Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2016-07-18 General Committee Meeting Notes

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                       18 JULY 2016


                                    sheet 1 of 2
         Staging Plan               CO-000-2014         H      13/11/2015    Palm Lake Works
         As annotated by Council    sheet 2 of 2

         Site Plan [Aged Care]      01.1                -      21/08/2015    Interworks
         Elevations [Aged Care]     02.1                -      21/08/2015    Interworks
         Clubhouse Cover Sheet      CC000               A      15/10/2015    PAA Design
         Clubhouse Site Plan        CC101               B      15/10/2015    PAA Design
         Clubhouse Floor Plan       CC102               B      15/10/2015    PAA Design
         Clubhouse Roof plan        CC103               B      15/10/2015    PAA Design
         Clubhouse Elevations       CC105               B      15/10/2015    PAA Design
         Bowls Green floor plan     CO-BG-2015          A      23/11/15      Palm Lake Works
                                    Sheet 1 of 3
         Bowls Green Elevations 1   CO-BG-2015          A      23/11/15      Palm Lake Works
                                    Sheet 2 of 2
         Bowls Green Elevations 2   CO-BG-2015          A      23/11/15      Palm Lake Works
                                    Sheet 3 of 3
         Golf & Workshop            CO-GC-2015          A      23/11/15      Palm Lake Works
                                    Sheet 1 of 1

        and as may be amended by these conditions.

        Nature and Extent of Approved Use
        2.    The approved development comprises the following:
                  220 Independent Living Units (each having a maximum of 2 bedrooms +
                    study), associated common facilities and 1 caretaker’s residence; and
                  120 Bed Aged Care Facility.

        General
        3.    Security in the form of a cash bond or trading bank guarantee to the sum of
              $100,000 must be submitted, to secure performance of all conditions of this
              approval, prior to the commencement of Stage 1 of the development. The cash
              bond or trading bank guarantee will be returned on performance of the
              conditions of approval less any costs incurred by Council in respect of enforcing
              performance of this permit.
        4.    The requirements of this development approval are to be effected, prior to the
              use of the premises. Council reserves the right to call upon the bond or
              guaranteed sum referred to in this approval to effect compliance with
              conditions.
        5.    The development must be undertaken and operated in a manner that causes
              no detrimental effect upon the amenity of the neighbourhood by reason of the
              creation of off-site parking impacts, excessive noise, lighting nuisance or other
              emissions.



                                                                                 Page 3 of 19
Log in to download the original file

2016-07-18 General Committee Meeting Notes(PDF, 540KB).pdf · 553 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.