31 March 2023
demand of 1018L/day. This approximation of water demand has been calculated using the
information within Table 4 below.
RAINWATER TANK ASSUMPTIONS
Time 8 hours a day, 5 days a week
96 children
People
17 adults
12L/single flush (adult)
Flush (L)
3.5L/flush (children’s toilet)
Frequency of Use 2 flushes per person, per day
Table 4 - Rainwater Tank Calculations
A grass lined swale will capture stormwater runoff along the southern lot boundary, in which
landscaped areas slope away from the proposed building and carpark. Pit and pipe network will
convey runoff into the bioretention basin for treatment.
Treated water will discharge off site via a proposed stormwater connection. The treatment plan for
the proposed development is depicted on MPN Plan 9307-CP.1.01 attached in Appendix 3, with
MUSIC excerpt in Figure 3.
Figure 3 – Treatment Plan
5.4.3.7 MUSIC Results
Excellence with Economy in Engineering 11
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9300-
9399/9307/reports/31-03-23 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 5 - Amended Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.