Council archive · source document
RFI - Attachment 5 - Amended Stormwater Management Plan · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (11.6 MB): may take a few minutes to open.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
31 March 2023
1 PURPOSE
This Stormwater Management Plan has been prepared as part of the Development Application for
the proposed child care development at Lot 4, Noosa Business Centre, Eenie Creek Road,
Noosaville.
2 INTRODUCTION
2.1 Project Description
The current proposal involves the construction of a new childcare centre within the Noosa
Business Centre, consisting of a single storey building, on-grade carparking, landscaped areas and a
bioretention basin. Access to the site will be via roads that are currently under construction off
Hofmann Drive. A new public thoroughfare will be located along the western boundary of the site.
The proposed Plan of Development is depicted on the architectural plans prepared by Elevation
Architecture, attached in Appendix 1, with excerpt below.
Figure 1 – Proposed Development
Excellence with Economy in Engineering 5
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9300-
9399/9307/reports/31-03-23 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 5 - Amended Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.