Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Delegated Report - Code - Planning OPW25 0121 (As Published)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

                      a.      Landscaping certification confirming all works have been constructed in accordance
                              with conditions of approval.
                      b.      AS2303 Tree Stock for Landsape Use certification
                      (* Refer to Advisory Note)
                      On Maintenance
               77.    Maintenance periods* must be:
                      a.      12 months for Streetscape Landscape.
                      b.      36 months for Rehabilitation or subject to meeting final performance criteria.
                      *(Refer to Advisory Note)
               78.    Prior to requesting an On Maintenance inspection the following (prepared by respective
                      qualified persons* and certifying compliance with approvals) must be submitted to Council:
                      a.      Landscaping certification.
                      b.      AS2303 Tree Stock for Landsape Use certification
               79.    On Maintenance management includes:
                      a.      Establishing and maintaining the works in accordance with the intent and requirements
                              of all approvals.
                      b.      To aesthetically compliment the surrounding local area.
                      c.      Rectification of works failing ‘on ground’ to a solution that still meets approval intents.
                      d.      Regular mowing, weeding and fertilising of grass areas.
                      e.      Mulching, fertilising and aeration of garden areas.
                      f.      Cleaning of all external surfaces including prompt removal of graffiti.
                      g.      Replacement of dead or poorly performing plants.
                      Off Maintenance
               80.    Prior to requesting an Off Maintenance inspection the following must be provided:
                      a.      Written request of bond release.
               81.    Off Maintenance Inspection must be requested:
                      a.      By contacting Council.*
                      b.      Only after lodgement of all required certification and documentation.
                      c.      Only after all works are confirmed in good order including:
                             i.        Rectifying any damaged grassed areas.
                            ii.        Topdressing to grassed areas.
                           iii.        Remulching, fertilising and aeration of garden areas.
                           iv.         Replacement of plant material.
                            v.         Removal of plant material impeding regulation sightlines.
                      *(Refer to Advisory Note)
               5.     REFERENCE DOCUMENTS

                Plan No.                    Rev.   Plan/Document Name                                 Date

                25221-001                   0      Geotechnical Investigation                         28 August 2025


                                                                                                          Page 19 of 22

Document Set ID: 24187118
Version: 9, Version Date: 04/12/2025
Log in to download the original file

Delegated Report - Code - Planning OPW25 0121 (As Published).pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.