Council archive · source document
RFI - Attachment 5 - Amended Stormwater Management Plan · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (11.6 MB): may take a few minutes to open.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
31 March 2023 Table of Figures Figure 1 – Proposed Development 5 Figure 2 – Site Location 6 Figure 3 – Treatment Plan 11 Table of Tables Table 1 – MUSIC Rainfall Runoff Parameters (Commercial) 9 Table 2 – Pollutant Export Parameters (Commercial) 10 Table 3 – Water Quality Objectives 10 Table 4 - Rainwater Tank Calculations 11 Table 5 – Percentage Based Load Reduction Results 12 Table of Appendices Appendix 1 Architectural Plans 17 Appendix 2 Site Survey 18 Appendix 3 MPN Plans 19 Appendix 4 Bioretention Basin Maintenance Checklist 20 Excellence with Economy in Engineering 4 https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9300- 9399/9307/reports/31-03-23 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 5 - Amended Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.