RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 JULY 2016
25. A 2m wide path on Elm Street shall be constructed from the pedestrian access
point that fronts Elm Street (Gatehouse). The path shall be in accordance with
Council’s design standards and to an alignment that protects any significant
vegetation and above and underground services. The works shall be included
in Stage 1a and be in accordance with a Development Permit for Operational
Works. This condition is imposed pursuant to s665 of the Sustainable Planning
Act 2009 being non-trunk infrastructure.
Bus Stops
26. The applicant shall design and construct a bus stop and shelter on Elm Street
to the frontage of Lot 135 MCH 978 (north of 156 Elm Street) at approximately
70m south of the center line of Pearson Road intersection (or an alternative
location as may be required by TransLink or DTMR). The works shall be
included in Stage 1a and be in accordance with a Development Permit for
Operational Works. This condition is imposed pursuant to s665 of the
Sustainable Planning Act 2009 being non-trunk infrastructure.
27. The applicant shall design and construct a bus stop and shelter on western side
of Elm Street to be located generally opposite the other required new bus stop
on the eastern side of Elm Street. The works shall be included in Stage 1a and
be in accordance with a Development Permit for Operational Works. This
condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
28. The proposed bus stops are to be “Indented” and be in accordance with the
current TransLink Public Transport Infrastructure Manual. The bus stop must
contain all Mandatory and Preferred components as stated in the manual for
‘intermediate stop’, and be constructed in accordance with the new Noosa
Council Custom Design Rural Bus Shelter.
29. A pedestrian refuge island must be constructed on Elm Road in Stage 1a to
provide pedestrian access connection to the new bus stop shelter on the
western side of Elm Street. The works shall also include any necessary
pathway on western side Elm Street to provide the required connection. This
refuge island must be included in the design and the construction of the
intersection of Pearsons Road with Elm Street and must include all the
mandatory requirement (e.g. lighting) in compliance with the relevant standards.
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
External Road/Frontage Works to Council Roads
30. The applicant must design and construct kerb and channelling along the
western side of Pearsons Road with any associated road widening and
drainage works to achieve Local Road standard for urban area (8m Kerb to
Kerb) in accordance with Council’s Planning Scheme Policy 5 - Engineering
Design Standards – Roads, Drainage and Earthworks. The works shall be
included in Stage 1a and be in accordance with a Development Permit for
Operational Works. This condition is imposed pursuant to s665 of the
Sustainable Planning Act 2009 being non-trunk infrastructure.
Page 7 of 19