Original source · versioned page text
2016-07-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 JULY 2016
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally, Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.
Mosquito Protection
92. A Management Plan must be submitted for the control of mosquitos from the
three large water basins, including form of construction of basins, vegetation in
and along the shoreline, on-going monitoring and eradication treatments. Plan
is to be approved by Council’s Environmental Health Section.
Noise Management
93. The location and operational hours of mechanical plant equipment including
domestic air conditioning units, is not to create a noise nuisance to occupiers.
94. Noise from building works associated with residential development must comply
with the following–
94.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
94.2. All reasonable measures are taken to minimise noise emissions.
94.3. Not permitted on Sunday or public holidays.
Waste Management
95. A Waste Management Plan (Operational) in accordance with Planning Scheme
Policy No. 9 Waste Management must be submitted for the day-to-day
operation of the development and approved by Council’s Waste and Health
Section prior to issue of development permit for operational works.
It is critical that waste areas are properly planned. A copy of Planning Scheme
Policy No. 9 Waste Management explaining exactly how to predict waste
quantities and design waste areas is available from Council and online. The
Plan shall include the following information:
The types of waste that will be generated from the activities approved
within the development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Initiatives to minimize waste either by waste prevention, reduction, re-use
or recycling.
Description of procedures for getting all waste to the bins; the storage of
bins and the collection of bins by the contractor.
A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing
and system to prevent storm water getting into sewer via the bin wash.
A description of types and volume of waste storage containers to be
used.
The waste and recycling storage areas shall include the provision of
containers for all waste and recycling materials including putrescible
matter, non-recycling waste, paper/cardboard, glass, aluminium/steel
cans, waste oil, styrofoam boxes, etc, and bin washing facilities
connected to sewer at each storage area.
Page 16 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.