c. All relevant Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
VEGETATION PROTECTION
Retention of Existing Trees and Vegetation
7. All trees and vegetation identified for retention must be protected in accordance with
AS 4970, Protection of trees on development sites and the relevant approved documents
and plans of this decision notice.
8. A qualified person* must be engaged for the duration of the works to:
a. Ensure works are carried out in accordance with the approved Arborist Report and
approved Concept – Construction and Tree Management Plan.
b. Oversee installation of all tree protection fencing prior to commencement of any
clearing works onsite.
c. Supervise tree protection within the development site and frontages, prior to, during
and following construction in accordance with AS 4970, Protection of trees on
development sites.
d. Oversee approved tree removal in proximity to retained trees.
*(Refer to Advisory Note)
9. Vegetation areas for protection must:
a. Be protected in accordance with the approved Arborist Report and approved Concept
– Construction and Tree Management Plan.
b. Be protected with a 1.8m high temporary safety fence (or temporary barrier mesh).
c. Have the fence installed prior to the prestart meeting and maintained for the entire
period of construction.
d. Have ‘Exclusion Zone’ (‘No Go’) signage fixed to the fence at 10m centres.
e. Have no construction material, equipment or personnel entering the ‘Exclusion zone’
(‘No Go’) except to undertake approved rehabilitation activities.
*(Refer to Advisory Note)
Fauna Management
10. A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance with the approved Fauna Management
Report (prepared by Biodiverse Environmental); and the Nature Conservation Act
1992.
b. Undertake pre-clearance fauna and habitat assessment on each day of vegetation
disturbance, to identify and fauna and habitat present
c. Ensure clearing works avoid nesting times of native fauna.
d. Co-ordinate staging and sequence of clearing with fauna protection.
e. Protect and recover fauna during clearing operations (not previously removed).
f. Manage the translocation of native animals and recovery procedures in accordance
with the approved fauna management plan and relevant legislation.
g. Undertake protection works for mulching of any stockpiled vegetation.
*(Refer to Advisory Note)
Page 11 of 15
Document Set ID: 24805097
Version: 3, Version Date: 11/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW25 0206 (As Pubished).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.