Council archive · source document
07/1841 - Representations Received [As Published] · 132007.1841
Amendment of condition 13 is requested to require minimum roof pitches in accordance with the approved plans. Condition 22 Condition 22 requires building K to remain in common property “to allow for research and development facilities to support the industrial uses". This requirement is both irrelevant to and an unreasonable imposition of the development. Building K will be utilised for both educational purposes and as common meeting/gym facility. There has never been any proposal for this facility to be for “research and development”. If the site is retained in a single ownership this condition would not create any operational difficulties, however if the site is subdivided under a community titles scheme it would mean that Building K had to remain under the ownership of the Body Corporate and could not be tet or sold on a commercial basis. This places an unrealistic economic burden on the developer and brings into question the financial feasibility and appropriateness of establishing this facility on the site. As detailed with the application, the applicant has proposed this facility as a community benefit to relocate the existing Noosa Community Training Centre currently existing elsewhere within the site and which will be demolished as a result of other site development. It is essential for the inclusion of this facility to be successful, that no restriction is placed on its titling ability. To ensure this facility can be utilised as a common meeting/gym facility for the overall development the condition could be amended to require the gym and toilet/shower facilities to be accessible at all times for use by other tenants, with the conference/meeting facility available on a booking system managed by the education tenant. Deletion of the requirement of condition 22 to remain in common property and reference to “research and development facilities” is requested. Condition 26 Condition 26 requires the driveway access connection to Rene Street to be a maximum width of 7m at the property boundary. This requirement would result in the inability of the development to achieve appropriate articulated vehicle access. Articulated vehicle access is considered necessary and required by the planning scheme. The driveway crossover shown on the proposal plan is based on Barlow Gregg VDM review of their Autoturn computer program. A drawing prepared by Barlow Gregg VDM showing the articulated vehicle swept path is attached in Appendix B. Amendment of condition 26 is requested to delete reference to a maximum width of 7m. Condition 36 Condition 36.1 requires carspace 8 to be a dedicated turning area and 36.2 requires carspace 9 to be dedicated as ‘staff’. Having regard to the layout plan and condition 36.2 which allows tandem staff parking for carspaces 9 and 10, it would seem more appropriate to dedicate carspace 9 as a turning area rather than carspace 8. This would achieve the same result in provision of a dedicated turning bay, but would improve the carparking situation by removing the tandem staff arrangement of spaces 9 and 10. Amendment of condition 36 is requested to require carspace 9 as the dedicated turning area. Condition 37.3, 39.3, 41.2, 42.2, 44.4 & 46.3 Conditions 37.3, 39.3, 41.2, 42.2, 44.4 & 46.3 require the loading bays to be clear of the carparking aisle. Upon review of the plans it is considered that this condition will have substantial design implications upon the approved layout, is not necessary to comply with AS2890.2 and is therefore an irrelevant and unreasonable imposition on the development. The applicant's traffic consultant Burchill VDM has provided the following advice:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.