2016-07-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 JULY 2016
A detailed description of vehicular access to collect waste. Where
collection is off street, access must allow vehicles to enter and leave the
site in a forward direction.
96. The waste storage area for independent living units and clubhouse must:
96.1. Be located with direct access off Trading Post Road.
96.2. Have a turning area suitable for a 12.5m length HRV.
96.3. Be completed in time to accommodate the occupation of any stage 1A
units.
96.4. Be provided with additional waste and recycling receptacles as further
stages are completed.
97. The waste storage area for the aged care facility must be located directly
adjacent to the loading bay driveway.
B. Approve the Reconfiguring a Lot application (REC15/0031) in accordance with the
following conditions
Reconfiguring a Lot Conditions for 4 Lots into 3 – REC15/0031
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by these conditions must be
completed prior to submission of the subdivision plan to Council for compliance
assessment.
Approved Plan
2. Development, including staging of the development, shall be undertaken in
accordance with this approval and must generally comply with the approved
plans of development. The approved plans are titled and numbered:
Plan Title Drawing Reference Revision Date Prepared by
Plan of Proposed CO-ROL-2015 A 11/09/2015 Palm Lake Works
Reconfiguration
and as may be amended by these conditions.
Lot Amalgamation and Road Dedication
3. The Plan of Survey must include any road reserve dedications for any
necessary road widening for the proposed roadworks, electrical transformers
and truncation at the intersection of Pearsons Road with Elm Street to ensure
the existing power lines crossing this corner of the site are located within road
reserve. The new boundary line setback from the power line shall be in
accordance with ENERGEX’s requirements and adequate to accommodate any
proposed or future roadworks and pathway at this corner of the site.
4. Pursuant to s342 of the Sustainable Planning Act 2009, the Development
Permit for Reconfiguring a Lot lapses if the subdivision plan has not been
registered by the relevant titles authority commenced by 21 July 2020.
Page 17 of 19