Stormwater Management Plan
The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSTORMWATER MANAGEMENT AND MAINTENANCE PLAN aes MAINTENANCE OF RAPID INFILTRATION PITS (RIP’s) 1. Objective To ensure ongoing function of RIP’s in reintroducing runoff into the subsoil and prevent surcharge/flooding. Consequences of | Possible flooding of building during storm events. Failure 2. Management Strategy | RIP internal surface to remain free of silt/sediment build-ups. RIP grates to remain clear and free of debris or blockages. Actions Maintenance Contractor to be issued with laminated copies of final ALTA Projects drawings A6769/22/PD01 to PDO5 for reference. Swales and RIP surface grates to be kept clear of any debris or blockages. Maintenance contractor with appropriate enclosed spaces qualifications and procedures in place to enter each RIP to inspect at quarterly intervals and after any event where more than 50mm of rain has fallen. Any debris, leaf litter etc accumulated in the RIP to be removed and disposed of lawfully. Upper BIDIM A14 filter layer to be inspected and if more than 50% covered in silt or mud replaced. Upper BIDIM A14 filter layer to be replaced annually. When replacing upper filter, the sand layer below to be inspected for discolouration and contamination and if present ALTA Projects to be notified for review and further advice. RIP walls and balance pipes to be inspected for any signs of cracking or degradation. If observed ALTA Projects to be notified. All removed filter layers, sand, sediment, silt to be disposed of lawfully. Performance Indicators No surcharging of RIPs. No overflow from rock pitched weirs Frequency/Deadline Inspections after rain events or quarterly (whichever comes first) Reporting and Review Maintenance Contractor to make entries in service diary. Site Owner to review service diary annually.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.