MCU14/0106 Appendix D - Traffic Impact Assessment
Very large file: it may take a few minutes
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Traffic Impact Assessment
Noosa Civic Expansion
Figure 5-4 Intersection 1: Proposed Tewantin Bypass Layout
Table 5-6 Intersection 1: SIDRA Results – Proposed Tewantin Bypass Layout
Thursday PM Peak Hour Saturday AM Peak Hour
Scenario
95th%le 95th%le
DOS Delay (sec) DOS Delay (sec)
Queue (m) Queue (m)
2028 Background 0.71 12 64 0.67 11 48
2028 with Development 0.84 16 107 0.73 13 58
The results indicate that the reconstructed roundabout layout (as per Council’s proposed PIP program) will
have adequate capacity for the background and development scenarios at the 2028 design horizon. As the
reconstruction of the roundabout is expected, by Council’s PIP, to be underway by 2021, the intersection will
accommodate the development volumes by 2024, and beyond 2028.
J13041 Cardno December 2014
Prepared for QIC Noosa Civic Pty Ltd Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.