17.1 Public Passenger Transport State Code
Table 17.1.1: Material change of use and reconfiguration of a lot
Performance Outcomes (PO) Acceptable Outcomes (AO) PO/AO Response
All development
PO1 During construction, development ensures bus No acceptable outcome is prescribed. N/A It is not anticipated that the construction of the development
stops continue to function and pedestrian access to will impact on the operation of existing bus stops.
the bus stop is maintained at all times. Construction management plans can address any impacts
as necessary.
Accommodation activity (other than a residential care facility), educational establishment, airport, hospital, shopping centre or business activities
PO2 Development allows for safe, convenient and AO2.1 Where a development proposes a new or modified AO The development proposes no change to the current
efficient access for public passenger transport and road network it must provide for bus movement through transport infrastructure. The Council has proposed future
allows for the progressive staging or extension of the site whilst avoiding backtracking, looping or indirect provision to accommodate an intra-regional transport facility
public passenger transport to the development. routes. on the site.
Editor’s note: To demonstrate compliance with this acceptable The expansion allows direct access to the public transport
outcome, it is recommended that a Public Transport Impact hub located in the existing shopping centre area. The
Assessment be prepared in accordance with Appendix 1 of the internal road network is provided in a loop configuration, in
State Development Assessment Provisions Supporting
accordance with the Shire Business Centre road network as
Information – Public Passenger Transport, Department of
Transport and Main Roads, 2014. indicated in the Noosa Plan. The proposed network allows
for bus movement to all areas of the site, including the future
proposed intra-regional transit facility.
AO2.2 Roads intended to allow the movement of buses AO The development proposes no change to the current
are designed in accordance with the code for IDAS transport infrastructure. The Council has proposed future
prescribed in the Transport Planning and Coordination provision to accommodate an intra-regional transport facility
Regulation 2005. close to the site.
Bus access is largely proposed via the existing road network
along existing bus routes.
PO3 New or modified road accesses and No acceptable outcome is prescribed. PO The development proposes no change to the current
modifications to the road network do not conflict transport infrastructure. Existing public transport stops and
with existing bus stops or a public passenger services will continue to utilise existing the existing road
service. network and access points.
Editor’s note: To demonstrate compliance with this
performance outcome, it is recommended that a Public
Transport Impact Assessment be prepared in accordance
with Appendix 1 of the State Development Assessment
Provisions Supporting Information – Public Passenger
Transport, Department of Transport and Main Roads,
2014.
State development assessment provisions Module 17 — Public and active transport 17.1 Public passenger transport state code
20 June 2014 V1.4 Page 1 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.