Original source · versioned page text
Fencing Details URB-P0003847-000-SP-APPENDIX(2of2)-240719
Very large file (11.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
HANDI-MATE ™ HM6 HINGED DOOR SHED INSTALLATION GUIDE
1. Place the L/H Barge Cap over the Roof Sheet at the front of the shed. The front face of the Barge Cap should fit up against
the Roof Sheets (Figure 7.6).
2. The ends of the Barge Cap Should align with the end of the Roof Sheet. Fasten two coloured 10x25 Hex-Head Screws with
Neo Washers through the front face of the Barge Cap and into the Wall Channel Assembly. Fasten two coloured 10x25 Hex-
Head Screws with Neo Washers through the top of the Barge Cap and into the crests of the Roof Sheets (Figure 7.6).
Install the R/H Barge Cap in the same manner on the front right side of the shed. Install the remaining L/H and R/H Barge Caps
to the rear of the shed in the same manner (Figure 7.6).
L/H Barge Cap
Roof Sheet
R/H Barge Cap
R/H Barge Cap
L/H Barge Cap
1. 2.
mm
Coloured 10x25 Hex-Head 220
Screw with Neo Washer
FIGURE 7.6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.