Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.0    PROPOSED DEVELOPMENT

The proposed development consists of multi storey hotel buildings and villas
with basement carparking underneath and all buildings to be surrounded by
extensive terraced landscape areas, both hard and soft.

         vehicular entry to basements will be from Banksia Avenue while
service vehicles will access back of house areas via the cul-de-sac bowl at the
end of Serenity Close.

The existing concrete footpath at the eastern end of Serenity Close will be
extended westwards in order to provide street access for proposed villas and
requiring a length of existing concrete edge restraint and grassed swale to be
decommissioned to make way for kerb and channel and footpath. Existing
landscaping within the road reserve will be largely preserved in these areas.




4.0    STORMWATER TREATMENT & DISPOSAL OVERVIEW

Treatment and disposal of runoff will be carried out in accordance with the
approved document Settlers Cove Noosa Residential High Density Environmental
Management Plan (EMP 1) by WBM Oceanics Australia.

Alta Projects Engineers (formally TATE) were involved in formulation of the
overarching development approval document and EMP1 produced by WBM
Oceanics.

EMP1 recognises in particular the regimes of stormwater runoff and
infiltration which existed over the broader RHD site pre-development.

Essentially it was recognised that the RHD site lies atop a dune of poorly
graded sand with particularly high rainfall infiltration rates. As such the
natural state sees all rainfall for events up to 100 year ARI infiltrate the dune
close to where it lands and replenish the water table below with little or no
runoff.

The standing water table forms a profile similar to the shape of the dune,
albeit at a depressed scale and emerges as seepage flows adjacent Noosa inlet
at or about RL 5.0m.




__________________________________________________________________________

A6769/22/SWMP/RevA      October 2022                                         Page 2 of 6
SH/PL
                         Brah101 Pty Ltd t/as ALTA PROJECTS
Log in to download the original file

Stormwater Management Plan.pdf · 11.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.