Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

approval plans

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                             7


               39.       Any damage caused to any public utility during the course of construction shall be repaired to Council’s
                         standards and at no cost to Council.

               40.       Any alteration of any public utility or other facilities necessitated by the development of the land or
                         associated construction works external to the site shall be at no cost to Council.

               41.       The transportation of all materials to and from the site shall be undertaken in a manner such that no
                         particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
                         be covered to prevent materials including dust being windblown from the vehicle.

               Environmental Health

               42.       An annual licence and registration of the premises is required under the Food Hygiene Regulations of
                         1989 from Council’s Environmental Health Section where unpackaged food is sold, prepared, packed,
                         stored, handled, served or supplied for sale.

               43.       The developer must provide a suitably screened imperviously paved area large enough for all refuse and
                         recycling containers. A roofed wash down area is required with a cold-water tap, hose and drain outlet
                         connected to sewer.

               44.       Refuse containers must be provided in accordance with the requirements of the Environmental Protection
                         (Interim Waste) Regulations 1996 and (Waste Management) Regulation 2000, for the storage and
                         collection of refuse.

               45.       The development must be undertaken and operated in a manner that causes no detrimental effect upon
                         the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, dust or odour
                         nuisance or any other emissions in accordance with the nuisance provisions of the Environmental
                         Protection Regulation 1998. On the spot fines apply for such offences.

               46.       All refrigeration plant including motors, shall be situated within the building or suitably provided with noise
                         reduction measures and located as to prevent a noise nuisance beyond the subject land in accordance
                         with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply
                         for such offences.

               47.       Air conditioning units shall be located in a manner which prevents noise nuisance beyond the subject
                         land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On
                         the spot fines apply for such offences.

               48.       The development must allow refuse-loading areas to be located off street. All vehicles associated with
                         the collection of waste/recyclables, shall enter and leave the site in a forward direction.

               49.       Provide cleaners sink to “storage area” adjacent to restaurant kitchen.

               50.       The bin washing area is to be roofed and the floor is to fall to a bucket trap prior to discharge to the on-
                         site sewerage system. Rain water is to be excluded from the bin washing area. Bin washing is to take
                         place only at the bin washing area

               51.       Full truck access is to be provided to each grease arrestor and/or pre-treatment device for cleaning and
                         servicing. W here access is restricted, a pump out line is required.




               H o:\database\onestop\decision.doc


                                                                                                                       Print Date: 6 March 2020, 2:17 PM
Log in to download the original file

approval plans.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.