GENERAL COMMITTEE MEETING                                                      18 JULY 2016


        6.   The requirements for the associated Reconfiguration of a Lot approval included
             in this permit must be completed and Endorsement of the Plan of Survey by
             Council must be obtained prior to any commencement of any use approved by
             this Development Permit.
        7.   The Development Permit for a material change of use lapses if the use has not
             commenced by 21 July 2020. The uncompleted aspects of this development
             approval lapse if the whole of the approved use has not happened by 21 July
             2024.
        Staging
        8.   The development may be staged in accordance with the approved plan titled
             “Staging Plan” CO-000-2014 Sheet 02/02 Revision H dated 13 November 2015
             (as annotated by Council) and as follows:-
             8.1. The following works shall be undertaken and completed prior to the
                  commencement of use of Stage 1a:
                  8.1.1. All roadworks on the Main Road of Cooroy Connection Road (Elm
                         Street) including the upgrading works for the road intersections with
                         Pearsons Road, linemarking and pedestrian refuge crossing, as
                         required by conditions of this approval.
                  8.1.2. All frontage works including footpaths and landscaping for Trading
                         Post Road, Pearson Road and Elm Street as required by conditions
                         of this approval.
                  8.1.3. A Bus stop and shelter on the eastern side of Elm Street as
                         required by conditions of this approval.
                  8.1.4. A Bus stop and shelter on the western side of Elm Street as
                         required by conditions of this approval.
                  8.1.5. A pedestrian refuge crossing and lighting associated with the bus
                         stop pair on Elm Street.
                  8.1.6. All fencing to Trading Post Road and Pearson Road, and all
                         acoustic fencing to Elm Street as required by the approved Acoustic
                         Report.
                  8.1.7. Landscaping treatments to open space areas associated with Stage
                         1a including the establishment and rehabilitation of all detention
                         basins, the establishment of landscaping buffers to site boundaries
                         and adjoining residential properties and street trees.
             8.2. The following works shall be undertaken and completed prior to the
                  commencement of use of Stage 4:
                  8.2.1. All roadworks, access and frontage works and landscaping for
                         Lamonts Road as required by conditions of this approval.
                  8.2.2. All fencing to Lamonts Road.




                                                                                Page 4 of 19
Log in to download the original file

2016-07-18 General Committee Meeting Notes(PDF, 540KB).pdf · 553 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.