NOOSA COUNCIL IDAS Development Application Decision Notice 6
As an alternative to the easement option, the developer may install an infiltration or combined
detention/infiltration system under the car park to dispose of all flows up to a Q100 event. A Registered
Professional Engineer of Queensland will certify this design and its construction.
30. All site stormwater drainage shall be by means of a gravity system.
Effluent Disposal
31. Deleted.
Water Supply Headworks
32. A contribution shall be paid to Council in accordance with Planning Scheme Policy PSP 28 Water Supply
Headworks Contributions at the rates applicable at the time of payment. An estimate only of the
contribution rate as at March 2002 under the current policy is as follows:
Water Supply $ 8,646
All headworks contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Sewerage Contribution
33. A contribution shall be paid to Council for the future use of Council’s sewerage reticulation system that is
currently being designed for this area and is programmed for construction in the 2003/2004 financial year.
An estimate only of the contribution rate as at March 2002 is as follows:
Sewerage $ 12,755
This contribution must be paid prior to the issue of a Development Permit for Operational Works.
Sediment and Erosion Controls
34. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with any
Development Permit for Operational Works. Site control measures such as silt fencing, controlled gravel
access to the site and controlled disposal of waste, may be necessary. Prior to commencement of any
works on site, all physical site control measures shall be installed, and approved plan adhered to.
General
35. Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
providers to ascertain the location of their underground services.
36. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works and a Development Permit for Operational Works shall be
obtained prior to the commencement of any works.
37. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work. The application
may combine any or all of these classes of work:-
a. Access and/or carparking
b. Roadworks
c. Stormwater Drainage
d. Frontage works
e. Effluent Disposal
f. Sediment and Erosion Controls
g. Landscaping
38. The person acting on this permit shall apply and obtain all other necessary permits including crane, road
opening, hoarding, footpath occupation and/or any other approvals required under any other Act or By-
Law.
H o:\database\onestop\decision.doc
Print Date: 6 March 2020, 2:17 PM