Original source · versioned page text
sdap-v2-6-state-code-8 (1).pdf
Performance outcomes Acceptable outcomes Response
development results in an acceptable
significant residual impact on a matter of state
environmental significance.
Statutory note: For Brisbane core port land, an offset
may only be applied to development on land identified
as E1 Conservation/Buffer, E2 Open Space or
Buffer/Investigation in the Brisbane Port LUP precinct
plan. For the Brisbane Port LUP, see
www.portbris.com.au.
Note: Guidance for determining if the development
will have a significant residual impact on the matter of
state environmental significance is provided in the
Significant Residual Impact Guideline, Department of
State Development, Infrastructure and Planning,
2014. Where the significant residual impact is
considered an acceptable impact on the matter of
state environmental significance and an offset is
considered appropriate, the offset should be delivered
in accordance with the Environmental Offsets Act
2004.
Table 8.2.2: All operational work
Performance outcomes Acceptable outcomes Response
Private marine development
PO17 Private marine development does not require No acceptable outcome is prescribed. Not applicable – no private marine development
the construction of coastal protection work, shoreline
or riverbank hardening or dredging for marine access
purposes.
Disposal of solid waste or dredged material from artificial waterways
PO18 Solid waste from land and dredged material No acceptable outcome is prescribed. Not applicable – no private marine development
from artificial waterways is not disposed of in tidal
water unless it is for beneficial reuse.
Disposal of dredged material other than from artificial waterways
State Development Assessment Provisions – version 2.6
State code 8: Coastal development and tidal works Page 5 of 7
[OCR of page images]
a aCSIT- Lae meleicereitl-)
development results in an acceptable
significant residual impact on a matter of state
environmental significance.
Statutory note: For Brisbane core port land, an offset
may only be applied to development on land identified
as E1 Conservation/Buffer, E2 Open Space or
Buffer/Investigation in the Brisbane Port LUP precinct
plan. For the Brisbane Port LUP, see
www.portbris.com.au.
Note: Guidance for determining if the development
will have a significant residual impact on the matter of
state environmental significance is provided in the
Significant Residual Impact Guideline, Department of
State Development, Infrastructure and Planning,
2014. Where the significant residual impact is
considered an acceptable impact on the matter of
state environmental significance and an offset is
considered appropriate, the offset should be delivered
in accordance with the Environmental Offsets Act
2004.
Acceptable outcomes
Response
Table 8.2.2: All operational work
Performance outcomes
Private marine development
Acceptable outcomes
Response
PO17 Private marine development does not require
the construction of coastal protection work, shoreline
or riverbank hardening or dredging for marine access
purposes.
No acceptable outcome is prescribed.
Not applicable — no private marine development
Disposal of solid waste or dredged material from artificial waterways
PO18 Solid waste from land and dredged material
from artificial waterways is not disposed of in tidal
water unless it is for beneficial reuse.
No acceptable outcome is prescribed.
Not applicable — no private marine development
Disposal of dredged material other than from artificial waterways
State Development Assessment Provisions — version 2.6
State code 8: Coastal development and tidal works
Page 5 of 7
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (sdap-v2-6-state-code-8 (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.