Original source · versioned page text
SUPERSEDED Approved Document Fauna Management Plan v1 OPW25/0140
Plans and drawings: the text below has words only, no drawings.
Very large file (11.4 MB): may take a few minutes to open.
Fauna Management Plan 44 Hoy Road, Lake McDonald PRE-CONSTRUCTION ACTIVITY CHECKLIST. Action Task Responsibility Timing Appoint • Appoint licensed Wildlife Spotter Catcher. Project / Site Prior to any licensed Wildlife Licensed Wildlife Spotter Catcher is a person or Manager, vegetation Spotter Catcher company holding a current Rehabilitation Wildlife Spotter clearing Permit issued by the State Government. Catcher • Advise Council of appointment of licensed Wildlife Spotter Catcher. Pre-clearing • Undertake a survey of the fauna habitat Environmental Prior to any survey of fauna features of impacted vegetation, including scientist, Wildlife vegetation habitat features number of hollows removed and what fauna Spotter Catcher clearing impacted by species are likely to be impacted, number of vegetation hollow logs, as well as number of nests or clearing possum dens. The location and details of additional habitat features that have not already been identified in this FMP should be recorded and mapped using a GPS, with hollow-bearing trees marked with flagging tape to assist in relocating those able to be salvaged. • A scaled map showing the location of the habitat features is to be prepared and included in the pre-clearing survey report (refer below). • Include as part of this survey the identity of any fauna species confirmed as occupying or utilising hollows, including native bees and their hives (e.g. Trigona spp., Austroplebeia spp.). • Vegetation containing Koala(s) and other fauna is to be demarcated with high visibility flagging tape. Pre-clearing • The Wildlife Spotter Catcher is to compile and Wildlife Spotter Prior to the survey report submit a pre-clearing survey report to Council, Catcher, Project / pre-start detailing all of the abovementioned survey Site Manager meeting results. This is to include the location and a description of all flagged habitat features, along with recommendations on appropriate clearing methodologies and fauna capture / removal techniques. A scaled map showing the location of the habitat features is to be prepared and included in the pre-clearing survey report. Site induction • The Wildlife Spotter Catcher must clearly Contractor, Prior to any and define the allowable and non‐allowable Wildlife Spotter vegetation preliminaries methods of vegetation clearing, such that the Catcher, Project / clearing risk of harm or death to wild animals is Site Manager minimised prior to the commencement of clearing works. • The Wildlife Spotter Catcher must identify any requirements for special plant or equipment (such as cherry pickers or cranes). 26 | 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.