Skip to the record
Search everything, all in one place.

Council archive · source document

RFI - Attachment 5 - Amended Stormwater Management Plan · MCU22/0094

of 36

Plans and drawings: the text below has words only, no drawings.

Very large file (11.6 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

 31 March 2023


demand of 1018L/day. This approximation of water demand has been calculated using the
information within Table 4 below.


                                          RAINWATER TANK ASSUMPTIONS


                            Time                                      8 hours a day, 5 days a week

                                                                              96 children
                          People
                                                                               17 adults

                                                                        12L/single flush (adult)
                         Flush (L)
                                                                      3.5L/flush (children’s toilet)

                   Frequency of Use                               2 flushes per person, per day
                                          Table 4 - Rainwater Tank Calculations

A grass lined swale will capture stormwater runoff along the southern lot boundary, in which
landscaped areas slope away from the proposed building and carpark. Pit and pipe network will
convey runoff into the bioretention basin for treatment.

Treated water will discharge off site via a proposed stormwater connection. The treatment plan for
the proposed development is depicted on MPN Plan 9307-CP.1.01 attached in Appendix 3, with
MUSIC excerpt in Figure 3.




                                                  Figure 3 – Treatment Plan


5.4.3.7 MUSIC Results




 Excellence with Economy in Engineering                                                                11
 https://mpncnetau.sharepoint.com/sites/administration/shared            documents/9000-9999/9300-
 9399/9307/reports/31-03-23 stormwater management plan_issue d.docx

Used in these records

About this file

File size
11.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment 5 - Amended Stormwater Management Plan.pdf · 11.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.