Delegated Report - Code - Planning OPW25 0121 (As Published)
• Update maintenance access ‘Top of Bund treatment’ to be
Turf or gravel or similar capable of being traversed by a
maintenance vehicle.
D25071-LP-04 C Landscape Plan Sheet 04 of 06, prepared 24/10/2025
by The Landscape Group
Amendments • Update the plans to include 30 trees, each with a minimum
pot size of 300mm, evenly distributed across the batters on
the northern side (end) of the new road and the batters
(north and west)within Lot 7. The plant species to be utilised
must include:
i. Grevillea ‘Honeygem’
ii. Syzygium leuhmannii
iii. Backhousia citiodora
iv. Tristaniopsis laurina ‘Luscious’
v. Callistemon viminalis.
vi. Waterhousea floribunda
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 28 November 2027, unless an application to extend the currency
period is approved by Council.
SITE SPECIFIC CONDITIONS
3. Prior to the Operational Works prestart meeting receipt of amended landscape plans
approval is required.
4. A lock and rail must be provided within Lot 8 at the entrance to the maintenance access track
to the bioretention basin. The lock and rain must be located wholly within Lot 8 and the
associated drainage easement.
Bonds
5. A site control and/or compliance bond of $30,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
6. Prior to the Operational Works prestart meeting, a bank guarantee or a bond of $10,000 must
be lodged as security for the completion of the street trees, rehabilitation works and three-
year performance maintenance period identified in the conditions of this approval.
7. The following amounts of the bank guarantee/bond may be returned at the end of each
performance criteria year following Council approval as follows:
a. Year 1 and 12 month street tree maintenance period - $2,500
b. Year 2 - $2,500
c. Year 3 - $5,000
Page 7 of 22
Document Set ID: 24187118
Version: 9, Version Date: 04/12/2025