PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 18 AUGUST 2015
Construction of these rooms above the existing terrace should require minimal vegetation
disturbance, with existing dense screening vegetation able to be maintained and enhanced
with new plantings. As indicated in the section drawings in Figures 5 & 8, the encroachment
sits below the height of the roofline at the complying setback and does not result in the loss
of views for residents at the rear. The reduced rear setback is supported, with conditions
recommended relating to the existing vegetation and new landscaping requirements.
Land Use, Works and Overlay Provisions
The following codes which regulate land use and design are most applicable to this
application:
Residential Uses Code
Landscaping Code
Engineering Works Codes
Natural Hazards Overlay Code
The application has been assessed against each of the above applicable codes and
complies, or can be conditioned to comply with each. The critical issue of slope stability is
discussed further below.
Slope Stability
The site is within a Landslide Hazard Area identified on the Natural Hazards Overlay
mapping. The soil is sand and slopes very steeply toward the rear of the block. Limited new
excavation and groundwork is indicated on the proposal plans, however, a precautionary
approach to any such work is important to avoid landslip or disturbance of existing
structures. Council’s Operational Works Coordinator recommends a number of conditions
requiring a Geotechnical Engineer’s design and supervision of the works, condition surveys
of existing structures and prohibition of vibratory earthwork equipment.
4. CONSULTATION
4.1. IDAS Referral Agencies
Not applicable
4.2. Other Referrals
The application was forwarded to the following internal Council specialists:
Development Engineer
Their comments form part of this report.
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the
Sustainable Planning Act 2009. 2 properly made submissions were received. The following
table provides a summary and assessment of the issues raised by submitters.
Issues Comments
The height of the development The new additions mostly comply with the height
doesn’t comply and is a blight on the limit, with only minor relaxations sought - the
landscape. It will obstruct views and primary being a 2m x 2m lift shaft. The building is
isn't in keeping with the surrounds. otherwise well articulated and its design responds to
the site’s steep slope.
Page 39 of 139
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.