31 March 2023
Land Use – Commercial Log10 TSS (mg/L) Log10 TP (mg/L) Log10 TN (mg/L)
Base Storm Base Storm Base Storm
Flow Flow Flow Flow Flow Flow
Roof Mean 0 1.30 0 -0.89 0 0.37
Std. Dev. 0 0.38 0 0.34 0 0.34
Roads Mean 0.78 2.43 -0.6 -0.30 0.32 0.37
Std. Dev. 0.39 0.38 0.5 0.34 0.30 0.34
Ground Mean 0.78 2.16 -0.6 -0.39 0.32 0.37
Level/Open
Space Std. Dev. 0.39 0.38 0.5 0.34 0.30 0.34
Table 2 – Pollutant Export Parameters (Commercial)
5.4.3.5 Water Quality Objectives
The Water Quality Objectives of the receiving waters for the proposed development have been
obtained from State Planning Policy July 2017. The State Planning Policy load reduction targets are
summarised in Table 3 below.
WATER QUALITY OBJECTIVES
Total Suspended Total Nitrogen Total Litter/Gross
Solids (TSS) % (TN) % Phosphorous Pollutants % Oils/Grease
Reduction Reduction (TP) % Reduction Reduction
No visible films
80 45 60 90
or odours
Table 3 – Water Quality Objectives
5.4.3.6 Treatment Plan
In order to achieve the Water Quality Objectives for the proposed development, it is proposed to
use natural treatment methods to treat the runoff prior to discharge from the site.
Stormwater runoff from the roof will be captured in a series of new gutters, downpipes and pits,
which will discharge along with the remaining on ground catchments to the bioretention basin,
where Q1 flows will receive treatment while additional flows will discharge into the external
stormwater network.
Approximately 140m2 of the access driveway, footpath and landscaped areas will bypass the
bioretention basin. This bypass has been compensated for in the model so the overall net water
quality objectives are achieved for the development.
Stormwater collected from the roof will be harvested within the proposed 1.5kL slimline rainwater
tank. This volume will have the capacity for year-round toilet flushing reuse, meeting the water
Excellence with Economy in Engineering 10
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9300-
9399/9307/reports/31-03-23 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 5 - Amended Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.