is generally higher than the SEQ Region and the State.

Noosa LGA Unemployment and Labour Force                                                                      Source: QGSO (2015)


                         30,000                                                                                         8.0%


                                                                                                                        7.0%
                         25,000

                                                                                                                        6.0%
                                                                                                                               Unemployment Rate (%)




                         20,000
    Labour Force (No.)




                                                                                                                        5.0%


                         15,000                                                                                         4.0%


                                                                                                                        3.0%
                         10,000

                                                                                                                        2.0%

                          5,000
                                                                                                                        1.0%


                              0                                                                                         0.0%



                    Noosa LGA Labour Force           Noosa LGA Unemployment %       SEQ Unemployment %   Queensland Unemployment %




                                                                                                                                                       Page 77 of 139

Section 78

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                18 AUGUST 2015


Across all occupations, professionals are the most prominent accounting for 18.5% of all
employed Noosa residents. This was followed by technicians and trades 15.5%, managers
13.7% and sales workers 12.4%.

3.3                  Tourism

Noosa has a world class tourism sector and notable brand awareness and equity. The
tourism sector is strong and active and as a result experienced strong increases in visitation
during 2012 and 2013 (15% year on year). In the year ending September 2014 the sector
injected $600 million into the local economy, and visitation grew in the higher yield
international and overnight markets while the lower yielding day trip visitor market saw
numbers drop considerably (27%).

Tourism Visitation, Noosa Shire LGA, 2006 to 2014                                                                              Source: TRA (2014c)


                                  2,500                                                                                        25%




                                  2,000                                                                                        15%
      Number of Visitors ('000)




                                                                                                                                      % Ann. Growth.
                                  1,500                                                                                        5%




                                  1,000                                                                                        -5%




                                   500                                                                                         -15%




                                     0                                                                                         -25%
                                          YE Sep   YE Sep    YE Sep     YE Sep   YE Sep   YE Sep   YE Sep   YE Sep    YE Sep
                                           2006     2007      2008       2009     2010     2011     2012     2013      2014

                                              Day Vistors ('000)                               Overnight Visitors ('000)
                                              International Visitors ('000)                    % Growth


3.4                  Gross Regional Product

Noosa Shire produced just under $2.6 billion in gross regional product (GRP) in 2013-14;
this was up an impressive 5.6% on the previous year, compared to 1.8% and 2.3%
increases for SEQ Region and the State respectively. GRP averaged a creditable 2.5% per
annum growth over the last five years compared to 2.2% for SEQ Region and 2.1% for
Queensland as a whole. Industry sector contribution to the economy in terms of industry
value add to gross regional product, again clearly reflects the structure of the economy with
health care, retail and construction being the fastest growing sectors.

Electricity, gas, water and waste services generated the highest GRP per employee at
$429,461 per employee, followed by financial and insurance services at $291,199 per
employee, and rental, hiring and real estate services ($151,638 per employee).

Conversely the major Noosa Shire industries of retail trade and accommodation and food
services generate lower GRP per employee $54,806 and $42,788 per employee
respectively.




                                                                                                                                                       Page 78 of 139

Section 79

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                            18 AUGUST 2015


Noosa Shire IVA Breakdown (2013-14)                                                                       Source: AEC (unpublished)


                                                    Construction

                              Health care and social assistance

                                                     Retail trade

                               Financial and insurance services

                             Accommodation and food services

                                         Education and training

                          Rental, hiring and real estate services

                 Professional, scientific and technical services

                                                  Manufacturing

                            Administrative and support services

                                                Wholesale trade

                      Electricity, gas, water and waste services

                                Public administration and safety

                             Transport, postal and warehousing
                                                                                                                               Queensland
                                                  Other services
                                                                                                                               South East
                     Information media and telecommunications
                                                                                                                               Queensland
                                    Arts and recreation services                                                               Noosa LGA

                                Agriculture, forestry and fishing

                                                          Mining

                                                                0.0%       2.0%   4.0%       6.0%       8.0%       10.0%      12.0%         14.0%

                                                                                  % of IVA




Noosa Shire Historical GRP and Growth Rate                                                                Source: AEC (unpublished)


            $3,000                                                                                                               6.0%


                                                                                                                                 5.0%
            $2,500


                                                                                                                                 4.0%
            $2,000

                                                                                                                                 3.0%
                                                                                                                                            % Growth
 GRP ($M)




            $1,500
                                                                                                                                 2.0%

            $1,000
                                                                                                                                 1.0%


             $500
                                                                                                                                 0.0%


               $0                                                                                                                -1.0%
                           2008-09               2009-10               2010-11    2011-12           2012-13       2013-14
                Noosa LGA GRP ($M)                       Noosa LGA % Growth           SEQ % Growth             Queens land % Growth




                                                                                                                                Page 79 of 139

Section 80

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  18 AUGUST 2015


3.5    Income

The highest average income for people living in Noosa was achieved in the mining sector at
$1,953.40 per week inflation adjusted to November 2014. This was followed by electricity,
gas, water and waste services at $1,531.80 per week, and financial and insurance services
$1,317.10 per week.
Industries most closely associated with the tourism sector such as retail, accommodation
and food services and transport, postal and warehousing; offered the lowest wages. This
included arts and recreation services at $698.50 per week, accommodation and food
services $612.70 per week, and retail trade $607.20 per week.

Noosa Incomes by Industry (Inflation Adjusted to November 2014) Source: ABS (2011, 2015c)
                    Industry                                           Noosa
                    Mining                                            $1,953.4
                    Electricity, Gas, Water and Waste Services        $1,531.8
                    Financial and Insurance Services                  $1,317.1
                    Public Administration and Safety                  $1,268.4
                    Professional, Scientific and Technical Services   $1,204.1
                    Construction                                      $1,142.5
                    Education and Training                            $1,135.5
                    Information Media and Telecommunications          $1,085.8
                    Transport, Postal and Warehousing                 $1,068.7
                    Health Care and Social Assistance                 $1,058.6
                    Wholesale Trade                                   $1,045.8
                    Rental, Hiring and Real Estate Services           $1,032.6
                    Manufacturing                                     $1,015.8
                    Administrative and Support Services                $854.3
                    Agriculture, Forestry and Fishing                  $841.9
                    Arts and Recreation Services                       $782.9
                    Other Services                                     $767.8
                    Accommodation and Food Services                    $686.7
                    Retail Trade                                       $680.5


Noosa Shire reported a median household income almost $200 below the SEQ Region and
almost $300 below the State in 2011 ($953.5, $1,150.7 and $1,235.0 per week respectively).

This could be partly attributed to the high proportion of part-time work in the region. Part time
work accounts for around 35%-40% of total employment within the broader Sunshine Coast
Statistical Area Level 4 (SA4), compared to around 25%-30% in other benchmark regions.
(See full report at Attachment 1).

3.6    Business Counts
Noosa Shire is home to some 7,400 businesses. 62.1% of those are non-employing micro
businesses and 27.5% are also micro but employ between 1-4 people. At the other end of
the scale .01% employ 200 plus people. By turnover, 26.4% of businesses sit between $0
and $50,000 with 13.1% turning over between $500,000 and $2 million.
Noosa is also home to a range of very successful entrepreneurs and business people with
expertise across multiple industry sectors. Many of these same people are active within the
community and business organisations such as Tourism Noosa, Noosa Biosphere
Foundation Ltd, Noosa Community Biosphere Association Inc, The Chamber of Commerce
and Industry Queensland – Noosa Business Mentors and the Project Focus Group
established to contribute the development of this Plan.


                                                                                     Page 80 of 139

Section 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                           18 AUGUST 2015


Noosa LGA Business Counts by Turnover Range                                                         Source: ABS (2015d)


                                      13.1%

                                                          26.4%



         20.1%                                                          $0 to - $50,000
                                                                        $50,000 - $100,000
                                                                        $100,000 - $200,000
                                                                        $200,000 - $500,000
                                                                        $500,000 - $2 million



                                                             16.8%


                          19.8%




Business Counts by Employment Size                                                        Source: ABS (2015d)




      Non-employing




                 1-4




              15-19


                                                                     Queensland
                                                                     South East Queensland
            20-199
                                                                     Noosa LGA




              200+



                   0.0%       10.0%    20.0%   30.0%      40.0%       50.0%        60.0%          70.0%
                                                & of Businesses

3.7      Industry Clusters

Cluster mapping portrays regional location quotients (LQs) against benchmark industry
employment growth over time. By doing this, growth opportunities in specific industry sectors
can be identified.
The cluster maps highlight where Noosa has an existing natural competitive advantage
against the national industry backdrop.
Well represented, high growth industry sectors for Noosa Shire include:
    Rental, hiring and real estate services (LQ 2.2).
    Accommodation and food services (LQ 2.1).
    Retail trade (LQ 1.5).

Future high growth sectors in which Noosa Shire is underrepresented include:
   Financial and insurance services (LQ 0.6).
   Electricity, gas, water and waste services (LQ 0.6).
   Public administration and safety (LQ 0.4).




                                                                                                                Page 81 of 139

Section 82

                  PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                                                                            18 AUGUST 2015


                                                         Cluster Map (ANZSIC 1 Digit)                                                                                                                            Source: ABS (2011), IbisWorld (2015)

                                                         3.0
                                                                Well-represented/Low Growth                                                                                                                           Well-represented/High Growth
                                                                                                                              = 600 employees
Cluster Concentration 2011 (Comparison with Australia)




                                                         2.5


                                                                                                                         Accommodation                              Rental, hiring and
                                                                                                                         and food services                         real estate services
                                                         2.0

                                                                                                                   Retail Trade


                                                         1.5
                                                                                                                                                             Administrative and
                                                                                                                                                              support services
                                                                                                                                             Personal Services                                         Health Care and Social Assistance
                                                                                             Arts and recreation
                                                                                                   services         Construction                                                  Education and Training
                                                         1.0
                                                                                                                                                       Professional, Scientific
                                                                                         Information Media and                                         and Technical Services
                                                                                          Telecommunications
                                                                    Manufacturing                                                                                  Financial and Insurance
                                                                                                           Wholesale Trade                                                 Services
                                                         0.5
                                                                                                                Transport, Postal and                         Electricity, Gas, Water
                                                                                                                    Warehousing                                and Waste Services
                                                                                    Agriculture, Forestry and Fishing               Public Administration
                                                                                                                                                                       Mining
                                                                                                                                         and Safety
                                                               Under-represented/Low Growth                                                                                                                       Under-represented/High Growth
                                                         0.0
                                                          -10.0%                          -4.0%                            2.0%                             8.0%                             14.0%                         20.0%

                                                                                                                                  % Industry Employment Growth 2013-14 to 2018-19

                  Previous Council Consideration

                  Nil

                  Finance & Risk

                  Nil

                  Consultation

                  External Consultation - Community & Stakeholder

                  Local Economic Plan Project Focus Group

                  Internal Consultation
                  CEO
                  Executive Manager
                  Strategic Land Use Planning

                  Departments/Sections Consulted:
                     Community Services                                                                                                                     Planning & Infrastructure
                     Disaster Management & Public Order                                                                                                     Building & Plumbing Services
                     Waste & Environmental Health                                                                                                           DA Planning
                     Community Facilities                                                                                                          x        Strategic Land Use Planning
                     Cultural Facilities                                                                                                                    Asset Design & Investigations
                                                                                                                                                            Asset Planning
                                                                                                                                                            Civil Operations
                                                                                                                                                            Environment

                  x                                            Executive Office                                                                             Corporate Services
                                                               Community Engagement                                                                         Finance
                                                               Customer Service                                                                             ICT
                                                               Executive Support                                                                            Procurement & Fleet
                                                               Governance                                                                                   Property & Facilities
                                                               Human Resources                                                                              Revenue Services




                                                                                                                                                                                                                                   Page 82 of 139

Section 83

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    18 AUGUST 2015


9                        APPOINTMENT OF 2016 SHOW HOLIDAY
DOCUMENT INFORM AT ION




Author                           Personal Assistant to the CEO, Kylie Harris
                                 Executive Office

Index                            ECM/ Subject/ Governance & Executive/ Noosa Show Day

Attachments                      Nil.


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Personal Assistant to the CEO to the Planning &
Organisation Committee Meeting dated 18 August 2015 and request the Chief Executive
Officer to write to the Office of Industrial Relations, Queensland Treasury requesting the
appointment of Friday, 9 September 2016 as a Show Holiday for the Noosa Shire.


REPORT
Under the Holidays Act 1983, the Treasurer and Minister for Employment and Industrial
Relations is empowered to appoint, upon request by the Chief Executive Officer of the local
government for the district concerned, a special holiday within a district. Holidays of this
nature are usually appointed for an annual agricultural, horticultural or industrial show.
Requests for the appointment of a special holiday for 2016 must be submitted no later than 4
September 2015.

The Noosa Country Show has traditionally been held annually on the second Friday and
Saturday in September. For 2016, the Noosa Country Show is proposed for 9 – 10
September. It is therefore proposed that an application be made to the Minister to appoint
Friday, 9 September 2016 as the Show Holiday for Noosa Shire for 2016.

Previous Council Consideration

Nil.

Finance & Risk

Nil.

Consultation

External Consultation - Community & Stakeholder

The Noosa Show Society.

Internal Consultation

Nil.




                                                                                        Page 83 of 139

Section 84

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         18 AUGUST 2015


Departments/Sections Consulted:

    Community Services                   Planning & Infrastructure
    Disaster Management & Public Order   Building & Plumbing Services
    Waste & Environmental Health         DA Planning
    Community Facilities                 Strategic Land Use Planning
    Cultural Facilities                  Asset Design & Investigations
                                         Asset Planning
                                         Civil Operations
                                         Environment

X   Executive Office                     Corporate Services
    Community Engagement                 Finance
    Customer Service                     ICT
    Executive Support                    Procurement & Fleet
    Governance                           Property & Facilities
    Human Resources                      Revenue Services




                                                                           Page 84 of 139

Section 85

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


10                       OPERATIONAL PLAN PROGRESS REPORT - 4TH QUARTER 2014-2015
DOCUMENT INFORM AT ION




Author                           Chief Executive Officer, Brett de Chastel
                                 Executive Office

Index                            ECM/ Subject/ Corporate Planning

Attachments                      1.   Key Performance Indicators


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Planning & Organisation
Committee Meeting dated 18 August 2015 providing an update on progress with the
implementation of the Operational Plan to 30 June 2015 and details of Council’s Key
Performance Indicators.


REPORT
This report is in two parts. The first part provides Council with an overview of progress in
implementing the annual Operational Plan. The second part focuses on the KPIs which are
reported to Council on a quarterly basis.

This report relates to the final quarter of the 2014/15 financial year but can be read in
conjunction with the CEO’s report on the 2014/15 year in review.

1.                       OPERATIONAL PLAN UPDATE

At previous Council Committee meetings, Councillors indicated that they did not wish to
have the entire Operational Plan attached to these quarterly progress reports but rather, to
receive a general overview of progress which also highlights key projects. This report
extracts some of the key issues in the Operational Plan and updates Councillors on progress
for the fourth quarter.

A hard copy of the full Operational Plan update has been provided in the Councillors’ Room
if any further detail is required. Councillors have also been provided with copies of briefing
notes used by the Leadership Team to monitor progress with signature projects.

Details of a number of significant or high profile Operational Plan projects and their status
(by Department) is set out below. For each Department, 3 or 4 key projects have been
identified from the Operational Plan.




                                                                                  Page 85 of 139

Section 86

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              18 AUGUST 2015



Initiative                             Comment

Community Services
 Pest and Vector Control –            Draft Pest Management Plan went out to public
   Develop a vector control plan for      consultation on 4 March and closed 7 April. The
   Noosa and liaise with                  Plan was adopted by Council on 7 May 2015.
   representatives from State and
   Commonwealth Government.

 Local Laws – Undertake a review      Proposed new Subordinate Local Laws went out
   of Council’s local laws                to public consultation and community responses
                                          were incorporated into the new suite of Noosa
                                          Local Laws which were adopted by Council on 7
                                          May 2015. The new Local Laws came into force
                                          on 1 July 2015.

 Social Plan – Review Noosa           Demographic data and community profiles have
   Social Plan                            been completed.
                                        The Social Plan Reference Group continues to
                                          meet regularly.
                                        Workshop with Councillors has been held and
                                          Community Services staff are developing the
                                          draft Social Plan.

 Kerbside Collection – continue       Planning for the 2015 kerbside clean-up is
   kerbside clean up                      complete with the rollout of the program to begin
                                          in August

 Disaster Management –                The Noosa Local Disaster Management Plan
   Continue to establish and refine       2015/16 and the Noosa Local Disaster Recovery
   Disaster Management & response         Plan were adopted by Council on 2 July 2015
   arrangements for the Noosa local
   government area

Corporate Services
 Credit Review – Undertake a          The updated 10 year financial model was
   QTC Credit Review to confirm           provided to Queensland Treasury Corporation
   Council’s long term financial          (QTC) in January 2015, and meetings were held
   sustainability                         through February / March to facilitate the review.
                                        The outcomes of the review were presented to
                                          Council by QTC in May 2015.
                                        Council received an upgraded credit rating
                                          which was an excellent result.
 Council buildings – physical risk    All large Council buildings (e.g. administration
   and condition assessment of all        building, library etc) have had detailed condition
   Council buildings                      assessments completed as priority projects
                                        The remainder of Council buildings (e.g. toilet
                                          blocks, community halls etc) are being
                                          progressively assessed and an inspection
                                          program developed to complete those
                                          assessments.


                                                                                 Page 86 of 139

Section 87

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 18 AUGUST 2015


Initiative                                Comment


Planning & Infrastructure

 Planning Scheme Review –                Ministerial sign off for public consultation was
   Complete proposed amendment               been received in the June quarter.
   to the Noosa Planning Scheme            Community consultation planned to occur
   including the Temporary Local             between August and October 2015 developed.
   Planning Instrument (Vegetation
   Protection Overlay) for the Noosa
   area

 Noosa Design Manual –                   Noosa Design Manual adopted by Council on 2
     Development of a design manual          July 2015.
     for private and public
     infrastructure elements that
     contribute to the look and feel of
     Noosa

 Noosa Traffic Study – New               The Noosa Traffic Study is nearing completion
   study to identify road hierarchy          with all traffic count analysis being completed.
   and guide intersection priorities       Noosa Council is also participating in the
                                             NORSCATS Study which is being undertaken by
                                             DTMR and due for completion in November of
                                             this year.

Executive

 Enterprise Bargaining                   CA negotiations have been put on hold due to
   Agreement -Coordination of                legislative and award changes.
   agreement (subject to State             It is unlikely that new local government awards
   Legislative changes)                      will be resolved until the end of October at the
                                             earliest.

 Economic Development –                  Noosa Economic profile has been completed
   Economic Development                      and published
   Strategy                                Consultation has been undertaken via the
                                             Economic Project Focus Group and public
                                             meetings.
                                           Key themes and sectors have been identified
                                             and drafting of Noosa Local Economic Plan has
                                             commenced



2.     KPIS

The key issues arising from an assessment of the KPIs for the fourth quarter are as follows:




                                                                                   Page 87 of 139

Section 88

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                18 AUGUST 2015


Our People
   In relation to WH&S, while the number of incident free days remains at or just below
     the benchmark during this period, the average duration of time lost due to injury is very
     high compared to other like Councils. This is probably reflective of an older workforce
     where injuries can sometimes take longer to recover. Our WH&S practices, policies
     and procedures are still a work in progress. We intend to shortly seek another
     independent review of our WH&S performance.
   Our WH&S scheme rate is lower than other Councils in category D (similar Councils to
     Noosa Council). The best performing Council in that category has a scheme rate of
     0.905% while the worst is 2.083%. Our scheme rate was 1.242%.
   Sick leave taken is continued to be monitored closely and has shown significant
     improvement since this time last year. It is more than 50% lower than 12 months ago.
     April was the lowest level of sick leave since our re-establishment but May and June
     were a little higher as historically, sick leave is higher in winter months.
   Excess annual leave weeks accumulated continue to be at high levels. While there has
     been a slight decline in the number of staff with over 8 weeks annual leave since
     Christmas, it has not been as significant as hoped. It is lower than 12 months ago but
     still too many staff have more than 8 weeks of annual leave owing.

Our Systems and Processes
   We monitor the organisation’s ability to implement the projects approved by the
     Council in the Operational Plan. The key operational plan projects have been
     highlighted in Part 1 of this report and a full copy of the Operational Plan report is
     available in the Councillors’ Room.
   We have a focus on improving our systems to allow more online transactions to enable
     our community to have 24/7 access to services for which the KPI shows an increasing
     trend in online requests. However, as a percentage of total requests, it is still quite
     low. Recently, the Leadership Team spent some time focusing on how we can make
     online service requests more customer friendly, thus encouraging more usage. Online
     payments tend to spike during rate periods, dog registration renewals etc.
   ICT system uptime remains strong.

Our Finances
   Our financial KPIs measure solvency, investment performance and outstanding rates.
     All of these KPIs continue to be on track.
   Council receives a financial performance report at the end of each month which
     provides a more detailed analysis of Council’s financial position.

Our Customers
   The total number of customer requests received by Council remains on a slight upward
     trend in the long term but fewer customer requests were recorded in the last 3 month
     period – approximately 1,250 per month. The number of requests is expected to
     increase again in the next 3 month period as we enter a rates period, annual dog
     registration and our kerbside waste collection.
   Conversely, the level of sign off of completed CRMs (customer request management
     system) is still historically low. Both the Director Planning and Infrastructure and
     Director Community Services have reported to Council recently about actions to
     improve the timing of responses to CRMs particularly in relation to dogs, waste bins,
     road/traffic issues and trees. More work is being done at the management level in
     “drilling down” within the overall statistics.




                                                                                  Page 88 of 139

Section 89

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  18 AUGUST 2015


       The average wait time for our customers when phoning Council continues to improve
         over time, however there continues to be some months where the target of an average
         of 1 minute is exceeded. The month of June saw our best phone performance since
         we began keeping statistics.
       Customer indicators for processing times for various types of development applications
         have remained constant over the 3 month period with MCUs being the type of
         application which generally has the lowest percentage of completion times.
       The KPIs for building information requests and plumbing application processing times
         performed extremely well during the 4th quarter.

As part of continuous improvement, work has been done on refining our management and
Council KPIs to more provide more valuable data. KPIs will continue to be reported to
Council on a quarterly basis and are also analysed by the Leadership Team on a monthly
basis. To provide continuity, the attached KPIs are the same as have been reported during
the 2014/15 financial year. The refined KPIs will commence from 1 July 2015.


Previous Council Consideration

Nil.

Finance & Risk

Nil.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

The details of each of the Operational Plan activities have been provided by relevant
Departments.

Departments/Sections Consulted:

       Community Services                         Planning & Infrastructure
       Disaster Management & Public Order         Building & Plumbing Services
       Waste & Environmental Health               DA Planning
       Community Facilities                       Strategic Land Use Planning
       Cultural Facilities                        Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

X      Executive Office                           Corporate Services
       Community Engagement                       Finance
       Customer Service                           ICT
X      Executive Support                          Procurement & Fleet
X      Governance                                 Property & Facilities
       Human Resources                            Revenue Services




                                                                                    Page 89 of 139

Section 90

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   18 AUGUST 2015




                                                     Page 90 of 139

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                           18 AUGUST 2015

   QUARTERLY ORGANISATIONAL PERFORMANCE REPORTING

   OUR PEOPLE                                                                                  Benchmark is shown by red line, Trend is shown by black line
   Measure                                                                                     Measure
   Number of incident free days                                                                 FTE x 100 head population
   Purpose                                                                                     Purpose
   Safety of the workplace                                                                     Benchmark with category 4 local governments (excluding w&s)
     30 5                                                                                       1.50
     25 +                                                                                       1.25 —_—_
     207                                                                                        1.00 4                          0:90          0.90
                                                                                                                                                             0.80
     2                                                                                          0.75              :
     Lan     i           }                     ;        |                                       0.50 +
      57                                                                                        0.25 4
      =“      ‘           ‘     ‘    ‘          o           ‘          ‘                        0.00
         ss          nb           os  Nk    SS          ©          a     ©                       ,
         »     a          Fw &             :     ae          ey       y*                                 w Noosa      uLockyer Valley     Scenic Rim       = Somerset

   Comment                                                                                     Comment
   Figures provided as per 5 day working week.                                                 Annual Measure
                                                                                               Comparisons have been made with other like category 4 Councils (without an internal water
                                                                                               & sewerage function). Comparative data has been sourced from 2013/14 Qld Local
                                                                                               Government Comparative Data
   Measure
   Council % of LGW
   Purpose
   Safety of the workplace
    3.0% +

    2.5% +

    2.0% +
                                                   LGW Scheme Rate
                                                        1.45%
     1.5%                    1.242%
    1.0% +

    0.5% +

    0.0%                                                             ———ny
                                         Jun-15

   Comment
   2014/ 2015 rate for Noosa Council. Noosa Council falls in the Group D category, the
   lowest rate in that category was 0.905%, the highest rate was 2.083%

                                                                                                                               Page 90 of 139

The text continues on section 91.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.