Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

MCU14/0106 Appendix D - Traffic Impact Assessment

of 75

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

19.2       Transport Infrastructure and Network Design State Code
Table 19.2.1: All development

Performance Outcomes (PO)                                         Acceptable Outcomes (AO)                                         PO/AO      Response
All state transport infrastructure – except state-controlled roads
PO1 Development does not compromise the safe                      No acceptable outcome is prescribed.                              PO        A Traffic Impact Assessment has been prepared
and efficient management or operation of state                                                                                                to support the proposed development. Any
transport infrastructure or transport networks.                                                                                               impact on the adjacent road network is
Editor’s note: To demonstrate compliance with this                                                                                            manageable or resolvable with upgrading works.
performance outcome, it is recommended that a traffic
impact assessment be prepared. A traffic impact
assessment should identify any upgrade works required to
mitigate impacts on the safety and operational integrity of
the state transport corridor, including any impact on a
railway crossing. An impact on a level crossing may
require an Australian Level Crossing Assessment Model
(ALCAM) assessment to be undertaken.
PO2 Development does not compromise planned                       AO2.1 The layout and design of the proposed development           PO        The development does not compromise planned
upgrades to state transport infrastructure or the                 accommodates planned upgrades to state transport                            upgrades to State Transport infrastructure.
development of future state transport infrastructure              infrastructure.
in future state transport corridors.                              AO2.2 The layout and design of the development                    PO        The development does not compromise planned
Editor’s note: Written advice from DTMR advising that             accommodates the delivery of state transport infrastructure in              upgrades to State Transport infrastructure.
there are no planned upgrades of state transport                  future state transport corridors.
infrastructure or future state transport corridors that will be
compromised by the development, will assist in                    Editor’s note: To demonstrate compliance with this acceptable
addressing this performance outcome.                              outcome, it is recommended that a traffic impact assessment be
                                                                  prepared.

State-controlled roads
PO3 Development does not compromise the safe                      No acceptable outcome is prescribed.                              PO        All development access is via the local transport
and efficient management or operation of state-                                                                                               network. The development impact on the state
controlled roads.                                                                                                                             infrastructure is not considered to be significant.
Editor’s note: A traffic impact assessment will assist in
addressing this performance outcome.
PO4 Development does not compromise planned                       AO4.1 The layout and design of the development                    PO        The development does not compromise planned
upgrades of the state-controlled road network or                  accommodates planned upgrades of the state-controlled road                  upgrades to State Transport infrastructure.
delivery of future state-controlled roads.                        AO4.2 The layout and design of the development                    PO        The development does not compromise planned
Editor’s note: Written advice from DTMR that there are no         accommodates the delivery of future state-controlled roads.                 upgrades to State Transport infrastructure.
planned upgrades of state-controlled roads or future state-
                                                                  Editor’s note: To demonstrate compliance with this acceptable
controlled roads which will be compromised by the
                                                                  outcome, it is recommended that a traffic impact assessment be
development will assist in addressing this performance
                                                                  prepared.
outcome.


State development assessment provisions                                Module 19 — State transport network functionality                 19.2 Transport infrastructure and network design state code
20 June 2014 V1.4                                                                                                                                                                           Page 1 of 2
Log in to download the original file

MCU14_0106 Appendix D - Traffic Impact Assessment.pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.