Stormwater Management Plan

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
ELEMENT : MAINTENANCE OF STORMWATER EMERGENCY OVERFLOW

1.

Maintenance
Objective
Consequences of
Failure

To ensure ongoing function of Stormwater
Emergency Overflow System.

Possible flooding of building during storm events.

 

Management Strategy

Stormwater Overflow pit, grate and pipes to
remain in good condition, clear and unblocked.

 

Actions

Maintenance Contractor to be issued with
laminated copies of final ALTA Projects drawings
A6769/22/PDO01 to PDOS for reference.

Stormwater swales to be inspected at quarterly
intervals and after any event where more than
50mm of rain has fallen and cleared of any rubbish,
debris, plant litter etc which may block pit grates or
pipes.

Emergency Overflow pit grate to be inspected at
quarterly intervals and after any event where more
than 50mm of rain has fallen and cleared of any
blockages, rubbish, debris, plant litter

CCTV survey of Emergency Overflow pipes to be
carried out annually and reviewed for any signs of
ponding, blockages, breakages, pipe
degradation etc. Any problems identified to be
referred to ALTA Projects for review and further
advice.

Details of all inspections, observations, service
activities and remedial actions to be recorder in
service diary at the time of inspection/service.

 

Performance Indicators

No blockage of Stormwater Emergency Overflow
System.

 

Frequency/Deadline

Inspections and maintenance after rain events or
quarterly (whichever comes first).
CCTV Pipes annually.

 

Responsible Person

/Organisation

Site Owner to appoint and direct Maintenance
contractor.

Site Owner to ensure maintenance schedule
adhered to and review service diary.

Maintenance contractor to ensure swales, grates,
pits and pipes are inspected and serviced as
specified and ensure details of all inspections,
observations, service activities and remedial
actions are recorded in service diary.

 

 

 

Reporting and Review

 

Maintenance Contractor to make entries in service
diary.
Site Owner to review service diary annually.

 

 
Log in to download the original file

Stormwater Management Plan.pdf · 11.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.