Original source · versioned page text
SUPERSEDED Approved Document Fauna Management Plan v1 OPW25/0140
Plans and drawings: the text below has words only, no drawings.
Very large file (11.4 MB): may take a few minutes to open.
Fauna Management Plan 44 Hoy Road, Lake McDonald Action Task Responsibility Timing • All site personnel must sign a register noting they have been advised of and will comply with the requirements of this FMP. Pre-start • All site personnel involved in clearing works Contractor, Immediately meeting must attend a pre-start meeting to: Wildlife Spotter prior to Catcher, Project / vegetation ˗ Confirm that all pre-start requirements Site Manager, clearing (above) have been met, ˗ Identify any special habitat features Council officer (if identified as part of the pre-clearing survey, required) ˗ Discuss the sequence of clearing works, ˗ Outline wildlife capture and management procedures, ˗ Outline the procedure for compliance with any Animal Welfare Directions, and, ˗ Discuss any outstanding issues or questions with regard to roles and responsibilities. CONSTRUCTION ACTIVITY CHECKLIST. Action Task Responsibility Timing Supervise • Licensed Wildlife Spotter Catcher is to: Contractor, Immediately clearing works Wildlife Spotter prior, during ˗ Supervise and be present on each day that Catcher, Project / and following vegetation clearing takes place. Site Manager all vegetation ˗ Inspect site vegetation with contractor ahead clearing of clearing to check for presence of fauna. activities ˗ Maintain, a clear view of vegetation or habitat features being cleared by machinery, such that wild animals that are disturbed or uncovered during such activities are rapidly detected. ˗ Maintain two‐way radio contact with machinery operators during the removal of vegetation or other potential habitat features. • If wildlife is detected during such activities, the Wildlife Spotter Catcher must take immediate action to notify the machinery operator to cease work, either verbally using two-way radio or by visual commands, until such time as the wildlife is captured or otherwise removed from danger. Trees containing fauna must not be felled until the fauna has been removed by a certified spotter catcher. • Wildlife observed to be utilising trees or other habitat features prior to, and immediately following, clearing activities to be managed in accordance with management procedures outlined under relevant fauna management scenarios in Table 5. 27 | 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.